Schedule B 5.5 yrs.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Hill Air Force Base Epoxy Flooring and Maintenance IDIQ Federal contract opportunity
Solicitation number
FA8201-23-R-0010
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Hill Air Force Base Epoxy Flooring and Maintenance IDIQ, newest first.
File Type Posted
Epoxy IDIQ Solicitation QA.pdf PDF
Epoxy IDIQ Section L 1 May 23 Updated.docx DOCX document
Screenshot Seed Task Area.jpg JPG image
Seed Task Order Striping Plan.pdf PDF
Revised Basic IDIQ SOW 1_May_23.pdf PDF
Screenshot Meeting Location.jpg JPG image
Schedule B 5.5 yrs.xlsx XLSX spreadsheet
Seed Task Order Pricing Sheet - Bldg 265 West Bay.xlsx XLSX spreadsheet
afi31-118.pdf PDF
BASE FACILITY DESIGN STANDARD.Jan 23 2023.docx DOCX document
UFGS 01 57 19 Temporary Environmental Controls.pdf PDF
UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System.pdf PDF
UFGS 01 11 00 Summary of Work.pdf PDF
UFGS 02 42 51 Carpet Removal and Reclamation.pdf PDF
UFGS 32-13-13.06 PCC.docx DOCX document
Solicitation - FA820123R0010.pdf PDF
Epoxy IDIQ Section L 1 May 23.docx DOCX document
Seed TO Bldg 265 West Bay SOW 22 March 2023.pdf PDF
UFGS 01 45 00.00 20 Quality Control.pdf PDF
UFGS 01 20 00 Price and Payment Procedures.pdf PDF
01 57 20 Environmental Protection.docx DOCX document
UFGS 09 67 23.14 Chemical Resistant Resinous Flooring.pdf PDF
UFGS 02 41 00 Demolition and Deconstruction.pdf PDF
UFGS 32 01 19.61 Resealing of Joints in Rigid Pavement.docx DOCX document
Epoxy IDIQ SOW 1_May_23.pdf PDF
RFP for Epoxy Seed Task Order Bldg 265 West Bay.pdf PDF
UFGS 09 90 00 Paints and Coatings.pdf PDF
ufc_1_300_02.pdf PDF
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls.pdf PDF
UFGS 01 35 26 Government Safety Requirements.pdf PDF
UFGS 32 13 13.06 Concrete for Site Facilities.pdf PDF
UFGS 01 32 01.00 10 Project Schedule.pdf PDF
UFGS 09 06 00 Schedules for Finishes.pdf PDF
01 35 26 Government Safety Requirements.docx DOCX document
UFGS 09 67 23.13 Standard Resinous Flooring.pdf PDF
01 32 00 Project Schedule.docx DOCX document
UFGS 01 62 35 Recycled - Recovered Materials.docx DOCX document
01 00 00 General Requirements.docx DOCX document
WD - Weber.pdf PDF
UFGS 09 96 00 High-Performance Coatings.docx DOCX document
Epoxy IDIQ Section M 1 May 2023.docx DOCX document
Seed TO Bldg-265 WT 12390692 Epoxy West Section.pdf PDF
UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System.pdf PDF
UFGS 32 01 19.61 Rigid Pavement Joint Seal.pdf PDF
UFGS 09 96 59 High-Build Glaze Coatings.pdf PDF
UFGS 09 06 90 Color Schedule (need colors).docx DOCX document
WD - Davis.pdf PDF
WD - Box Elder.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hill

Year 1 (Basic)Year 2Year 3Year 4Year 5Year 6
Line ItemLine Item DescriptionUnitQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
Demolition, haul off base, and disposal of existing flooring
AA.Vinyl Floor Tile (non-asbestos)SF540$0.00540$0.00540$0.00540$0.00540$0.00270$0.00
AB.CarpetSF100$0.00100$0.00100$0.00100$0.00100$0.0050$0.00
AC.Ceramic TileSF40$0.0040$0.0040$0.0040$0.0040$0.0020$0.00
AD.Equipment Hold Down Bolts/StudsEA280$0.00280$0.00280$0.00280$0.00280$0.00140$0.00
Demolition, haul off base and disposal of existing/ Installation of new (Labor and Material)
BA.Wooden Cove BaseLF50$0.0050$0.0050$0.0050$0.0050$0.0025$0.00
BB.Vinyl Cove Base 4", standardLF1090$0.001090$0.001090$0.001090$0.001090$0.00545$0.00
BC.Vinyl Cove Base over 4", wideLF110$0.00110$0.00110$0.00110$0.00110$0.0055$0.00
BD.Transition Strip (any material)LF55$0.0055$0.0055$0.0055$0.0055$0.0028$0.00
BE.Coating RemovalSF21480$0.0021480$0.0021480$0.0021480$0.0021480$0.0010740$0.00
BF.2" Wide Tape RemovalLF4250$0.004250$0.004250$0.004250$0.004250$0.002125$0.00
Surface Preparation to Include: (Labor & Material)
CA.Masking w/ Plastic SheetingLF4560$0.004560$0.004560$0.004560$0.004560$0.002280$0.00
CB.Lettered Signs-SafetyEA10$0.0010$0.0010$0.0010$0.0010$0.005$0.00
CC.Diamond Grinding and shot BlastingSF46300$0.0046300$0.0046300$0.0046300$0.0046300$0.0023150$0.00
CD.Power Washing / VacuumingSF34380$0.0034380$0.0034380$0.0034380$0.0034380$0.0017190$0.00
CE.Epoxy patchingSF2360$0.002360$0.002360$0.002360$0.002360$0.001180$0.00
CF.Saw Cutting ConcreteLF4790$0.004790$0.004790$0.004790$0.004790$0.002395$0.00
CG.Seal JointsLF7480$0.007480$0.007480$0.007480$0.007480$0.003740$0.00
CH.Metal Joint PlateLF50$0.0050$0.0050$0.0050$0.0050$0.0025$0.00
CI.Concrete Repair 1" DepthSF300$0.00300$0.00300$0.00300$0.00300$0.00150$0.00
CJ.Wet Screen Gym FloorSF9340$0.009340$0.009340$0.009340$0.009340$0.004670$0.00
Floor Coating System to Include (labor and material)
DA.Acrylic SealerSF1970$0.001970$0.001970$0.001970$0.001970$0.00985$0.00
DB.Primer / Sealer CoatingSF13400$0.0013400$0.0013400$0.0013400$0.0013400$0.006700$0.00
DC.Epoxy Solids CoatingSF370$0.00370$0.00370$0.00370$0.00370$0.00185$0.00
DD.Prepare-Apply 3/16" Epoxy/UrethaneSF33940$0.0033940$0.0033940$0.0033940$0.0033940$0.0016970$0.00
DE.Urethane CoatingSF18370$0.0018370$0.0018370$0.0018370$0.0018370$0.009185$0.00
DF.Two Colored UrethaneSF14040$0.0014040$0.0014040$0.0014040$0.0014040$0.007020$0.00
DG.Single Color Safety PaintSF450$0.00450$0.00450$0.00450$0.00450$0.00225$0.00
DH.Double Color Safety PaintSF220$0.00220$0.00220$0.00220$0.00220$0.00110$0.00
DI.Lettering Cover Plates to 2"EA20$0.0020$0.0020$0.0020$0.0020$0.0010$0.00
DJ.Dock NumbersEA10$0.0010$0.0010$0.0010$0.0010$0.005$0.00
DK.Chemically resistant CoatingSF3720$0.003720$0.003720$0.003720$0.003720$0.001860$0.00
DL.Static Dissipation CoatingSF50$0.0050$0.0050$0.0050$0.0050$0.0025$0.00
DM.High Performance CoatingSF50$0.0050$0.0050$0.0050$0.0050$0.0025$0.00
DN.Fuel Resistive Resinous Flooring, 3-CoatSF100$0.00100$0.00100$0.00100$0.00100$0.0050$0.00
DO.Fuel Resistive Resinous Flooring, 5-CoatSF200$0.00200$0.00200$0.00200$0.00200$0.00100$0.00
DP.High Build Glaze CoatingSF100$0.00100$0.00100$0.00100$0.00100$0.0050$0.00
DQ.NonSkid AbrasiveSF42396$0.0042395$0.0042396$0.0042395$0.0042396$0.0021198$0.00
DR.3" Paint StripesSF3860$0.003860$0.003860$0.003860$0.003860$0.001930$0.00
DS.Rapid Curing EpoxySF1000$0.001000$0.001000$0.001000$0.001000$0.00500$0.00
DT.Squadron LogoSF10$0.0010$0.0010$0.0010$0.0010$0.005$0.00
DU.Gym Floor Recoat (Urethane, Etc.)SF9340$0.009340$0.009340$0.009340$0.009340$0.004670$0.00
DV.Replace Boards in Gym FloorsSF10$0.0010$0.0010$0.0010$0.0010$0.005$0.00
Dust Barrier Construction (Labor and Material)
EA.12' Tall Dust BarrierSF24200$0.0024200$0.0024200$0.0024200$0.0024200$0.0012100$0.00
EB.21' Tall Dust BarrierSF10100$0.0010100$0.0010100$0.0010100$0.0010100$0.005050$0.00
EC.Dust Barrier over 21'SF11290$0.0011290$0.0011290$0.0011290$0.0011290$0.005645$0.00
ED.12' Tall Portable TentSF720$0.00720$0.00720$0.00720$0.00720$0.00360$0.00
Equipment Rental
FA.Lift (Up to 80')EA20$0.0020$0.0020$0.0020$0.0020$0.0010$0.00
FB.GeneratorDAY20$0.0020$0.0020$0.0020$0.0020$0.0010$0.00
FC.Licensed ElectricianHR10$0.0010$0.0010$0.0010$0.0010$0.005$0.00
Yearly TotalsYear 1$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00Year 6$0.00
CLIN Total$0.00$0.00
Total Contract Cost Per YearYear 1$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00Year 6$0.00
Over-all Contract Total$0.00
***NOTE: For tabs "LM" and "UTTR" below there is only a quantity of 1 in each line item. We only want your unit price for these different locations. All quantities are only an estimate and not guaranteed.

LM

Year 1 (Basic)Year 2Year 3Year 4Year 5Year 6
Line ItemLine Item DescriptionUnitQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
Demolition, haul off base, and disposal of existing flooring
AA.Vinyl Floor Tile (non-asbestos)SF1$0.001$0.001$0.001$0.001$0.001$0.00
AB.CarpetSF1$0.001$0.001$0.001$0.001$0.001$0.00
AC.Ceramic TileSF1$0.001$0.001$0.001$0.001$0.001$0.00
AD.Equipment Hold Down Bolts/StudsEA1$0.001$0.001$0.001$0.001$0.001$0.00
Demolition, haul off base and disposal of existing / Installation of new (Labor and Material)
BA.Wooden Cove BaseLF1$0.001$0.001$0.001$0.001$0.001$0.00
BB.Vinyl Cove Base 4", standardLF1$0.001$0.001$0.001$0.001$0.001$0.00
BC.Vinyl Cove Base over 4", wideLF1$0.001$0.001$0.001$0.001$0.001$0.00
BD.Transition Strip (any material)LF1$0.001$0.001$0.001$0.001$0.001$0.00
BE.Coating RemovalSF1$0.001$0.001$0.001$0.001$0.001$0.00
BF.2" Wide Tape RemovalLF1$0.001$0.001$0.001$0.001$0.001$0.00
Surface Preparation to Include: (Labor & Material)
CA.Masking w/ Plastic SheetingLF1$0.001$0.001$0.001$0.001$0.001$0.00
CB.Lettered Signs-SafetyEA1$0.001$0.001$0.001$0.001$0.001$0.00
CC.Diamond Grinding and shot BlastingSF1$0.001$0.001$0.001$0.001$0.001$0.00
CD.Power WashingSF1$0.001$0.001$0.001$0.001$0.001$0.00
CE.Epoxy patchingSF1$0.001$0.001$0.001$0.001$0.001$0.00
CF.Saw Cutting ConcreteLF1$0.001$0.001$0.001$0.001$0.001$0.00
CG.Seal JointsLF1$0.001$0.001$0.001$0.001$0.001$0.00
CH.Metal Joint PlateLF1$0.001$0.001$0.001$0.001$0.001$0.00
CI.Concrete Repair 1" DepthSF1$0.001$0.001$0.001$0.001$0.001$0.00
CJ.Wet Screen Gym FloorSF1$0.001$0.001$0.001$0.001$0.001$0.00
Floor Coating System to Include (labor and material)
DA.Acrylic SealerSF1$0.001$0.001$0.001$0.001$0.001$0.00
DB.Primer / Sealer CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DC.Epoxy Solids CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DD.Prepare-Apply 3/16" Epoxy/UrethaneSF1$0.001$0.001$0.001$0.001$0.001$0.00
DE.Urethane CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DF.Two Colored UrethaneSF1$0.001$0.001$0.001$0.001$0.001$0.00
DG.Single Color Safety PaintSF1$0.001$0.001$0.001$0.001$0.001$0.00
DH.Double Color Safety PaintSF1$0.001$0.001$0.001$0.001$0.001$0.00
DI.Lettering Cover Plates to 2"EA1$0.001$0.001$0.001$0.001$0.001$0.00
DJ.Dock NumbersEA1$0.001$0.001$0.001$0.001$0.001$0.00
DK.Chemically resistant CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DL.Static Dissipation CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DM.High Performance CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DN.Fuel Resistive Resinous Flooring, 3-CoatSF1$0.001$0.001$0.001$0.001$0.001$0.00
DO.Fuel Resistive Resinous Flooring, 5-CoatSF1$0.001$0.001$0.001$0.001$0.001$0.00
DP.High Build Glaze CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DQ.NonSkid AbrasiveSF1$0.001$0.001$0.001$0.001$0.001$0.00
DR.3" Paint StripesSF1$0.001$0.001$0.001$0.001$0.001$0.00
DS.Rapid Curing EpoxySF1$0.001$0.001$0.001$0.001$0.001$0.00
DT.Squadron LogoSF1$0.001$0.001$0.001$0.001$0.001$0.00
DU.Gym Floor Recoat (Urethane, Etc.)SF1$0.001$0.001$0.001$0.001$0.001$0.00
DV.Replace Boards in Gym FloorsSF1$0.001$0.001$0.001$0.001$0.001$0.00
Dust Barrier Construction (Labor and Material)
EA.12' Tall Dust BarrierSF1$0.001$0.001$0.001$0.001$0.001$0.00
EB.21' Tall Dust BarrierSF1$0.001$0.001$0.001$0.001$0.001$0.00
EC.Dust Barrier over 21'SF1$0.001$0.001$0.001$0.001$0.001$0.00
ED.12' Tall Portable TentSF1$0.001$0.001$0.001$0.001$0.001$0.00
Equipment Rental
FA.Lift (Up to 80')EA1$0.001$0.001$0.001$0.001$0.001$0.00
FB.GeneratorDAY1$0.001$0.001$0.001$0.001$0.001$0.00
FC.Licensed ElectricianHR1$0.001$0.001$0.001$0.001$0.001$0.00
Yearly TotalsYear 1$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00Year 6$0.00
CLIN Total$0.00$0.00

UTTR

Year 1 (Basic)Year 2Year 3Year 4Year 5Year 6
Line ItemLine Item DescriptionUnitQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal CostQuantityUnit CostTotal Cost
Demolition, haul off base, and disposal of existing flooring
AA.Vinyl Floor Tile (non-asbestos)SF1$0.001$0.001$0.001$0.001$0.001$0.00
AB.CarpetSF1$0.001$0.001$0.001$0.001$0.001$0.00
AC.Ceramic TileSF1$0.001$0.001$0.001$0.001$0.001$0.00
AD.Equipment Hold Down Bolts/StudsEA1$0.001$0.001$0.001$0.001$0.001$0.00
Demolition, haul off base and disposal of existing / Installation of new (Labor and Material)
BA.Wooden Cove BaseLF1$0.001$0.001$0.001$0.001$0.001$0.00
BB.Vinyl Cove Base 4", standardLF1$0.001$0.001$0.001$0.001$0.001$0.00
BC.Vinyl Cove Base over 4", wideLF1$0.001$0.001$0.001$0.001$0.001$0.00
BD.Transition Strip (any material)LF1$0.001$0.001$0.001$0.001$0.001$0.00
BE.Coating RemovalSF1$0.001$0.001$0.001$0.001$0.001$0.00
BF.2" Wide Tape RemovalLF1$0.001$0.001$0.001$0.001$0.001$0.00
Surface Preparation to Include: (Labor & Material)
CA.Masking w/ Plastic SheetingLF1$0.001$0.001$0.001$0.001$0.001$0.00
CB.Lettered Signs-SafetyEA1$0.001$0.001$0.001$0.001$0.001$0.00
CC.Diamond Grinding and shot BlastingSF1$0.001$0.001$0.001$0.001$0.001$0.00
CD.Power WashingSF1$0.001$0.001$0.001$0.001$0.001$0.00
CE.Epoxy patchingSF1$0.001$0.001$0.001$0.001$0.001$0.00
CF.Saw Cutting ConcreteLF1$0.001$0.001$0.001$0.001$0.001$0.00
CG.Seal JointsLF1$0.001$0.001$0.001$0.001$0.001$0.00
CH.Metal Joint PlateLF1$0.001$0.001$0.001$0.001$0.001$0.00
CI.Concrete Repair 1" DepthSF1$0.001$0.001$0.001$0.001$0.001$0.00
CJ.Wet Screen Gym FloorSF1$0.001$0.001$0.001$0.001$0.001$0.00
Floor Coating System to Include (labor and material)
DA.Acrylic SealerSF1$0.001$0.001$0.001$0.001$0.001$0.00
DB.Primer / Sealer CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DC.Epoxy Solids CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DD.Prepare-Apply 3/16" Epoxy/UrethaneSF1$0.001$0.001$0.001$0.001$0.001$0.00
DE.Urethane CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DF.Two Colored UrethaneSF1$0.001$0.001$0.001$0.001$0.001$0.00
DG.Single Color Safety PaintSF1$0.001$0.001$0.001$0.001$0.001$0.00
DH.Double Color Safety PaintSF1$0.001$0.001$0.001$0.001$0.001$0.00
DI.Lettering Cover Plates to 2"EA1$0.001$0.001$0.001$0.001$0.001$0.00
DJ.Dock NumbersEA1$0.001$0.001$0.001$0.001$0.001$0.00
DK.Chemically resistant CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DL.Static Dissipation CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DM.High Performance CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DN.Fuel Resistive Resinous Flooring, 3-CoatSF1$0.001$0.001$0.001$0.001$0.001$0.00
DO.Fuel Resistive Resinous Flooring, 5-CoatSF1$0.001$0.001$0.001$0.001$0.001$0.00
DP.High Build Glaze CoatingSF1$0.001$0.001$0.001$0.001$0.001$0.00
DQ.NonSkid AbrasiveSF1$0.001$0.001$0.001$0.001$0.001$0.00
DR.3" Paint StripesSF1$0.001$0.001$0.001$0.001$0.001$0.00
DS.Rapid Curing EpoxySF1$0.001$0.001$0.001$0.001$0.001$0.00
DT.Squadron LogoSF1$0.001$0.001$0.001$0.001$0.001$0.00
DU.Gym Floor Recoat (Urethane, Etc.)SF1$0.001$0.001$0.001$0.001$0.001$0.00
DV.Replace Boards in Gym FloorsSF1$0.001$0.001$0.001$0.001$0.001$0.00
Dust Barrier Construction (Labor and Material)
EA.12' Tall Dust BarrierSF1$0.001$0.001$0.001$0.001$0.001$0.00
EB.21' Tall Dust BarrierSF1$0.001$0.001$0.001$0.001$0.001$0.00
EC.Dust Barrier over 21'SF1$0.001$0.001$0.001$0.001$0.001$0.00
ED.12' Tall Portable TentSF1$0.001$0.001$0.001$0.001$0.001$0.00
Equipment Rental
FA.Lift (Up to 80')EA1$0.001$0.001$0.001$0.001$0.001$0.00
FB.GeneratorDAY1$0.001$0.001$0.001$0.001$0.001$0.00
FC.Licensed ElectricianHR1$0.001$0.001$0.001$0.001$0.001$0.00
Yearly TotalsYear 1$0.00Year 2$0.00Year 3$0.00Year 4$0.00Year 5$0.00Year 6$0.00
CLIN Total$0.00$0.00