USACE / NAVFAC / AFCEC / NASA UFGS- 01 11 00 ( August 2015)
Change 2 - 08/ 21
Pr epar i ng Act i v i t y: NAVFAC Superseding UFGS- 01 11 00 ( August 2011)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2021
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 CONTRACT DRAWINGS
1.4 WORK RESCHEDULING
1.5 OCCUPANCY OF PREMISES
1.6 EXISTING WORK
1.7 ON-SITE PERMITS
1.7.1 Utility Outage Requests and Utility Connection Requests
1.7.2 Borrow, Excavation, Welding, and Burning Permits
1.8 LOCATION OF UNDERGROUND UTILITIES
1.8.1 Notification Prior to Excavation
1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
1.9.1 Delivery Schedule
1.9.2 Delivery Location
1.10 GOVERNMENT-INSTALLED WORK
1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.11.1 NMCI Contractor Access
1.12 SALVAGE MATERIAL AND EQUIPMENT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
USACE / NAVFAC / AFCEC / NASA UFGS- 01 11 00 ( August 2015)
Change 2 - 08/ 21
Pr epar i ng Act i v i t y: NAVFAC Superseding UFGS- 01 11 00 ( August 2011)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2021
SECTION 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or a descr i pt i on of wor k cover ed i n t hi s cont r act and i s r equi r ed f or use i n al l pr oj ect s.
Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.
Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.
Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .
NOTE: For Navy pr oj ect s onl y, i ncl ude on t he drawing:
1. Locat i on of pr oj ect .
2. Li mi t s of cont r act or ' s wor k ar ea.
3. Locat i on of Gover nment - f ur ni shed wor k.
4. Locat i on of Gover nment i nst al l ed wor k.
5. Cont r act or ' s on- base r out e t o s i t e.
NOTE: Thi s sect i on cont ai ns t ai l or i ng opt i ons f or
SECTION 01 11 00 Page 2
NAVY and NASA.
PART 1 GENERAL
1.1 SUBMITTALS
NOTE: Revi ew Submi t t al Descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t , and cor r espondi ng submi t t al i t ems i n t he t ext , t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect . The Gui de Speci f i cat i on t echni cal edi t or s have cl assi f i ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a " G" t o an i t em i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .
For Ar my pr oj ect s, f i l l i n t he empt y br acket s f ol l owi ng t he " G" c l assi f i cat i on, wi t h a code of up t o t hr ee char act er s t o i ndi cat e t he appr ovi ng aut hor i t y. Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.
The " S" c l assi f i cat i on i ndi cat es submi t t al s r equi r ed as pr oof of compl i ance f or sust ai nabi l i t y Gui di ng Pr i nci pl es Val i dat i on or Thi r d Par t y Cer t i f i cat i on and as descr i bed i n Sect i on 01 33 00 SUBMI TTAL
PROCEDURES.
Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce, and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.
NOTE: For pr oj ect s i n t he NAVFAC PAC Ar ea of Oper at i on, i n SD- 01 Pr econst r uct i on Submi t t al s, r emove t he " G" desi gnat i on f or Sal vage Pl an.
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are [for Contractor Quality Control approval.][for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 01 11 00 Page 3
NOTE: The f ol l owi ng 6 submi t t al s ar e f or NASA pr oj ect s onl y, and ar e t ai l or ed f or NASA.
Utility Outage Requests
Utility Connection Requests
Borrow Permits
Excavation Permits
Welding Permits
Burning Permits
Salvage Plan ; G[, [_____]]
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
NOTE: Descr i be t he pr oj ect ( such as f aci l i t y t o be const r uct ed and squar e f oot age, bui l di ng shel l const r uct i on, f oundat i on) and t he t ypes of wor k i nvol ved i n suf f i c i ent det ai l so as t o pr esent a gener al pi ct ur e whi ch i s sel f cont ai ned but does not r ef er t o t he dr awi ngs or t o ot her par t s of t he speci f i cat i on. Ment i on pecul i ar or hazar dous wor k, and moni t or i ng of ar chaeol ogi cal r esour ces.
The work includes [_____] and incidental related work.
1.2.2 Location
NOTE: Pr ovi de t he st at i on name and geogr aphi c l ocat i on i n t he bl ank pr ovi ded.
The work is located at the [_____], approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 CONTRACT DRAWINGS
NOTE: Use t hi s par agr aph f or NASA onl y. Do not use f or Ar my or Navy pr oj ect s. Thi s par agr aph i s t ai l or ed f or NASA.
The following drawings accompany this specification and are a part thereof.
Drawing No. [_____] Sheets 1 through [_____]
SECTION 01 11 00 Page 4
[Five] [_____] sets of full size contract drawings, maps, and specifications will be furnished to the Contractor without charge.
Reference publications will not be furnished. Immediately check furnished drawings and notify the Government of any discrepancies.
1.4 WORK RESCHEDULING
NOTE: Use t hi s par agr aph f or NASA pr oj ect s onl y.
Do not use f or Navy or Ar my pr oj ect s. Thi s par agr aph i s t ai l or ed f or NASA. Requi r ement s f or Ar my and Navy ar e i n Sect i on 01 14 00 WORK
RESTRICTIONS.
Allow for a maximum of [_____] calendar days in the construction schedule where construction activity is prohibited due to NASA operations. Where other construction activities are permitted impose a further allowance for [_____] calendar days in the schedule, of excavation and subsurface activity abeyance. Government will provide 24 hour notification each time the restrictions are invoked.
Normal duty hours for work are from [_____] a.m. to [_____] p.m., Monday through Friday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.
1.5 OCCUPANCY OF PREMISES
NOTE: Use t hi s par agr aph i f bui l di ng i s occupi ed dur i ng const r uct i on.
Building(s) will be occupied during performance of work under this Contract.[ Occupancy notifications will be posted in a prominent location in the work area.]
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
[ 1.6 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
] 1.7 ON-SITE PERMITS
NOTE: Use t hi s par agr aph and subpar agr aphs f or NASA pr oj ect s onl y. These par agr aphs ar e t ai l or ed f or
SECTION 01 11 00 Page 5
NASA use. Requi r ement s f or Ar my and Navy ar e i n Section 01 14 00 WORK RESTRI CTI ONS.
1.7.1 Utility Outage Requests and Utility Connection Requests
Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions tothe Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.
Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least [_____] calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.7.2 Borrow, Excavation, Welding, and Burning Permits
NOTE: Edi t par agr aph t i t l e and per mi t s r equi r ed.
Coor di nat e use of bur ni ng per mi t s wi t h UFGS 01 57 19
TEMPORARY ENVI RONMENTAL CONTROLS.
ACTIVITY SUBMISSION DATE SUBMISSION FORM
[ Borrow Permits ] [[_____] calendar days prior to work]
[ Burning Permits ] [[_____] calendar days prior to work]
[ Excavation Permits ] [[_____] calendar days prior to work]
[ Welding Permits ] [[_____] calendar days prior to work]
Post permits at a conspicuous location in the construction area.
Burning of trash or rubbish is [not] permitted at [_____] [on project site].[ Comply with requirements for burning of trash or rubbish, as established by the Authority having Jurisdiction .]
1.8 LOCATION OF UNDERGROUND UTILITIES
NOTE: Check wi t h I nst al l at i on on i f t he Cont r act or or t he Base mar ks t he ut i l i t i es. Use and edi t t he br acket ed i t em i n f i r st par agr aph i f Cont r act or i s r esponsi bl e f or l ocat i on and mar ki ng of ut i l i t i es.
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.[ Contact local utility locating service a minimum of [48 hours][_____] prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday.] Verify existing utility locations indicated on contract drawings, within
SECTION 01 11 00 Page 6 area of work.
[ Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground[, pier deck] or paved surface where existing underground utilities [or utilities encased in pier structures ]are discovered.
Verify the elevations of existing piping, utilities,and any type of underground [or encased ]obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
] 1.8.1 Notification Prior to Excavation
NOTE: Check wi t h t he I nst al l at i on t o choose t he br acket ed i t em f or number of days not i f i cat i on required.
Notify the Contracting Officer at least [48 hours][15 days][_____] prior to starting excavation work.
[ 1.9 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
NOTE: I ncl ude t hi s par agr aph onl y when t he Cont r act or wi l l be r equi r ed t o i nst al l Gover nment - Fur ni shed Mat er i al s and Equi pment or pr ovi de ut i l i t i es f or same. Obt ai n i nf or mat i on t o i dent i f y t he i t ems f r om t he Gover nment .
NOTE: Ther e ar e s i t uat i ons i n whi ch equi pment i nst al l at i on dat a or t empl at es woul d al l ow t he Cont r act or t o pr epar e r ough- i n and pr oceed wi t h const r uct i on pr i or t o t aki ng del i ver y of Gover nment - f ur ni shed equi pment . Thi s par agr aph may be expanded t o i ncl ude schedul i ng del i ver y of i nst al l at i on dat a or t empl at es as wel l as t he equi pment i t sel f , i f t he dat a can be made avai l abl e mor e qui ckl y t han t he Gover nment - f ur ni shed equi pment and i f advanced del i ver y woul d be hel pf ul t o t he Gover nment . Obt ai n l i s t i ng of mat er i al f r om t he act i v i t y pr ovi di ng i t .
Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials and equipment for installation by the Contractor:
NOTE: Pr ovi de compl et e descr i pt i on and quant i t i es f or Gover nment - f ur ni shed and Cont r act or - i nst al l ed mat er i al and equi pment . I dent i f y manuf act ur er , SECTION 01 11 00 Page 7 make, model and oper at i ng char act er i st i cs. Avoi d gener i c descr i pt i ons especi al l y f or equi pment r equi r i ng ut i l i t i es such as wat er ser vi ce, dr ai ns, nat ur al gas, st eam, or el ect r i c i t y. Thi s i nf or mat i on shoul d be made avai l abl e by t he act i v i t y f ur ni shi ng t he mat er i al or equi pment t o be i nst al l ed t hr ough t he Gover nment . When a ut i l i t y i s r equi r ed t o ser ve t he Gover nment - f ur ni shed i t em, ensur e t hat t he appr opr i at e Sect i on f or t he ut i l i t y needed i s i ncl uded i n t he pr oj ect speci f i cat i on.
NOTE: Do not l i s t sal vage pr oper t y t o be r emoved and r eused i n t he gener al wor k ar ea; i ndi cat e such mat er i al on t he dr awi ngs. .
DESIGNATION NO. DESCRIPTION QUANTITY
NOTE: Use t hi s par agr aph as appl i cabl e f or quantities.
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.
1.9.1 Delivery Schedule
NOTE: Choose t he ver si on of t hi s par agr aph whi ch best sat i sf i es t he pr oj ect condi t i ons. The f i r st al t er nat i ve i s best sui t ed f or pr oj ect s r equi r i ng car ef ul schedul i ng of Gover nment - f ur ni shed equi pment . Est abl i sh t he number of cal endar days r equi r ed f or not i f i cat i on or t hat have el apsed bef or e avai l abi l i t y af t er consi der i ng ( 1) a r easonabl e t i me bet ween t he Cont r act Awar d and t he f i r st need f or Gover nment - f ur ni shed equi pment and ( 2) t he l ead t i me r equi r ed f or Gover nment pr ocur ement . Set t he st or age r at e at t he commer ci al r at e i n t he ar ea of st or age.
[ Notify the Contracting Officer in writing at least [_____] calendar days in advance of the date on which the materials and equipment are required.
Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the rate of [_____] per [45
SECTION 01 11 00 Page 8 kg][3 cubic meters] 100 [pounds][cubic feet] per month or fraction thereof.
][ Materials and equipment will be available on or after [_____] calendar days after the award of contract.
] 1.9.2 Delivery Location
The materials and equipment [are located at [_____]] [are located within [_____] miles of the jobsite] [will be delivered to [_____]][the salvage receiving point [_____]].
][ 1.10 GOVERNMENT-INSTALLED WORK
NOTE: I ncl ude t hi s par agr aph i f t he Gover nment i s t o i nst al l equi pment or per f or m ot her wor k at t he j ob s i t e, excl udi ng i nspect i on and t est i ng. Def i ne t he ext ent and t ype of Gover nment wor k t hat may i mpact t he oper at i ons of t he Cont r act or .
] [ 1.11 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
NOTE: Use t hi s par agr aph f or Navy pr oj ect s onl y.
I n addi t i on t o t he EI A/ TI A st andar ds f or t el ecommuni cat i ons, t he ar chi t ect ur al , st r uct ur al , mechani cal , pl umbi ng, el ect r i cal and f i r e pr ot ect i on desi gns must compl y wi t h t he r equi r ement s i n t he l at est ver si on of UFC 3- 580- 10.
1.11.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
] 1.12 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the [Government designated] storage area located within [_____] kilometers miles of the construction site.
Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
SECTION 01 11 00 Page 9
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --