TGI 38K6171101A01_c0v0.pdf

PDF 1 MB Posted

Attached to
USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
Solicitation number
N6264926RA036
Issued by

About this file

This is a WebAIM Short Form Task Group Instruction (TGI) for naval maintenance work on USS RAFAEL PERALTA (DDG-115). The document outlines a project to replace the nonskid system on the train platform and mounting plate of the Aft Close-In Weapon System (CIWS), totaling 45 square feet of aluminum surfaces located on Level 02 Weather between Frames 306 and 316, Port and Starboard. The work area excludes sections with rubber tile installations and sealing compound on fasteners, with detailed location information provided in the attached sketch.

The project is scheduled to begin on 7/27/2026 and be completed by 9/4/2026. The work procedures require compliance with standard requirements 009-032 from reference documentation, specifically Table 2 Line 72 for areas receiving new nonskid and Line 73 for areas not receiving new nonskid. SRF-JRMC will provide supporting services including crane and rigging, electrical utilities, water/steam/low-air pressure supply, safety and gas-free inspections for employees, and Quality Assurance inspection. No Government Furnished Materials are required. The document was prepared by M. Maeda (Code 231B) and approved by S. Nakano (Code 231B) on 26-NOV-2025, with Work Integration Manager T. Yaginuma (Code 333) coordinating the project. References NAVSEA Standard Items (FY-26) and Local Standard Items for material specifications.

View the file

Other files

File Type Posted
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
TGI_38K6151101A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-JAN-2026 1607

20.15.6.0.9333 (July 2025) ICN: 38K6171101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT CIWS MOUNT DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 15411

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON TRAIN PLATFORM AND MOUNTING PLATE OF AFT CIWS

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

CG040472

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

MAEDA, MITSUO 231B 3152436101 26-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 26-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CG04-0472

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU 03 WEATHER 03 305 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

711A2101

1. SCOPE/PURPOSE:

1.1 Title: Nonskid System on Train Platform and Mounting Plate of AFT Close In Weapon System (CIWS); replace

1.2 Location of Work:

1.2.1 02 Level Weather, Frames between 306 and 316, Port and Starboard (Stbd)

1.3 Identification:

1.3.1 Quantity (45 SF in Total), Train Platform and Mounting Plate of AFT CIWS, Frames between 306 and 316, Port and Stbd

Material: Aluminum Remarks: The area excepts where rubber tile are installed and sealing compound on fastener.

See Sketch Enclosure-01 for location detail.

1.4 Security Classification: None.

TGI Short Form

21-JAN-2026 1607

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6171101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT CIWS MOUNT DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 15411

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON TRAIN PLATFORM AND MOUNTING PLATE OF AFT CIWS

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 2, Line(s) 72, for each area receiving new nonskid and Table 2, Line(s) 73, for each area not receiving new nonskid listed in 1.3.1.

2.2 Notes:

2.2.1 Planner: Code 231B M. Maeda, 243-6101

Engineer: Code 250 J. Igarashi, 243-4230

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.2.3 JCN CG04-0472 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38K6171101S02).

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including water supply, steam supply, and low air pressure supply except onboard blasting work.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 7/27/2026

Kouichi.Yoshida.ja Typewritten Text 9/4/2026

21-JAN-2026 1607

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6171101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: AFT CIWS MOUNT DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 15411

CU PHASE TITLE: *F/O - REPLACE NONSKID SYSTEM ON TRAIN PLATFORM AND MOUNTING PLATE OF AFT CIWS

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6171101A01-Sketch.pdf 26-NOV-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6171101 KEY OP: A01

Sheet 1 of 138K6171101A01

SKETCH

ENCLOSURE-01

Replacement of Nonskid Area of AFT CIWS

Rubber Tile Sealing Compound

LKG FWD

LKG FWD

SECT

SECT