Daily Site Report.xlsx

XLSX spreadsheet 101 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
TSA25-04-03882
Issued by

About this file

This document contains a draft statement of work and daily site report template for security equipment deployment services at airport checkpoints. The Transportation Security Administration seeks these services to install security screening equipment at airports nationwide. Offerors must review the statement of work and provide any questions or comments by January 6, 2020. The draft evaluation criteria, pricing sheets, and contract data requirements lists will be released by December 20. The daily site report template requires contractors to provide daily updates on progress, risks, issues, milestones, and equipment installation for each airport site. Reports are due no later than 7 AM local time and must begin once integration process team calls start for each region.

View the file

Other files

File Type Posted
SEDS Draft Labor Categories.pdf PDF
TEDS overview of work performed_r1.pdf PDF
New IDIQ Checkpoint SIP Template 20200220.docx DOCX document
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
Checkpoint SEDS IDIQ SOW_Final Draft_r1.2.6.20.docx DOCX document
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
New IDIQ Checkpoint SIP Template 20200117.docx DOCX document
Checkpoint SEDS IDIQ SOW_Final Draft_r1.2.6.20.docx DOCX document
AIT - L3 Decommission Checklist 5-17-19.pdf PDF
ETD - 500DT De-Installation Checklist updated 01-23-2020.pdf PDF
PSP Site Survey Template.xlsx XLSX spreadsheet
BLS - CEIA EMA-MS Decommission Checklist 1-23-20.pdf PDF
ETD - QSB220 De-Installation - Installation Checklist 01-23-2020.pdf PDF
AT - Smiths-Rapiscan Decommission Checklist.pdf PDF
BLS - RespondeR Decomm Checklist 1-23-20.pdf PDF
PSP Site Survey Report Template.pdf PDF
Checkpoint-SEDS Pricing Template r4.xlsx XLSX spreadsheet
WTMD - CEIA Decommission Checklist 10-12-16.pdf PDF
Weekly Status Report 75 Rev 0.xlsx XLSX spreadsheet
TEDS overview of work performed.pdf PDF
Eval Criteria to post.docx DOCX document
Checkpoint SEDS IDIQ SOW.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00000000

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000001

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000002

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000003

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000004

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000005

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000006

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000007

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built

00000008

CDRL 01- DAILY SITE REPORT
CDRL Purpose:The Contractor shall deliver daily site progress and status reports for each site detailing accomplishments, risks and issues. These reports are critical to the Program Office’s ability to update program status reports accurately. Reports are due No Later Than 7AM Local time for all Regions. Daily reports are to begin once the IPT calls have commenced unless otherwise directed by the Regional Deployment Manager.
System Integrator:System Integrator POC:
Airport InformationTechnology Information
SystemOEMAllocatedInstall/Remove/RelocatationSite Prep
Airport Code:
Airport Name:
Task Order:

Date: 00/00/0000

Site Points of Contact
Company/PositionNameE-mail AddressOfficeCell

ReMAG Number Need Date Ordered Date Received Date Status Date Started Date Completed

Days Activities/Accomplishments
CompanyNo. of PersonnelStart TimeEnd TimeActivities Performed

Activities Planned for Tomorrow

Specific Deployment Site Risks
Date IdentifiedRisk ItemDescriptionRecommendationStatus
Issues and Variances to SIP
Date IdentifiedTask OwnerDescriptionContributing Factors
Cumulative System Installation
Location (Ckpt/Ln)TechnologySerial NumberTSA BarcodeSupporting AncillarySAT DateRAD DateComments
Key Milestones
Key MilestoneScheduled Completion DateCompletion DateComments
Notice to Proceed
Concept Drawing Approval
100% Construction Drawings
Permit Application Submission
ReMAG Submittal
Sub-Contractor SOW
Sub-Contract Award
SIP Submittal
Pre-Construction Meeting
Permit Approval
Start Site Work
Close out
Warehouse Close Out
Sign off on CAS As-Built