About this file

This document contains an attachment for a construction and design experience project data sheet as well as information on a related federal contract opportunity for the restoration of outfitting capacity at Berth 6C in Portsmouth Naval Shipyard in Kittery, Maine.

The project data sheet attachment requests information on up to five relevant past construction or design projects to be submitted by offerors, including contract details, award and completion dates, project descriptions, types of work performed, and construction or design fees. The related federal contract opportunity is a design-bid-build solicitation for the restoration of outfitting capacity at Berth 6C issued by the Department of the Navy Naval Facilities Engineering Command. It provides the solicitation number, name, opportunity type, agency details, and notes that a full RFP is attached. The response is due by the date specified in the RFP.

View the file

Other files for this federal contract opportunity

Other files attached to Restore Outfitting Capacity, Berth 6C, newest first.
File Type Posted
N4008522R2578 AMENDMENT 0006.pdf PDF
AMENDMENT 0005_Revised Sheet G-106 - Phase 3.pdf PDF
REV2_Berth 6 Bid Schedule.pdf PDF
N4008522R2578 AMENDMENT 0005.pdf PDF
N4008522R2578 AMENDMENT 0004.pdf PDF
N4008522R2578 AMENDMENT 0003.pdf PDF
Amendment 0003_Sheet ES507.pdf PDF
N4008522R2578 AMENDMENT 0002.pdf PDF
Revised Berth 6_Final Bid Schedule.pdf PDF
N4008522R2578 AMENDMENT 0001.pdf PDF
1977-Additional Crane Rail System Construction Drydock No. 1 Berths 6 7.pdf PDF
2002 - 1728A Berth 6 Bollards - Drawings.pdf PDF
2000 - 1337C Berth 5 and 6 Repairs Drawings.pdf PDF
2014-Structural Repairs to Berths 6A 6B and 6C.pdf PDF
1974 - Berth 6 Repairs.pdf PDF
1943 - Berth 6 Crane Track Foundations.pdf PDF
B6_Updated Final Design Drawings_Signed.pdf PDF
Berth 6_Final Bid Schedule.pdf PDF
ATTACHMENT B Past Performance Questionnaire.pdf PDF
Attachment A - PPI Inquiry Log.xls XLS spreadsheet
ATTACHMENT F SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
ATTACHMENT D HISTORICAL SMALL BUSINESS UTILIZATION.docx DOCX document
1659622spc01of01.pdf PDF
2019-Sea Level Rise Mitigation Wall B5 AND B6A_Rev10.4.19.pdf PDF
Appendix E Berth 6 NAVFAC ISRL.XLSX XLSX spreadsheet
N4008522R2578.pdf PDF
1982 - Track Replacement Berth 6.pdf PDF
Appendix D Berth 6 eOMSI Workbook.xlsx XLSX spreadsheet
UFGS4288 Submittal Register.xlsx XLSX spreadsheet
Attachment G - PIEE Vendor Access Instructions.pdf PDF
1975 - Eval. of Exisiting Crane Foundations Berth 6.pdf PDF
Appendix B Berth 6 Geotechnical Report.pdf PDF
Appendix A Berth 6 HAZMAT Survey.pdf PDF
ATTACHMENT E SPCD.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

1. Experience for: Offeror Joint-Venture Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

New Construction Renovation Repair Alteration Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build RFP Development Designer of Record Engineering Services Full Plans & Specs

Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.:

unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information: