WTMD - CEIA Decommission Checklist 10-12-16.pdf

PDF 44 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
TSA25-04-03882
Issued by

About this file

This document contains a decommission checklist for a CEIA Walkthrough Metal Detector and related federal contract opportunity for Security Equipment Deployment Services - Checkpoint. The decommission checklist provides a detailed inventory and condition assessment of the metal detector and its components to be returned, including photos and testing of functionality. It requires signatures from the subcontractor and federal employee to verify completion. The related federal contract opportunity is a special notice for an upcoming request for proposal from the Transportation Security Administration for security equipment deployment services at checkpoints. It provides the solicitation number, brief description of services sought, and requests that offerors review the draft statement of work and provide any questions or comments by January 6, 2020.

View the file

Other files

File Type Posted
SEDS Draft Labor Categories.pdf PDF
TEDS overview of work performed_r1.pdf PDF
New IDIQ Checkpoint SIP Template 20200220.docx DOCX document
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
Checkpoint SEDS IDIQ SOW_Final Draft_r1.2.6.20.docx DOCX document
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
New IDIQ Checkpoint SIP Template 20200117.docx DOCX document
Checkpoint SEDS IDIQ SOW_Final Draft_r1.2.6.20.docx DOCX document
AIT - L3 Decommission Checklist 5-17-19.pdf PDF
ETD - 500DT De-Installation Checklist updated 01-23-2020.pdf PDF
PSP Site Survey Template.xlsx XLSX spreadsheet
BLS - CEIA EMA-MS Decommission Checklist 1-23-20.pdf PDF
Daily Site Report.xlsx XLSX spreadsheet
ETD - QSB220 De-Installation - Installation Checklist 01-23-2020.pdf PDF
AT - Smiths-Rapiscan Decommission Checklist.pdf PDF
BLS - RespondeR Decomm Checklist 1-23-20.pdf PDF
PSP Site Survey Report Template.pdf PDF
Checkpoint-SEDS Pricing Template r4.xlsx XLSX spreadsheet
Weekly Status Report 75 Rev 0.xlsx XLSX spreadsheet
TEDS overview of work performed.pdf PDF
Eval Criteria to post.docx DOCX document
Checkpoint SEDS IDIQ SOW.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Yes No

Visible hardware is tightened and secured?

Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

Hardware Package (4 Panels/4 Control Screws)?

Calibration Unit?

In v en to ry

CEIA 02PN20 WTMD System?

Power Supply - Security Plug Adapter?

(Confirm power supply has a twist lock plug)

User Manual 02PN20?

Installation Manual with Hardware/Software

Configuration Sheet?

TX/RX Antennas with Power Supply Module?

Master/Slave Control Unit with Connection Cables?

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the unit while OPERATIONAL and document any damage or concerns. (screen included)

Take a photo of the FRONT of the unit and document any damage or concerns.

Detection Audio is Operational?

Detection Lights are Operational?

Comments/ConcernsEvaluation Criteria

V is u a l V er if ic a ti o n U n it

C o n d it io n

Shipping Box/Package?

Unit Keys?

Does the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers)

Panels are flush and fit satisfactory?

T es ti n g

Maintenance Manual?

Panel A (Transmitter)/Panel B (Receiver)?

720mm Crosspiece?

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition

Decommission Checklist For the CEIA

Walkthrough Metal Detector (WTMD)

Operation Test Kit (OTK)?

Take a photo of the MASTER ELECTRONIC UNIT on the unit and document any damage or concerns.

WTMD S/N: TSA/FAA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

Yes No

Performed By:

Are there any components missing? If YES, please specify in the comments section.

Is a Verification Kit being returned with this unit? If YES, please note it in the comments section.

Take photo of the unit PACKAGED for shipping and document any damage or concerns.

U n it

P a ck a g in g

Signature Date

Subcontractor Contact Information and Verification

Evaluation Criteria Comments/Concerns

System Integrator Section (This section should be filled in by the System Integrator ONLY)

Has all damage been documented? If NO, please specify in the comments section.

Printed Name

Sign and date this Decommission Checklist and leave a copy with the unit.

Systems Integrator Additional Comments

V is u a l V er if ic a ti o n

Is the labeling correct on the packaging?

Printed Name Email Address Phone Number

Company Name

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

DateSignature

Federal Employee Comments/Concerns

Federal Employee Verification

As a witness, sign and date this Decommission Checklist to confirm the document was completed on-site.

Confirmed By:

Printed Name

Email Address Phone Number

Signature DateCompany Name

Systems Integrator Contact Information and Verification

Sign and date this Decommission Checklist and leave a copy with the unit.

Reviewed By:

File details come from the government source that posted it. Updated .