Seed TO Bldg-265 WT 12390692 Epoxy West Section.pdf

PDF 220 KB Posted

Attached to
Hill Air Force Base Epoxy Flooring and Maintenance IDIQ Federal contract opportunity
Solicitation number
FA8201-23-R-0010
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Hill Air Force Base Epoxy Flooring and Maintenance IDIQ, newest first.
File Type Posted
Epoxy IDIQ Solicitation QA.pdf PDF
Schedule B 5.5 yrs.xlsx XLSX spreadsheet
Epoxy IDIQ Section L 1 May 23 Updated.docx DOCX document
Screenshot Seed Task Area.jpg JPG image
Seed Task Order Striping Plan.pdf PDF
Revised Basic IDIQ SOW 1_May_23.pdf PDF
Screenshot Meeting Location.jpg JPG image
Schedule B 5.5 yrs.xlsx XLSX spreadsheet
Seed Task Order Pricing Sheet - Bldg 265 West Bay.xlsx XLSX spreadsheet
afi31-118.pdf PDF
BASE FACILITY DESIGN STANDARD.Jan 23 2023.docx DOCX document
UFGS 01 57 19 Temporary Environmental Controls.pdf PDF
UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System.pdf PDF
UFGS 01 11 00 Summary of Work.pdf PDF
UFGS 02 42 51 Carpet Removal and Reclamation.pdf PDF
UFGS 32-13-13.06 PCC.docx DOCX document
Solicitation - FA820123R0010.pdf PDF
Epoxy IDIQ Section L 1 May 23.docx DOCX document
Seed TO Bldg 265 West Bay SOW 22 March 2023.pdf PDF
UFGS 01 45 00.00 20 Quality Control.pdf PDF
UFGS 01 20 00 Price and Payment Procedures.pdf PDF
01 57 20 Environmental Protection.docx DOCX document
UFGS 09 67 23.14 Chemical Resistant Resinous Flooring.pdf PDF
UFGS 02 41 00 Demolition and Deconstruction.pdf PDF
UFGS 32 01 19.61 Resealing of Joints in Rigid Pavement.docx DOCX document
Epoxy IDIQ SOW 1_May_23.pdf PDF
RFP for Epoxy Seed Task Order Bldg 265 West Bay.pdf PDF
UFGS 09 90 00 Paints and Coatings.pdf PDF
ufc_1_300_02.pdf PDF
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls.pdf PDF
UFGS 01 35 26 Government Safety Requirements.pdf PDF
UFGS 32 13 13.06 Concrete for Site Facilities.pdf PDF
UFGS 01 32 01.00 10 Project Schedule.pdf PDF
UFGS 09 06 00 Schedules for Finishes.pdf PDF
01 35 26 Government Safety Requirements.docx DOCX document
UFGS 09 67 23.13 Standard Resinous Flooring.pdf PDF
01 32 00 Project Schedule.docx DOCX document
UFGS 01 62 35 Recycled - Recovered Materials.docx DOCX document
01 00 00 General Requirements.docx DOCX document
WD - Weber.pdf PDF
UFGS 09 96 00 High-Performance Coatings.docx DOCX document
Epoxy IDIQ Section M 1 May 2023.docx DOCX document
UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System.pdf PDF
UFGS 32 01 19.61 Rigid Pavement Joint Seal.pdf PDF
UFGS 09 96 59 High-Build Glaze Coatings.pdf PDF
UFGS 09 06 90 Color Schedule (need colors).docx DOCX document
WD - Davis.pdf PDF
WD - Box Elder.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK TASK/CAPITAL PROJECT #:

FACILITY:

REQUESTER:

15 August 2022

(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)

LEAD BASED PAINT

NON-ASBESTOS

LIMITED INSPECTION REPORT

Utah Certified State Inspector: Kyle Daly (ASB#-7321: Expires-9 Sept. 2023, PB#-2753: Expires-17 March 2024)

INSPECTION DATE: 06 October 2022

Reference UDAQ R307-807-6

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

SIGNATURE:

PREPARED BY: Kyle Daly (ASB#-7321, PB#-2753)

EPOXY WEST SECTION OF FLOOR

ORGANIZATION:

REQUESTED:

12390692

DEREK DRIGGS

THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD

NOT BE USED FOR BIDDING PURPOSES

309 CMXG

FACILITY CONSTRUCTION DATE:

No drywall, ceiling tile, or thermal systems insulation in this structure will be disturbed.

DEPARTMENT OF THE AIR FORCE

75 CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

NON-ASBESTOS LIMITED INSPECTION REPORT INFORMATION

After a discussion of the exact scope of work involved in this project, this was determined to be a removal/replacement project only, for the following reason:

Epoxy west section of floor. Statement of Work:

Asbestos/LBP Shop 75 CES(CEOHA)

POTENTIAL FOR ADDITIONAL MATERIALS:

This inspection report only encompasses the areas/materials as described in the provided scope of work.

Should the scope of the project be altered in any way or any materials found that are not identified within this report shall require additional assessment.

This report may not be used for any other projects within the building or for bidding purposes.

Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.

CONTACT INFORMATION

The existing building material involved with this project is a painted concrete floor.

Therefore, there are no regulated asbestos containing materials (RACM) or even a suspect asbestos containing material to be impacted by the scope of work given at the time of this inspection.

Supervisor: Taylor Brimberry: DSN: (801)586-7094 Asbestos/LBP Shop Personnel DSN:(801)777-8006Cell: (801)940-2970

5-This inspection report only encompasses the areas/materials designated within the scope of work provided at the date of inspection (see title page for inspection date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.

2-It is possible that lead based paint could be encountered during any renovation project. Additional identification for lead based paint on other building components may be required. The facility manager/Project Manager should ensure that these components are surveyed for lead as well, to meet OSHA Standard 29 CFR 1926.62 construction requirements for lead.

3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or by laboratory analysis of 0.5 percent by weight (5,000 µg/g dry weight) or more of lead. All other components tested were less than 1 mg/cm².

4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions please feel free to call Taylor Brimberry at 586-7094.

SCOPE OF WORK: Epoxy west section of floor.

1-Positive Lead based paint readings were not-detected. Please refer to the final page of section of this inspection for all readings.

XRF Analyzer XL3T 600 (Serial #120020)XRF Analyzer Used :

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

LIMITED NEGATIVE LEAD-BASED PAINT INSPECTION REPORT INFORMATION

66 1.10 97 0.91 67 1.06 98 1.07

68 0.93 POS 99 1.01

Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS South Fair Light Grey 0.01 NEG South Fair Grey 0.58 NEG South Good Yellow 0.05 NEG South Good White 0.01 NEG South Good Green 0.01 NEG West Good Red 0.01 NEG West Good Dark Grey 0.79 NEG North Good Yellow 0.08 NEG East Good Grey 0.01 NEG East Good Yellow 0.01 NEG East Good Grey 0.01 NEG East Good Off-White 0.01 NEG

79 South West Project Area Floor Concrete 80 South West Project Area Floor Concrete

75 West Project Area Floor Concrete 76 West Project Area Floor Line Concrete 77 West Project Area Floor Concrete 78 South West Project Area Floor Line Concrete

XL Number Room/Area Structure

71 West Project Area Floor Line

73 West Project Area Floor Line Concrete 74 West Project Area Floor Concrete

70 West Project Area Floor Concrete 69 West Project Area Floor Concrete

Pre Calibration PbL (mg/cm²) Calibration

Range Model# Serial #

Per 20 Second Reading

Calibration Range

Substrate

West Project Area Floor Line Concrete

Post Calibration

PbL (mg/cm²)XRF Analyzer XL3T 600 (Serial #120020)

Per 20 Second Reading

Concrete

Title Page
Non-ACM
NEG-LBP
Readings
2023-03-22T12:27:04-0600
DALY.JOHN.KYLE.1590487178

Range 8 to 12:

File details come from the government source that posted it. Updated .