ETD - QSB220 De-Installation - Installation Checklist 01-23-2020.pdf

PDF 246 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
TSA25-04-03882
Issued by

About this file

This document contains a de-installation and installation checklist for the L3 Implant Sciences QS-B220 explosive trace detection system. The checklist provides guidance for contractors to inventory, test, clean, visually inspect, package, and document the condition of the QS-B220 unit being removed and returned. Photographic evidence is required along with signatures and dates from the contractor, systems integrator, and federal employee witnessing the process.

The related federal contract opportunity is a draft statement of work for security equipment deployment services at transportation checkpoints. The Transportation Security Administration seeks industry feedback on the draft SOW by January 6, 2020 and plans to release the request for proposal in the second quarter of fiscal year 2020. The SOW scope involves providing deployment services for checkpoint screening equipment.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Last Updated Jan. 2020

Quantum Sniffer QS-B220 System

The comments/concerns section may be used to provide further detail concerning unit quality, quantity, or general notes on unit/part condition Section Evaluation Criteria Yes No Comments/Concerns

In ve nt or y

L3 Implant Sciences QS-B220 System?

Power Supply?

Unit Hand Wand?

Unit Swabs?

Printer Paper?

Unit Filter?

Current Software Version Current Version

U ni t C on di tio n Does the unit have any Exterior Damage?

(i.e. broken pieces, dents, paint chipping, locally added stickers) Does the unit have Interior Damage?

(i.e. broken pieces, dust, locally added stickers)

T es tin g Did you SHUTDOWN the software and wait for the screen to turn black?

Did you turn off the power switch and disconnect power cords?

U ni t F un ct io na lit y

Does the System turn on?

Does the System become "Ready"?

Does the System allow Supervisor-level log on?

Is the System time correct?

Does the System pass the verification check?

Does the System alarm correctly?

Does the System clear alarms correctly?

Does the Printer function correctly?

C le an in g U ni t

Outer House Cleaning The Contractor shall use Isopropyl Alcohol Wipes to wipe down all surfaces of the system, including the touchscreen.

• Caution! The Contractor shall use care when wiping down the Desorber Cover as the Desorber is hot and may cause burns.

V is ua l

V er ifi ca tio n

Take a photo of the unit while OPERATIONAL and document any damage or concerns.

Take a photo of the FRONT of the unit and document any damage or concerns.

Take a photo of the SIDES of the unit and document any damage or concerns.

Take a photo of the BACK of the unit and document any damage or concerns.

Take a photo of the SERIAL NUMBER and BARCODE on the unit and document any damage or concerns.

De-Installation / Installation Checklist

For the L3 Implant Sciences QS B220

ETD S/N: TSA/FAA Bar Code Number:

Airport Code: Terminal: Date of Test: Time:

Last Updated Jan. 2020

Take a photo of the POWER CORD and document any damage or concerns.

Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.

Performed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Subcontractor Contact Information and Verification

U ni t Pa ck ag in g Take photo of the unit PACKAGED in correct shipping box with foam inserts and document any damage or concerns.

Is the labeling correct on the packaging?

Sign and date this De-Installation / Installation Checklist and leave a copy with the unit.

Performed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Subcontractor Contact Information and Verification

Systems Integrator Additional Comments

System Integrator Section (This section should be filled in by the System Integrator ONLY) Evaluation Criteria Yes No Comments/Concerns

Has all damage been documented? If NO, please specify in the comments section.

Are there any components missing? If YES, please specify in the comments section.

Is a Verification Kit being returned with this unit? If YES, please note it in the comments section.

Sign and date this De-installation / Installation Checklist and leave a copy with the unit.

Reviewed By:

Printed Name Email Address Phone Number

Company Name Signature Date

Systems Integrator Contact Information and Verification

Federal Employee Comments/Concerns

As a witness, sign and date this De-Installation / Installation Checklist to confirm the document was completed on-site.

Confirmed By:

Printed Name Signature Date

Federal Employee Verification

Last Updated Nov. 2019