This amendment modifies Solicitation N4008522R2578 to restore outfitting capacity at Berth 6C of the Portsmouth Naval Shipyard in Kittery, Maine. The amendment incorporates updated final design drawings and makes revisions to specifications, project sequencing, commissioning requirements, concrete and precast structural elements, mooring hardware, coating of steel structures, piping systems, rock anchors, electrical distribution, telecommunications, fenders, and other aspects. Key changes include revising milestone dates, replacing commissioning authority requirements, adding steel fairlead ring and conduit coating specifications, renaming rock anchor logging, modifying rock anchor testing procedures, and revising fender material and installation specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Restore Outfitting Capacity, Berth 6C, newest first.
File Type Posted
N4008522R2578 AMENDMENT 0006.pdf PDF
N4008522R2578 AMENDMENT 0005.pdf PDF
REV2_Berth 6 Bid Schedule.pdf PDF
AMENDMENT 0005_Revised Sheet G-106 - Phase 3.pdf PDF
N4008522R2578 AMENDMENT 0004.pdf PDF
Amendment 0003_Sheet ES507.pdf PDF
N4008522R2578 AMENDMENT 0003.pdf PDF
Revised Berth 6_Final Bid Schedule.pdf PDF
N4008522R2578 AMENDMENT 0002.pdf PDF
1982 - Track Replacement Berth 6.pdf PDF
Appendix D Berth 6 eOMSI Workbook.xlsx XLSX spreadsheet
UFGS4288 Submittal Register.xlsx XLSX spreadsheet
Attachment G - PIEE Vendor Access Instructions.pdf PDF
2019-Sea Level Rise Mitigation Wall B5 AND B6A_Rev10.4.19.pdf PDF
Appendix E Berth 6 NAVFAC ISRL.XLSX XLSX spreadsheet
N4008522R2578.pdf PDF
1975 - Eval. of Exisiting Crane Foundations Berth 6.pdf PDF
Appendix B Berth 6 Geotechnical Report.pdf PDF
Appendix A Berth 6 HAZMAT Survey.pdf PDF
ATTACHMENT E SPCD.docx DOCX document
1977-Additional Crane Rail System Construction Drydock No. 1 Berths 6 7.pdf PDF
2002 - 1728A Berth 6 Bollards - Drawings.pdf PDF
2000 - 1337C Berth 5 and 6 Repairs Drawings.pdf PDF
2014-Structural Repairs to Berths 6A 6B and 6C.pdf PDF
1974 - Berth 6 Repairs.pdf PDF
1943 - Berth 6 Crane Track Foundations.pdf PDF
B6_Updated Final Design Drawings_Signed.pdf PDF
Berth 6_Final Bid Schedule.pdf PDF
ATTACHMENT C Construction and Design Exp Project Data Sheet.pdf PDF
ATTACHMENT B Past Performance Questionnaire.pdf PDF
Attachment A - PPI Inquiry Log.xls XLS spreadsheet
ATTACHMENT F SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
ATTACHMENT D HISTORICAL SMALL BUSINESS UTILIZATION.docx DOCX document
1659622spc01of01.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008522R2578 Restore Outf itting Capacity, Berth 6C, Portsmouth Naval Shipyard, Kittery, Maine

This amendment is issued to incorporate updated final design draw ings.

See continuation page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522R2578

X 9B. DATED (SEE ITEM 11)

12-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jan-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522R2578

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

This Amendment is issued prior to receipt of the bids and does hereby become a part of the Contract Documents, and in case of conflict, it supersedes original project manual and drawings.

Each bidder must be responsible for issuing information contained herein to sub-contractors and suppliers to ensure that their proposal covers all work required by the Contract Documents including this Amendment.

The work of the Amendment must comply with all contract requirements including Division 00 and 01 specification sections and the following specific items noted.

AMENDMENT ATTACHMENTS:

1. Updated Final Design Drawings

BASIS OF BID 00 41 00

1. Replace “Station 3+40, 4+84 and 6+67” in fourth paragraph (CLIN 000103) of section 1.2.3.1 Explanation of Berth 6 Repairs and Improvements Bid Items with the following:

Station 3+35, 4+43 and 6+82.

SPECIFICATIONS

Section 01 11 00 – SUMMARY OF WORK

1. Replace paragraph 1.2.2 Project Milestone Requirements with the following:

Complete milestones to the limits shown on the Contract Drawings. Milestone work elements include installation, testing, and acceptance by the Government of each component of the work.

a. Milestone 1 Berth 6A/B – 12/02/2022

b. Milestone 2 Berth 6B/C – 3/31/2023

2. Replace paragraph 1.3.a. and 1.3.b. PROJECT SEQUENCING REQUIREMENTS with the following:

a. Phase 1 – Berth 6A/B/C

b. Phase 2 – Berth 6B/C

Section 01 91 13 – GENERAL COMMISSIONING REQUIREMENTS (PWD ME)

1. Revise paragraph 1.6.1 Commissioning Authority (CxA) to “The CxA must be a first tier subcontractor with no affiliation to the Contractor or his/her subcontractors.”

Section 03 30 00 – CAST-IN-PLACE CONCRETE

1. Replace paragraph 3.4.a. with the following:

a. Provide waterstops in construction joints on the above-grade utility duct, manholes, and vaults and as indicated on the contract drawings.

Section 03 45 33 – PRECAST STRUCTURAL CONCRETE

1. Add the following to sentence two of paragraph 2.3.1 Access Hatches after “located in the precast concrete cover,”:

and above-grade utility duct utility vault walls,

2. Add the following to the end of paragraph 2.3.1 Access Hatches after “utility duct covers”:

, and utility vault walls.

3. Add the following to paragraph 2.6.4.1 Inserts

Galvanize in accordance with ASTM F2329/F2329M, ASTM F1136/F1136M, ASTM F2833 or ASTM B695.

Section 05 30 00.01 – MOORING HARDWARE

1. Replace paragraph PART 1 GENERAL

Work under this section covers supply, testing and installation of the mooring bollards, cleats, and fairlead ring as shown on the Contract Drawings and specified herein. Installation includes bolting of mooring hardware, grouting of base, filling hardware with grout and filling of bolt holes.

2. Add paragraph 2.1.3 Fairlead Ring

Provide steel fairlead ring as shown on the Contract Drawings. Fairlead ring material must be ASTM A148, Grade 80-50 or forged AISI 4140.

3. Delete last sentence of paragraph 2.5 FINISH, and Replace with

Intermediate coat and top coat must be applied in the shop to a minimum thickness of 3.0 mils each, with touch-ups to the coating applied in the field, if necessary, in accordance with manufacturer’s recommendations.

Section 09 97 13.26 – COATING OF EXISTING STEEL WATERFRONT STRUCTURES

1. Add the following to paragraph PART 1 GENERAL after “Work under this section includes the field coating of existing steel elements”:

above Mean Lower Low Water (MLLW) elevation.

Section 22 15 43 – NITROGEN PIPING IN PREFABRICATED CONDUIT SYSTEM

1. Add the following to the end of paragraph 2.2.1.1:

The steel conduit casing must be 10 gauge smooth wall, spiral welded steel. The fiber-reinforced plastic (FRP) cladding must be filament wound directly on to the carbon steel casing. All field joints on the outer conduit must be welded, air-tested and covered with a heat shrink sleeve or covered with a hand lay-up of fiberglass cloth and polyester resin. All of the conduit will be subjected to a holiday test utilizing a 10,000 volt electrical resistance holiday detector.

Section 31 68 13 – ROCK ANCHORS

1. Add the following submittal to paragraph 1.4 SUBMITTALS under SD-07 Certificates:

Professional Engineer Qualifications

Geotechnical Engineer

Geologist

2. Rename paragraph 1.5.3 from “Core Logging and Soil Sampling” to “Rock Anchor Logging” Replace with the following:

Logging of rock anchors and preparation of drilling logs and records must be performed by a Geologist or Geotechnical Engineer who has at least five years of experience in logging rock anchor installations. Rock anchor logs must contain the information listed in Section 3.4.3.

3. Remove the following from the first sentence of paragraph 2.4.6 Sand-Cement Grout:

“, grouting holes which fail the watertightness test, “

4. Replace paragraph 3.4 FIELD QUALITY CONTROL with the following:

The designated demonstration test anchors must be used to verify rock quality and the adequacy of the anchor installation procedures. Demonstration test anchors must pass the performance test prior to placing other anchors of the same type represented by the respective demonstration test anchor. There are three types of anchored foundations: Type 1 with rock anchors installed at 60 degrees; Type 2 with rock anchors installed at 45 degrees; and Type 3 with concrete anchors installed at 45 degrees. Each type of anchored foundation will get performance tested for a total of three performance tests. The performance tests must be performed on the 50-ton bollard foundations. All other anchors must be proof tested. During the stressing of each anchor, a record must be kept of gage pressure and of anchor elongation at each stage of stressing to the specified test or Lock-off Load, as applicable. The Test Load must not be exceeded. Provide a qualified Professional Engineer to evaluate the anchor test results and determine the acceptability of the anchors in accordance with the criteria indicated herein. Provide the Professional Engineer Qualifications who will be performing the rock anchor test evaluations. Final acceptance of each anchor will be made by the Contracting Officer. All tests must be run in the presence of the Contracting Officer or their representative.

5. Replace paragraph 3.4.1 Performance Test

Performance test must consist of cyclically and incrementally loading and unloading the anchor and must be conducted in accordance with PTI DC35.1, Paragraph 8.3.2. Each performance test will include the testing of the two anchors of each foundation type. Performance tests must be successfully performed on two installed anchors before installing any additional anchors. Two additional anchors will be selected by the Contracting Officer for performance testing. A total of three performance tests must be performed with three additional performance tests to be identified by the Contracting Officer for a total of six performance tests;

therefore a total of eight rock anchors and four concrete anchors will be tested for the 50-ton bollard foundations. During the testing of each anchor, a record must be kept of gage pressure and of anchor elongation at each stage of stressing to each Test Load required by PTI DC35.1. Measurements of the elongation of prestressing steel must be made in accordance with PTI DC35.1. If the total movement at the end of 10 minutes at the Test Load exceeds 0.040 inch, the Test Load must be held an additional 50 minutes and the movement readings must be taken at the interval specified in PTI DC35.1, Paragraph 8.3.2. Test records, including plots and graphical analysis of test data, must be furnished upon acceptance of each performance tested anchor in accordance with paragraph SUBMITTALS.

Anchor Foundation

Type

Anchor Foundation Description

No. of Performance

Tests

No. of Additional Performance Tests as indicated by CO

Total No. of Rock Anchors Performance Tested (2 rock anchors per foundation)

Rock anchors installed at 60 degrees, 50-ton bollard

1 1 4

Rock anchors installed at 45 degrees, 50-ton bollard

1 1 4

Concrete anchors installed at 45 degrees, 50-ton bollard

1 1 4

6. Remove the following items from paragraph 3.4.3 Driller logs:

h. Depths and elevations at which core was recovered or attempts made to core including top and bottom depth of each run.

i. Geologic classification or description by depths of each stratigraphic unit cored. This classification or description must be made immediately following the taking of the core.

j. Percentage of core recovered and rock quality designation per run.

l. Depth and elevation at which groundwater is encountered.

Section 33 71 02 – UNDERGROUND ELECTRICAL DISTRIBUTION

1. Add paragraph 3.14.8 Pad Grounding:

Provide a loop of 4/0 AWG copper grounding conductor around the perimeter of each concrete equipment pad, not less than 24 inches below grade. Provide a ground rod or plate at each corner of the concrete pad.

Provide driven ground rods until the top is 12 inches below grade. Attach 4/0 AWG copper grounding conductor, by exothermic weld, to the ground rods or plates. Provide 1/0 AWG ground wire pigtails from ground ring to concrete pad reinforcing, attached by exothermic weld process. Provide 1/0 AWG ground wire pigtails from ground ring to equipment.

Section 33 82 00 – TELECOMMUNICATIONS OUTSIDE PLANT

1. Add the following to paragraph 1.5, at the end of the first sentence, “and at Building 79.”

Section 35 59 13.16 – MARINE FENDERS

1. Remove the following from paragraph PART 1 GENERAL:

“UHMW”

2. Add the following references to paragraph 1.1 REFERENCES

ASTM D2394 Standard Test Methods for Simulated Service Testing of Wood and Wood-Based Finish Flooring ASTM D6108 Standard Test Method for Compressive Properties of Plastic Lumber and Shapes ASTM D6109 Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastic Lumber and Related Products

3. Change “UHMW Rub Strip Fenders” in paragraph 1.2 SUBMITTALS to “Rub Strip Fenders”

4. Add the following submittal to paragraph 1.2 SUBMITTALS SD-03 Product Data:

Steel Angle Brackets

5. Remove the following from paragraph 1.3 DELIVERY, HANDLING AND STORAGE

“UHMW”

6. Change paragraph 2.1 title from “UHMW RUB STRIP FENDERS” to “RUB STRIP FENDERS”

7. Change paragraph 2.1.1 title from “UHMW Rub Strip Fenders” to “Rub Strip Fenders”

8. Replace paragraph 2.1.1 Rub Strip Fenders

Rub strips must be heavy duty and intended for commercial marine use. The panels must be of the size and dimensions shown on the Contract Drawings. They must be ultraviolet stabilized with a minimum ½ inch wear thickness. The facing connections must be configured to account for the thermal properties of the polyethylene. Provide shop drawings identifying all dimensions, cuts, bore holes, and embedded steel mounting plate, hardware, and mounting details.

Rub Strips must be UHMW (ultra high molecular weight polyethylene) with a 0.20 maximum coefficient of friction per ASTM D1894. The UHMW must exhibit no failure when tested per ASTM D256, Method B. The panels must be in accordance with ASTM D4020.

High-density polyethylene (HDPE) may be used for rub strips if UHMW is not available. If HDPE rub strips are used, they must have a 0.39 dry static coefficient of friction per ASTM D2394 and must exhibit no failure when tested per ASTM D6109 and ASTM D6108.

9. Add the following paragraph 2.1.3 Steel Fender Brackets

Provide steel angle brackets for Berth 6A seawall fenders as shown on the Contract Drawings. Steel angle brackets must be ASTM A36/A36M and must be coated in accordance with section 09 97 13.26 Coating of Existing Steel Waterfront Structures.

10. Change the title of paragraph 3.1 from “UHMW RUB STRIP FENDER INSTALLATION” to “RUB

STRIP FENDER INSTALLATION”

11. Remove “UHMW” from paragraph 3.1

--End--