Seed Task Order Pricing Sheet - Bldg 265 West Bay.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Hill Air Force Base Epoxy Flooring and Maintenance IDIQ Federal contract opportunity
Solicitation number
FA8201-23-R-0010
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Hill Air Force Base Epoxy Flooring and Maintenance IDIQ, newest first.
File Type Posted
Epoxy IDIQ Solicitation QA.pdf PDF
Schedule B 5.5 yrs.xlsx XLSX spreadsheet
Epoxy IDIQ Section L 1 May 23 Updated.docx DOCX document
Screenshot Seed Task Area.jpg JPG image
Seed Task Order Striping Plan.pdf PDF
Revised Basic IDIQ SOW 1_May_23.pdf PDF
Screenshot Meeting Location.jpg JPG image
Schedule B 5.5 yrs.xlsx XLSX spreadsheet
afi31-118.pdf PDF
BASE FACILITY DESIGN STANDARD.Jan 23 2023.docx DOCX document
UFGS 01 57 19 Temporary Environmental Controls.pdf PDF
UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System.pdf PDF
UFGS 01 11 00 Summary of Work.pdf PDF
UFGS 02 42 51 Carpet Removal and Reclamation.pdf PDF
UFGS 32-13-13.06 PCC.docx DOCX document
Solicitation - FA820123R0010.pdf PDF
Epoxy IDIQ Section L 1 May 23.docx DOCX document
Seed TO Bldg 265 West Bay SOW 22 March 2023.pdf PDF
UFGS 01 45 00.00 20 Quality Control.pdf PDF
UFGS 01 20 00 Price and Payment Procedures.pdf PDF
01 57 20 Environmental Protection.docx DOCX document
UFGS 09 67 23.14 Chemical Resistant Resinous Flooring.pdf PDF
UFGS 02 41 00 Demolition and Deconstruction.pdf PDF
UFGS 32 01 19.61 Resealing of Joints in Rigid Pavement.docx DOCX document
Epoxy IDIQ Section M 1 May 2023.docx DOCX document
Seed TO Bldg-265 WT 12390692 Epoxy West Section.pdf PDF
UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System.pdf PDF
UFGS 32 01 19.61 Rigid Pavement Joint Seal.pdf PDF
UFGS 09 96 59 High-Build Glaze Coatings.pdf PDF
UFGS 09 06 90 Color Schedule (need colors).docx DOCX document
WD - Davis.pdf PDF
WD - Box Elder.pdf PDF
Epoxy IDIQ SOW 1_May_23.pdf PDF
RFP for Epoxy Seed Task Order Bldg 265 West Bay.pdf PDF
UFGS 09 90 00 Paints and Coatings.pdf PDF
ufc_1_300_02.pdf PDF
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls.pdf PDF
UFGS 01 35 26 Government Safety Requirements.pdf PDF
UFGS 32 13 13.06 Concrete for Site Facilities.pdf PDF
UFGS 01 32 01.00 10 Project Schedule.pdf PDF
UFGS 09 06 00 Schedules for Finishes.pdf PDF
01 35 26 Government Safety Requirements.docx DOCX document
UFGS 09 67 23.13 Standard Resinous Flooring.pdf PDF
01 32 00 Project Schedule.docx DOCX document
UFGS 01 62 35 Recycled - Recovered Materials.docx DOCX document
01 00 00 General Requirements.docx DOCX document
WD - Weber.pdf PDF
UFGS 09 96 00 High-Performance Coatings.docx DOCX document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Seed Task Order - Building 265 West Bay
Line ItemLine Item DescriptionUnitQuantityUnit CostTotal Cost
Demolition, haul off base, and disposal of existing flooring
AA.Vinyl Floor Tile (non-asbestos)SF$0.00
AB.CarpetSF$0.00
AC.Ceramic TileSF$0.00
AD.Equipment Hold Down Bolts/StudsEA$0.00
Demolition, haul off base and disposal of existing/ Installation of new (Labor and Material)
BA.Wooden Cove BaseLF$0.00
BB.Vinyl Cove Base 4", standardLF$0.00
BC.Vinyl Cove Base over 4", wideLF$0.00
BD.Transition Strip (any material)LF$0.00
BE.Coating RemovalSF$0.00
BF.2" Wide Tape RemovalLF$0.00
Surface Preparation to Include: (Labor & Material)
CA.Masking w/ Plastic SheetingLF$0.00
CB.Lettered Signs-SafetyEA$0.00
CC.Diamond Grinding and shot BlastingSF$0.00
CD.Power Washing / VacuumingSF$0.00
CE.Epoxy patchingSF$0.00
CF.Saw Cutting ConcreteLF$0.00
CG.Seal JointsLF$0.00
CH.Metal Joint PlateLF$0.00
CI.Concrete Repair 1" DepthSF$0.00
CJ.Wet Screen Gym FloorSF$0.00
Floor Coating System to Include (labor and material)
DA.Acrylic SealerSF$0.00
DB.Primer / Sealer CoatingSF$0.00
DC.Epoxy Solids CoatingSF$0.00
DD.Prepare-Apply 3/16" Epoxy/UrethaneSF$0.00
DE.Urethane CoatingSF$0.00
DF.Two Colored UrethaneSF$0.00
DG.Single Color Safety PaintSF$0.00
DH.Double Color Safety PaintSF$0.00
DI.Lettering Cover Plates to 2"EA$0.00
DJ.Dock NumbersEA$0.00
DK.Chemically resistant CoatingSF$0.00
DL.Static Dissipation CoatingSF$0.00
DM.High Performance CoatingSF$0.00
DN.Fuel Resistive Resinous Flooring, 3-CoatSF$0.00
DO.Fuel Resistive Resinous Flooring, 5-CoatSF$0.00
DP.High Build Glaze CoatingSF$0.00
DQ.NonSkid AbrasiveSF$0.00
DR.3" Paint StripesSF$0.00
DS.Rapid Curing EpoxySF$0.00
DT.Squadron LogoSF$0.00
DU.Gym Floor Recoat (Urethane, Etc.)SF$0.00
DV.Replace Boards in Gym FloorsSF$0.00
Dust Barrier Construction (Labor and Material)
EA.12' Tall Dust BarrierSF$0.00
EB.21' Tall Dust BarrierSF$0.00
EC.Dust Barrier over 21'SF$0.00
ED.12' Tall Portable TentSF$0.00
Equipment Rental
FA.Lift (Up to 80')EA$0.00
FB.GeneratorDAY$0.00
FC.Licensed ElectricianHR$0.00

Task Order Total $0.00