Appendix E Berth 6 NAVFAC ISRL.XLSX

XLSX spreadsheet 60 KB Posted

Attached to
Restore Outfitting Capacity, Berth 6C Federal contract opportunity
Solicitation number
N4008522R2578
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an internal services requirements list template to be filled out by the government and contractor regarding janitorial, electrical, mechanical, and other building systems and services for a naval facility project to restore berthing capacity at Berth 6C. The template requires input of information such as room details, quantities of accessories and cleaning equipment, descriptions of fire suppression and alarm systems, boilers, HVAC equipment, backflow preventers, electrical panels and generators, lighting protection, emergency lighting, and stormwater management systems. It also includes sections for recurring maintenance services such as grounds, waste removal, and pest control. The related federal contract opportunity is solicitation N4008522R2578 for the Restore Outfitting Capacity project at Berth 6C of the Portsmouth Naval Shipyard in Kittery, Maine.

View the file

Other files for this federal contract opportunity

Other files attached to Restore Outfitting Capacity, Berth 6C, newest first.
File Type Posted
N4008522R2578 AMENDMENT 0006.pdf PDF
REV2_Berth 6 Bid Schedule.pdf PDF
AMENDMENT 0005_Revised Sheet G-106 - Phase 3.pdf PDF
N4008522R2578 AMENDMENT 0005.pdf PDF
N4008522R2578 AMENDMENT 0004.pdf PDF
N4008522R2578 AMENDMENT 0003.pdf PDF
Amendment 0003_Sheet ES507.pdf PDF
Revised Berth 6_Final Bid Schedule.pdf PDF
N4008522R2578 AMENDMENT 0002.pdf PDF
N4008522R2578 AMENDMENT 0001.pdf PDF
2019-Sea Level Rise Mitigation Wall B5 AND B6A_Rev10.4.19.pdf PDF
N4008522R2578.pdf PDF
1975 - Eval. of Exisiting Crane Foundations Berth 6.pdf PDF
Appendix B Berth 6 Geotechnical Report.pdf PDF
Appendix A Berth 6 HAZMAT Survey.pdf PDF
ATTACHMENT E SPCD.docx DOCX document
1977-Additional Crane Rail System Construction Drydock No. 1 Berths 6 7.pdf PDF
2002 - 1728A Berth 6 Bollards - Drawings.pdf PDF
2000 - 1337C Berth 5 and 6 Repairs Drawings.pdf PDF
2014-Structural Repairs to Berths 6A 6B and 6C.pdf PDF
1974 - Berth 6 Repairs.pdf PDF
1943 - Berth 6 Crane Track Foundations.pdf PDF
B6_Updated Final Design Drawings_Signed.pdf PDF
Berth 6_Final Bid Schedule.pdf PDF
ATTACHMENT C Construction and Design Exp Project Data Sheet.pdf PDF
ATTACHMENT B Past Performance Questionnaire.pdf PDF
Attachment A - PPI Inquiry Log.xls XLS spreadsheet
ATTACHMENT F SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
ATTACHMENT D HISTORICAL SMALL BUSINESS UTILIZATION.docx DOCX document
1659622spc01of01.pdf PDF
1982 - Track Replacement Berth 6.pdf PDF
Appendix D Berth 6 eOMSI Workbook.xlsx XLSX spreadsheet
UFGS4288 Submittal Register.xlsx XLSX spreadsheet
Attachment G - PIEE Vendor Access Instructions.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank ISRL

NAVFAC Internal Services Requirements List
Project Name (include BLDG#): Berth 6 Repairs and Improvements e-Project# 1659622
**** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy***
CURRENT INVENTORY - FILLED OUT BY GOVERNMENTFILLED OUT BY CONTRACTORINFORMATION ONLYNEW INVENTORY - CONTRACTOR
Janitorial Accessories & Cleaning Services Required - ** ATTACH FLOOR PLAN CADD FILE **A
Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) and Room NumberRoom #INFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesRoom Use (Administration / Bathroom / Kitchenette / Locker Room, etc)Room NumberFlooring Type (VCT, Resilient, Carpet, Ceramic, Concrete, Wood, other)Square Footage (Include Shower Floors)Planned Number of OccupantsShower Square FootageQuanities(Dispensers MUST be compatible with existing Paper and Soap Products. Consult with FSC)equipment to include in this report are:Square Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
FloorsWallsToiletsUrinalsSinksMirrorsWater FountainsLockersPaper Towel DispensersToilet Paper DispensersSoap DispensersSoap (Grit) DispensersPaper Towel DispensersSoap DispensersSquare Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
Toilet Paper DispensersRecessed Trash Cans
FlooringFixtures
Fire Suppression
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTFire Pump DataFire Pump Driver Datasystems to include in this report are:Pre ActivationDelugeD-DripAir CompressorFire PumpsPump DataStand PipeCO2Wet ChemicalDry ChemicalFoamClean AgentRange Hoods
ManufacturerGPMManufacturerModelSerial #HPRPMAutomatic Sprinkler SystemsGas Systems
Fire Pumps and DriversChemical Systems1DieselCummins6BTA59F2082500Peerless2500 GPM2
Air CompressorsRange HoodsElectricMarathonXF404TSTDS7026HNW1001775Peerless2500 GPM
Stand PipesFoam Systems
Drum Drips
Fire Alarm Systems Equipment
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesControl PanelHeat and Smoke DetectorsAddressable SystemHorn Strobessystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
ManufacturerModelTypeSmoke or HeatMfgrModelYes or NoQuantityFire Alarm System ComponentsModelMBHFuelCertification ExpirationNational Board Number
Boilers, Furnaces, Heating Equipment
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTManufacturerModelSerial #MBHFuelDate of Manufacturesystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
Boilers
Furnaces
HVAC
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityUnique IDManufacturerModelSerial #Tonnage / HP# of FiltersSize of FiltersBelt SpecsRefrigerantsystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
Major HVAC Components
Boilers and Unfired Pressure Vessels (UPV) Certification
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTBoiler or UPVDescriptionNational Board #USN NumberDate Inspectedsystems to include in this report are:ModelMBHFuelCertification ExpirationNational Board Number
Boilers
Pressure Vessels
Back Flow Preventers
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTLocation
Floor #ManufacturerModelSerial #SizeTypeSystem installed in

Burdick, Laurence E CIV NAVFAC MIDLANT, PWD Maine: Water systems include but limited to;

Fire Suppression, Heat Makeup, Building Feed

systems to include in this report are:Model NumberSerial NumberSize (1",3" etc)Type of Back Flow (BLDG FEED, Heat Make up etcFrequency
Reduced Pressure Zone2At existing risers at Berth 6 stations 1+05 and 8+65XBackflow Prevention Devices
Reduced Pressure Zone9Above-grade utility duct along Berth 6X
Diesel Generator
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTManufacturerModelSerial #KWHPsystems to include in this report are:Serial NumberKWHPFuel Type
Diesel generators
Water Cooler Filters
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTFloorWater CoolerFiltersystems to include in this report are:FloorOutlet LocationOutlet #Outlet Type (floor/wall mount)ManufacturerModel #Serial NumberFilter Model Number
MfgrModel #Model #Water Sentry Y/NWater CoolersFloorOutlet LocationOutlet #Outlet Type (floor/wall mount)ManufacturerModel #Serial NumberFilter Model Number
Gutters & Downspouts
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTGuttersDownSpoutsRoof Drainssystems to include in this report are:LF above 30'LF below 30'# of DropsDownspout Size 4" etcLF above 30'LF below 30'#of Roof Drains
SizeMaterialHeightLengthMaterial# of DropsSizeHeightQuantityLow Sloped RoofsLF above 30'LF below 30'# of DropsDownspout Size 4" etcLF above 30'LF below 30'#of Roof Drains
Overhead Doors
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTDoor #WidthHeightManufacturerType

Burdick, Laurence E CIV NAVFAC MIDLANT, PWD Maine: Type:

U-M Upper Acting Sectional Wood U-M Upper Acting Sectional Metal RMC Rolling Metal Curtain VLM-W Vertical Lift, Single/Multi-Sectional Wood VLM-M Vertical Lift, Single/Multi-Sectional Metal S-M Sliding Metal F Fabric

Fire Door Y / NElectric / ManualInterior / ExteriorVoltagesystems to include in this report are:HeightManufacturerType (U-M RMP)Condition
Overhead Doors
Motion Activated Glass Doors
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTModel NumberSerial NumberDimension Height Widthsystems to include in this report are:HeightManufacturerType (U-M RMP)Condition
Motion Activated Doors
Low Sloped Roof
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTRoofing MaterialYear InstalledEave HeightSquare FootageRoof Drawing Included?systems to include in this report are:Model NumberSQ/FT
Low Sloped Roofs
Elevator
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTSpeed (FPM)# of StopsCapacity (Pounds)ManufacturerInstallerDate InstalledVTE Type

Burdick, Laurence E CIV NAVFAC MIDLANT, PWD Maine: VTE Types:

PE/E - Electric Passenger Elevator PE/H - Hydraulic Passenger Elevator WL/E - Electric Wheelchair Lift FE/E - Electric Freight Elevator FE/H - Hydraulic Freight Elevator D/E - Electric Dumbwaiter

Rope Gripper Y/NSiesmic InstalledSmoke Detectors Y/NShunt Trip Y/NFire Extinquisher Y/NMachineroom Sprinklers Y/Nsystems to include in this report are:ManufacturerMFG DateType (FE/H)
VTEs
Lightning Protection
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityProvide drawings showing Lightning Protection Equipment and locationssystems to include in this report are:ManufacturerModel NumberSerial Number
Lightning Protected buildings
Emergency Lighting
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityFloor Plan Providedsystems to include in this report are:ManufacturerModel NumberSerial Number
Emergency drivers2Vault of Load Center 22XEmergency Lights
Exit Lights
Electrical Equipment, Building Entrance
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEquipmentsystems to include in this report are:ManufacturerSerial NumberRating
Fusible SwitchEnclosed Circuit BreakerPower Air Circuit BreakerTransformerFusible PanelboardMotor Control centerCircuit Breaker PanelboardSwithboardElectrical EquipmentManufacturerSerial NumberRating
Panelboard2Panelboards P-6A/B adjacent to Load Center 10 & P-6C at Load Center 22.X
Electrical Equipment, Distribution
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEquipmentsystems to include in this report are:ManufacturerSerial NumberRating
TransformersMV Disconnect SwitchMV BreakersLV Breakers (SI)LV Breakers (PI)Battery StstemsProtective RelaysMG SetsRegulatorsLoad tap ChangersMV MG Control StartersElectrical EquipmentManufacturerSerial NumberRating
Transformer2Load Center 22X
MV Disconnect switch2Load Center 22X
LV Breakers25Load Center 22X
Regulator2Substation yard adjacent to Load Center 10X
Storm Water Management Soil Filters, Ponds, etc.
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTProvide Drawings Showing Desgn and Location of OWSsystems to include in this report are:
Storm Water Management Systems Equipment
Oil and Water Separators
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTProvide Drawings Showing Desgn and Location of OWSsystems to include in this report are:Model NumberSerial Number
Oil Water Separators
Motorized Gate / Turnstile
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTModel NumberSerial Numbersystems to include in this report are:Model NumberSerial NumberDimension (Hieght, Width)Total Liner Feet of Fencing
Other ST Recurring Services
EQUIPMENTquantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesEQUIPMENTquantityInclude in this report are Systems and Equipment not listed above including but not limited to;Model NumberSerial NumberDimension (Hieght, Width)Total Liner Feet of Fencing
UPS SystemsAutomatic Transfer Switch
Consult with FSC, FMD, and CI before filling outSewage Lift StationsCatch Basins
the Other ST Recurring Services section
Other FX Recurring Services
ServicequantityINFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesServices to Include but not limited toPlacement Location
Grounds MaintenanceRefuse Removal
Consult with FSC, FMD, and CI before filling outPest ControlSnow Removal
the Other FX Recurring Services section

Blank ISRL (2)

NAVFAC Internal Services Requirements List
Project Name (include BLDG#): e-Project#
**** this form needs to be filled out at the end of each phase of the contract and turned into the government no less than 90 days prior to occupancy***
CURRENT INVENTORY - FILLED OUT BY GOVERNMENTFILLED OUT BY CONTRACTORINFORMATION ONLYNEW INVENTORY - CONTRACTOR
Janitorial Cleaning Services Required - ** ATTACH FLOOR PLAN CADD FILE **A
Room Use (Administration / Bathroom / Kitchenette / Locker Room, etc) and Room NumberRoom #INFORMATION / LOCATIONremovedreplacednew to buildingnot part of scopenotesRoom Use (Administration / Bathroom / Kitchenette / Locker Room, etc)Room NumberFlooring Type (VCT, Resilient, Carpet, Ceramic, Concrete, Wood, other)Square Footage (Include Shower Floors)Planned Number of OccupantsShower Square Footageequipment to include in this report are:Square Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
FloorsWallsPaper Towel DispensersSoap DispensersSquare Footage of RoomFlooring Type (VCT, Tile, Carpet)Wall Type (Tile or Sheetrock) %Use (Admin/ Bathroom / Kitchenette, etc)# of anticipated occupantsManufacturerModel NumberSerial Number*Attach CAD file of building
Toilet Paper DispensersRecessed Trash Cans
FlooringFixtures
ACCESSORIESRoom NumberQuanities(Dispensers MUST be compatible with existing Paper and Soap Products. Consult with FSC)
ToiletsUrinalsSinksMirrorsWater FountainsLockersPaper Towel DispensersToilet Paper DispensersSoap DispensersSoap (Grit) Dispensers