Sheet1
| Seed Task Order - Building 265 West Bay | | | | | |
| Line Item | Line Item Description | Unit | Quantity | Unit Cost | Total Cost |
| Demolition, haul off base, and disposal of existing flooring | | | | | |
| AA. | Vinyl Floor Tile (non-asbestos) | SF | | | $0.00 |
| AB. | Carpet | SF | | | $0.00 |
| AC. | Ceramic Tile | SF | | | $0.00 |
| AD. | Equipment Hold Down Bolts/Studs | EA | | | $0.00 |
| Demolition, haul off base and disposal of existing/ Installation of new (Labor and Material) | | | |
| BA. | Wooden Cove Base | LF | $0.00 |
| BB. | Vinyl Cove Base 4", standard | LF | $0.00 |
| BC. | Vinyl Cove Base over 4", wide | LF | $0.00 |
| BD. | Transition Strip (any material) | LF | $0.00 |
| BE. | Coating Removal | SF | $0.00 |
| BF. | 2" Wide Tape Removal | LF | $0.00 |
| Surface Preparation to Include: (Labor & Material) | | | |
| CA. | Masking w/ Plastic Sheeting | LF | $0.00 |
| CB. | Lettered Signs-Safety | EA | $0.00 |
| CC. | Diamond Grinding and shot Blasting | SF | $0.00 |
| CD. | Power Washing / Vacuuming | SF | $0.00 |
| CE. | Epoxy patching | SF | $0.00 |
| CF. | Saw Cutting Concrete | LF | $0.00 |
| CG. | Seal Joints | LF | $0.00 |
| CH. | Metal Joint Plate | LF | $0.00 |
| CI. | Concrete Repair 1" Depth | SF | $0.00 |
| CJ. | Wet Screen Gym Floor | SF | $0.00 |
| Floor Coating System to Include (labor and material) | | | |
| DA. | Acrylic Sealer | SF | $0.00 |
| DB. | Primer / Sealer Coating | SF | $0.00 |
| DC. | Epoxy Solids Coating | SF | $0.00 |
| DD. | Prepare-Apply 3/16" Epoxy/Urethane | SF | $0.00 |
| DE. | Urethane Coating | SF | $0.00 |
| DF. | Two Colored Urethane | SF | $0.00 |
| DG. | Single Color Safety Paint | SF | $0.00 |
| DH. | Double Color Safety Paint | SF | $0.00 |
| DI. | Lettering Cover Plates to 2" | EA | $0.00 |
| DJ. | Dock Numbers | EA | $0.00 |
| DK. | Chemically resistant Coating | SF | $0.00 |
| DL. | Static Dissipation Coating | SF | $0.00 |
| DM. | High Performance Coating | SF | $0.00 |
| DN. | Fuel Resistive Resinous Flooring, 3-Coat | SF | $0.00 |
| DO. | Fuel Resistive Resinous Flooring, 5-Coat | SF | $0.00 |
| DP. | High Build Glaze Coating | SF | $0.00 |
| DQ. | NonSkid Abrasive | SF | $0.00 |
| DR. | 3" Paint Stripes | SF | $0.00 |
| DS. | Rapid Curing Epoxy | SF | $0.00 |
| DT. | Squadron Logo | SF | $0.00 |
| DU. | Gym Floor Recoat (Urethane, Etc.) | SF | $0.00 |
| DV. | Replace Boards in Gym Floors | SF | $0.00 |
| Dust Barrier Construction (Labor and Material) | | | |
| EA. | 12' Tall Dust Barrier | SF | $0.00 |
| EB. | 21' Tall Dust Barrier | SF | $0.00 |
| EC. | Dust Barrier over 21' | SF | $0.00 |
| ED. | 12' Tall Portable Tent | SF | $0.00 |
| Equipment Rental | | | |
| FA. | Lift (Up to 80') | EA | $0.00 |
| FB. | Generator | DAY | $0.00 |
| FC. | Licensed Electrician | HR | $0.00 |
Task Order Total $0.00