New IDIQ Checkpoint SIP Template 20200220.docx

DOCX document 62 KB Posted

Attached to
Security Equipment Deployment Services - Checkpoint
Solicitation number
TSA25-04-03882
Issued by

About this file

This document is a site implementation plan template for security equipment deployment services at airport checkpoints. The template provides guidance on roles and responsibilities, site validation, tasks required at specific checkpoints including equipment deployment and restoration work, a site schedule with preparatory work and daily activities over four days, CCTV needs by checkpoint, and special site considerations. It also includes appendices with equipment lists, a rigging report, and statements of work for equipment movement, electrical, and general contractor services. The related federal contract opportunity is a special notice for a security equipment deployment services contract for checkpoint with an estimated value to provide these services nationwide. Interested offerors are requested to review the draft statement of work and provide any questions or comments by January 6, 2020. The Transportation Security Administration plans to release a request for proposal for this requirement during the second quarter of fiscal year 2020.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE IMPLEMENTATION PLAN

Site Implementation Plan – SIP IDIQ Contract Number Region:

Effort Name Task Order Number

Airport Name

Document Date:

CDRL 011 Purpose:
The purpose of the SIP is to outline and document contractor contingencies, site specific access requirements, operational timeliness, a communication process, and a general plan for installation. The SIP should contain all additional information and documentation as outlined in the SOW.

Airport Code:

Date:

SEDS Vendor:

SEDS vendor POC:

Table of Contents

SECTION 1: PURPOSE4
SECTION 2: ROLES AND RESPONSIBILITIES5
SECTION 3: SITE VALIDATION6
3.1Results of the site validation6
3.2Shipping / Rigging Plan6
SECTION 4: SITE TASKS8
SECTION 5: SITE SCHEDULE9
5.1New Technology Installation Schedule9
5.2Preparatory Work9
5.3Daily Activities11
SECTION 6: CCTV13
6.1Checkpoint T2, T413
SECTION 7: SPECIAL SITE CONSIDERATIONS14
7.1General14
SECTION 8: APPENDICES15
Appendix A: Equipment List – Decommissioned / Relocated / Installed15
Appendix B: Rigging Report15
B.1 Overall Issues and concerns15
B.2 Checkpoint15
B.3 Checkpoint Additional as Needed16
Pictures of the site and rigging path are shown below16
Appendix C: Site Preparation Package16

SECTION 1: PURPOSE

Terminal
Checkpoints
# of Lanes
Airline(s)
Gates
International/ Domestic?

SECTION 2: ROLES AND RESPONSIBILITIES

The points of contact, including phone numbers, e-mail addresses, and roles and responsibilities, for this project are identified below.

Name
Title
Office Number
Cell Number
Email

SECTION 3: SITE VALIDATION

The site validation should review the infrastructure of the relevant Airport building (electrical, floor loading, ceiling height, floor slopes, camera position views and duress alarms where required), the dimensions provided in the drawings, any hazardous material abatement requirements, and any other pertinent data. The site validation is an opportunity to make changes to the drawings in order that existing core drills can be reused or discuss any other proactive measures that could simplify the project, save money and/or provide a better design for the end users.

3.1 Results of the site validation

a. Validation Trip Date:

b. Validation Trip Attendees and Roles:

c. Drawing Set Used

d. RFC Status

e. Approved Deployment Concept Drawing Set

3.2 Shipping / Rigging Plan

a. Shipping

b. TSE Storage Location (Local warehouse address and POC)

c. Rigging

SECTION 4: SITE TASKS

4.1 Terminal 2 – Main Checkpoint

a. Hours of operation

b. Electrical / Data Cable Work Effort

c. Architectural Work Effort Tasks:

d. Equipment Deployment

e. Site Restoration Efforts Required

4.2 Terminal 4 – Main Checkpoint

a. Hours of operation

b. Electrical / Data Cable Work Effort

c. Architectural Work Effort Tasks:

d. Equipment Deployment

e. Site Restoration Efforts Required

SECTION 5: SITE SCHEDULE

Below is the day-by-day plan of activities to be completed during this project. Four (4) days of effort are required to complete activities at [Airport Code].

5.1New Technology Installation Schedule
Installation Date
Technology Type
OEM
Checkpoint
Lane

Total

5.2 Preparatory Work

CHECKPOINT [checkpoint name / number] PREPATORY WORK

ACTIVITY #
ACTIVITY DESCRIPTION
RESPONSIBLE PARTY

CHECKPOINT [checkpoint name / number] PREPATORY WORK

ACTIVITY #
ACTIVITY DESCRIPTION
RESPONSIBLE PARTY

5.3 Daily Activities

DAY/NIGHT 1

ACTIVITY #
ACTIVITY DESCRIPTION
RESPONSIBLE PARTY

DAY/NIGHT 2

ACTIVITY #
ACTIVITY DESCRIPTION
RESPONSIBLE PARTY

DAY/NIGHT 3

ACTIVITY #
ACTIVITY DESCRIPTION
RESPONSIBLE PARTY

DAY/NIGHT 4 | Add More as Needed

ACTIVITY #
ACTIVITY DESCRIPTION
RESPONSIBLE PARTY

SECTION 6: CCTV

The following section provides a description of CCTV needs/requirements broken down by Checkpoint.

6.1Checkpoint T2, T4
a.General Description of CCTV Needs/Issues

b. Number of Cameras

c. Repositioning Needs

d. New Purchase Needs

e. Specific Airport Requirements

SECTION 7: SPECIAL SITE CONSIDERATIONS

7.1 General

a. TSA requirements

b. Airport/Vendor/Airline requirements

c. Specific airport concerns

SECTION 8: APPENDICES

Appendix A: Equipment List – Decommissioned / Relocated / Installed This section identifies the Transportation Security Equipment (TSE) and infrastructure by item type that will be decommissioned, relocated or installed at checkpoints.

Status (Decommission / Relocate / Install)

TSE Type
Vendor and Model #
Serial Number
TSA Barcode
Old Location (Term/ Ckpt/ Ln)
New Location

(Term/ Ckpt / Ln)

Appendix B: Rigging Report To coordinate delivery and storage of the TSE and ancillary equipment, shippers and riggers are to contact only the Site Lead.

B.1 Overall Issues and concerns

· Required Contacts

· Floor Protection Requirements

a. Floor protection requirements will be provided upon load calculation provided by the SEDS Vendor Team.

· Airport Requirements B.2 Checkpoint

· Delivery Route:

· Internal Points of Entry and Path:

B.3 Checkpoint Additional as Needed

· Delivery Route:

· Internal Points of Entry and Path:

Pictures of the site and rigging path are shown below

Appendix C: Site Preparation Package This section contains the Site Preparation Package.

The definition of the scope of work for this effort is described in the following Contractor Statements of Work (SOW), which are supplied as attachments inline below.

1. Equipment Movement/Rigger Contractor and SOW document

1. Electrical Contractor SOW document

1. General Contractor SOW document

Estimated SEDS Vendor Fixed Unit Price Scope Items:

Shipping
Rigging
Installation
De-Installation
Packaging
Crating
Temp

Storage Total SEDS Fixed Unit Pricing Estimate

Airport Code
$
$
$
$
$
$
$
$

Estimated Cost-Type Scope Items Note: Estimates derived using rates as of xx/xx/2017

Awarded Contractor
SOW Title
Date
Proposal Bid Estimate
Contracted Vendor Cost

OEM Install/De-install Kits and Consumables: OEM according to TSE type

Equipment Movement Contractor:

SEDS Vendor’s Rigging subcontractor

Electrical Contractor:

TBD

General Contractor:

Attachment 1: Airport Code Equipment Movement Statement of Work:

Attachment 2: Airport Code Electrical Statement of Work:

Attachment 3: Airport Code General Contractor Statement of Work:

Attachment 4: Airport Code Miscellaneous Other Statements of Work:

Document Date:

Document Number: Page 18 of 18 image1.jpeg