Seed TO Bldg-265 WT 12390692 Epoxy West Section.pdf
PDF 220 KB Posted
- Attached to
- Hill Air Force Base Epoxy Flooring and Maintenance IDIQ Federal contract opportunity
- Solicitation number
- FA8201-23-R-0010
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK TASK/CAPITAL PROJECT #:
FACILITY:
REQUESTER:
15 August 2022
(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)
LEAD BASED PAINT
NON-ASBESTOS
LIMITED INSPECTION REPORT
Utah Certified State Inspector: Kyle Daly (ASB#-7321: Expires-9 Sept. 2023, PB#-2753: Expires-17 March 2024)
INSPECTION DATE: 06 October 2022
Reference UDAQ R307-807-6
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
SIGNATURE:
PREPARED BY: Kyle Daly (ASB#-7321, PB#-2753)
EPOXY WEST SECTION OF FLOOR
ORGANIZATION:
REQUESTED:
12390692
DEREK DRIGGS
THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD
NOT BE USED FOR BIDDING PURPOSES
309 CMXG
FACILITY CONSTRUCTION DATE:
No drywall, ceiling tile, or thermal systems insulation in this structure will be disturbed.
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
NON-ASBESTOS LIMITED INSPECTION REPORT INFORMATION
After a discussion of the exact scope of work involved in this project, this was determined to be a removal/replacement project only, for the following reason:
Epoxy west section of floor. Statement of Work:
Asbestos/LBP Shop 75 CES(CEOHA)
POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials as described in the provided scope of work.
Should the scope of the project be altered in any way or any materials found that are not identified within this report shall require additional assessment.
This report may not be used for any other projects within the building or for bidding purposes.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance.
CONTACT INFORMATION
The existing building material involved with this project is a painted concrete floor.
Therefore, there are no regulated asbestos containing materials (RACM) or even a suspect asbestos containing material to be impacted by the scope of work given at the time of this inspection.
Supervisor: Taylor Brimberry: DSN: (801)586-7094 Asbestos/LBP Shop Personnel DSN:(801)777-8006Cell: (801)940-2970
5-This inspection report only encompasses the areas/materials designated within the scope of work provided at the date of inspection (see title page for inspection date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.
2-It is possible that lead based paint could be encountered during any renovation project. Additional identification for lead based paint on other building components may be required. The facility manager/Project Manager should ensure that these components are surveyed for lead as well, to meet OSHA Standard 29 CFR 1926.62 construction requirements for lead.
3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or by laboratory analysis of 0.5 percent by weight (5,000 µg/g dry weight) or more of lead. All other components tested were less than 1 mg/cm².
4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions please feel free to call Taylor Brimberry at 586-7094.
SCOPE OF WORK: Epoxy west section of floor.
1-Positive Lead based paint readings were not-detected. Please refer to the final page of section of this inspection for all readings.
XRF Analyzer XL3T 600 (Serial #120020)XRF Analyzer Used :
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LIMITED NEGATIVE LEAD-BASED PAINT INSPECTION REPORT INFORMATION
66 1.10 97 0.91 67 1.06 98 1.07
68 0.93 POS 99 1.01
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS South Fair Light Grey 0.01 NEG South Fair Grey 0.58 NEG South Good Yellow 0.05 NEG South Good White 0.01 NEG South Good Green 0.01 NEG West Good Red 0.01 NEG West Good Dark Grey 0.79 NEG North Good Yellow 0.08 NEG East Good Grey 0.01 NEG East Good Yellow 0.01 NEG East Good Grey 0.01 NEG East Good Off-White 0.01 NEG
79 South West Project Area Floor Concrete 80 South West Project Area Floor Concrete
75 West Project Area Floor Concrete 76 West Project Area Floor Line Concrete 77 West Project Area Floor Concrete 78 South West Project Area Floor Line Concrete
XL Number Room/Area Structure
71 West Project Area Floor Line
73 West Project Area Floor Line Concrete 74 West Project Area Floor Concrete
70 West Project Area Floor Concrete 69 West Project Area Floor Concrete
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial #
Per 20 Second Reading
Calibration Range
Substrate
West Project Area Floor Line Concrete
Post Calibration
PbL (mg/cm²)XRF Analyzer XL3T 600 (Serial #120020)
Per 20 Second Reading
Concrete
| Title Page |
| Non-ACM |
| NEG-LBP |
| Readings |
| 2023-03-22T12:27:04-0600 | |
| DALY.JOHN.KYLE.1590487178 |
Range 8 to 12:
File details come from the government source that posted it. Updated .