PSP Site Survey Template.xlsx

XLSX spreadsheet 173 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
TSA25-04-03882
Issued by

About this file

This document contains a site survey template and draft statement of work for security equipment deployment services at checkpoints. The site survey template provides a checklist for evaluating existing electrical systems, IT infrastructure, equipment, and queue areas at checkpoints. It requests information on badging requirements, permitting processes, insurance requirements, and lists of approved contractors. The draft statement of work seeks proposals for deploying security equipment at checkpoints and provides December 20, 2019 and January 6, 2020 as dates for TSA to release pricing sheets, evaluation criteria, and contract data requirements and for offerors to submit any questions, respectively. The Transportation Security Administration plans to award the contract in the second quarter of fiscal year 2020.

View the file

Other files

File Type Posted
SEDS Draft Labor Categories.pdf PDF
TEDS overview of work performed_r1.pdf PDF
New IDIQ Checkpoint SIP Template 20200220.docx DOCX document
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
Checkpoint SEDS IDIQ SOW_Final Draft_r1.2.6.20.docx DOCX document
Draft SEDS FFP Labor Categories.xlsx XLSX spreadsheet
New IDIQ Checkpoint SIP Template 20200117.docx DOCX document
Checkpoint SEDS IDIQ SOW_Final Draft_r1.2.6.20.docx DOCX document
AIT - L3 Decommission Checklist 5-17-19.pdf PDF
ETD - 500DT De-Installation Checklist updated 01-23-2020.pdf PDF
BLS - CEIA EMA-MS Decommission Checklist 1-23-20.pdf PDF
Daily Site Report.xlsx XLSX spreadsheet
ETD - QSB220 De-Installation - Installation Checklist 01-23-2020.pdf PDF
AT - Smiths-Rapiscan Decommission Checklist.pdf PDF
BLS - RespondeR Decomm Checklist 1-23-20.pdf PDF
PSP Site Survey Report Template.pdf PDF
Checkpoint-SEDS Pricing Template r4.xlsx XLSX spreadsheet
WTMD - CEIA Decommission Checklist 10-12-16.pdf PDF
Weekly Status Report 75 Rev 0.xlsx XLSX spreadsheet
TEDS overview of work performed.pdf PDF
Eval Criteria to post.docx DOCX document
Checkpoint SEDS IDIQ SOW.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet

PSP Site Survey Report
Site Survey Checklist Cover Page
CDRL Purpose:
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
TitleNamePhoneEmail
System Integrator (SI) Task Order Manager
SI Site Survey Lead
SI Electrical Engineer
TSA Federal Security Director (FSD)
TSA Assistant Federal Security Director (AFSD)
TSA Project Lead/Primary POC
TSA Project Assistant
IT POC
Airport Authority Representative
Airport Facilities
Airport Electrical
Law Enforcement
Checkpoints/Overview
Terminal/Checkpoint Name or IDNumber of LanesComments
0
Shipping Address
0
Drawing Set Used for Validation
Title and TSA Approval StatusDateSource
0

Passenger Screening Program

Sign-in Sheet

PSP Site Survey Report
Site Survey Attendees Sign-in Sheet
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:

Name Organization Phone Number Email

Badging

PSP Site Survey Report
Badging Requirements
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
BADGING
The following documents the badging requirements.
Will local Airport Security Personnel provide escort?0
Is contractor badging required?0
Will the badging include escort privileges?0
Is a badging class required?0
What is the schedule for the badging class?0
Badging AuthorityPOCContact InformationHours of Operation

Time To Obtain Cost Associated Valid For Escorting Privileges

Documents AcceptedNotes:
Driver's License0
Birth Certificate0
Social Security Card0
Passport0
# of Docs Required0

Office of Security Capabilities Passenger Screening Program Passenger Screening Program

YES

YES

YES

YES

NO

NO

NO

NO

Permitting

PSP Site Survey Report
Permitting Requirements
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
PERMIT GENERAL DOCUMENTATION REQUIREMENTS
Permitting Authority and Address:0
Describe the Process Required by Permitting Agencies:0
Describe the Permitting Requirements:0
Describe Permitting Lead Time:0
# Raised/Signed & Sealed Drawings and Specifications Required:0
# D Sized Drawings Required:0
# of 11x17-Size Copies Req'd:0
Address to Send Signed & Sealed Copies:0
Cost of Obtaining Permits:0
FOR THIS SPECIFIC PROJECT
Is permitting required?0
PERMIT TYPE APPLICABILITY FOR THIS PROJECT0
Type of PermitDescribe the Type of Work Effort that Requires Each Type of PermitAirport POC and Contact Info (Phone, E-Mail)
Construction Permit0
Building Permit00
Electrical Permit00
Electrical Load Study00
Seismic Analysis00
Structural Analysis00
HVAC Analysis00
Asbestos Study00
Waste Removal Plan00
Spill Response Plan00
Other (e.g., Tenant Improvement Plan):00

Passenger Screening Program

Cert of Insurance

PSP Site Survey Report
Certificate of Insurance Requirements
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Certificate of Insurance
The following documents any Certificate of Insurance requirements. Include additional attachments or documentation as necessary.
Is a Certificate of Insurance required?Minimum Insurance Requirements
General Liability
Additional InsuredAutomobile Liability
NameUmbrella Liability
AddressWorker's Compensation
Bodily Injury
City, State, ZIPProperty Damage
Submit toNotes
Name
E-Mail
Fax

Office of Security Capabilities Passenger Screening Program Passenger Screening Program

Vendors

PSP Site Survey Report
Current List of Permitted/Badged Airport Service Contractors
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:

Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? Any special licensing requirements for trades (e.g., must be licensed in the state, county, city, etc.)? 0

Type ContractorElectrical/DataType ContractorElectrical/Data
NameName
AddressAddress
CityCity
StateState
Zip CodeZip Code
Point of ContactPoint of Contact
Phone OfficePhone Office
Phone CellPhone Cell
FaxFax
E-Mail AddressE-Mail Address
Badged?Badged?

Office of Security Capabilities Passenger Screening Program Passenger Screening Program

Hours of Operation

PSP Site Survey Report
Hours of Operation/Equipment Summary
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Checkpoint Operational Hours
Weekdays0
Weekends0
Checkpoint must be turned over0
Electrical room access0
Basement access0
Hours available for site survey0
Hours available for site preparation0
Notifications to be made when arriving on site0

Elec Panel

PSP Site Survey Report
Electrical Panel(s)
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Describe required procedure to obtain access to power panel
0
Describe required conduit route from electrical room to checkpoint; noting any restricted areas, space characteristics (public, utilities, etc.), special conditions, floor wall penetrations, or other potential cost considerations.
0
Are panels located in locked rooms or areas? (Y/N)0Are panels located in locked rooms or areas? (Y/N)
Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet)0Approximate average physical distance and conduit distance of panels from Checkpoint lanes (feet)
Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.)0Volt-amp (VA) or current rating of existing significant non-checkpoint loads on the panel (i.e., HVAC, transformers, refrigeration, motors, other industrial equipment, etc.)
Pictures of panels feeding Checkpoint equipment. Include panel ID/label, rating, main breaker, branch circuit breakers, schedule, etc.

Pictures of appropriate sub-panel, if needed. Panel label, rating, panel capacity, and type of panel showing

**Pictures of conduit routes, if possible.**

Office of Security Capabilities

Passenger Screening Program

Elec Existing

PSP Site Survey Report
Existing Electrical
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Answer noted questions with relevant pictures and descriptions.
Describe mounting of existing electrical devices.

Floor-mounted or power pole?

If floor, recessed (poke-thru) or surface?

If floor, conduit entry core-drilled or surface run?0
Other Notes:0
Pictures of Electrical/Data Outlets - Labeled for Each TSE & Lane

Passenger Screening Program

Elec Delta

PSP Site Survey Report
Electrical Changes
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
List tasks required to modify/upgrade infrastructure to accommodate required CAT units, starting from existing conditions.
Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.)Additional Breakers in Existing Panel (panel ID, quantity, ratings, etc.)
0
0
New Receptacles (quantity, location, etc.)New Receptacles (quantity, location, etc.)
0
0
New Data OutletsNew Data Outlets
0
0
New Conduit (quantity, distance, location, routing, etc.)New Conduit (quantity, distance, location, routing, etc.)
0
0
New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.)New Panel (rating, source [480V] panel location, conduit distance from source to new panel, feed breaker required, conduit required, etc.)
0
0
Panel Expansion/Extension, Sub-Panel (size, location, etc.)Panel Expansion/Extension, Sub-Panel (size, location, etc.)
0
0
OtherOther
0
0

Office of Security Capabilities Passenger Screening Program Passenger Screening Program

Lane Summary

PSP Site Survey Report
Lane Summary
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Checkpoint Name:MainStandard, PreCheck, or Flex?
S/P/FTDC Podium
Y/NPower
Y/NDedicated Circuit
Y/N# of Data PortsRelocate Power Pole/Poke-thru
Y/NCable to IT Cabinet More Than 295'?
Y/NList average data cable length and describe any deficiencies.

Pictures of Each TDC Location

IT

PSP Site Survey Report
Information Technology Connectivity
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:

Make & Model of Switch(es) & Patch Panel(s) Total # of Ports # of Open Switch Ports or UnTerminated Patch Ports Location (room #) Is cable distance to TSE more than 295'? Category Cable

Is there room in existing rack for additional patch panels/switches? Is there space/power in existing room for an additional IT rack?

List any cables that exceed 295' or fail any test.

Describe required procedure to obtain access to IT rack(s).

Describe required routing for data cables and if conduit is required.

Any airport-provided IT connections? If yes, describe.

Pictures: Location/Patch Panel

Passenger Screening Program

Existing Equip Summary

PSP Site Survey Report
Existing Equipment Summary
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Existing Equipment Summary (TSA Standard Equipment Only)
TSE TypeTSE NumberTSE OEM

Passenger Screening Program

Design Issues

PSP Site Survey Report
Design Issues
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:

Terminal/Checkpoint Lane Drawing/Design Issue Additional Comments

Queue Area Validation

PSP Site Survey Report
Queue Area Validation
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:
Checkpoint/TerminalDimensions of Queue AreaNumber of TDCsNumber of StanchionsAdditional Comments
00
Identify if an Employee/Known Crew Members (KCM) lane is being used?
Is the Employee/KCM lane identified with signage?Identify if an Employee/Known Crew Members (KCM) lane is being used?
Is the Employee/KCM lane identified with signage?0
Identify if a PreCheck lane is being used?
Is the PreCheck lane identified with signage?Identify if a PreCheck lane is being used?
Is the PreCheck lane identified with signage?0
How many lanes are established for passenger use?How many lanes are established for passenger use?0
Are there any other lanes/queues established for other use? If so, please identify their usage.Are there any other lanes/queues established for other use? If so, please identify their usage.0
Pictures of Queue Area Surveyed, Including Proposed CT Testing Area

Alarms

PSP Site Survey Report
Duress/Covert Alarms
System Integrator:
System Integrator POC:
Airport Name:
Airport Code:Survey Date:

Terminal/Checkpoint/Lane Type of Equipment Push-Button Needed? Additional Comments (Wireless, Hardwired, Integrated)

Total Number of Push Buttons to be Ordered/Sent to Local TSA

Termination (location where monitored - NOT equipment end)0
Owner0
Maintenance/Contractor0
Any New Circuits Required?0
Identify Duress Alarm Type, Power, and Connectivity0

Passenger Screening Program

Decompress Pix Instruction

PSP Site Survey Report

Instructions to Compress Pictures

* Click on Picture within the file.

* Click on Picture Tools/Format Tab at top of file.

* Click on Compress Pictures.

* De-select "Apply only to this picture".

* Click on "Email" Circle.

* Select OK.

image1.png

File details come from the government source that posted it. Updated .