TGI_38K6113701A01_c0v0.pdf
PDF 2 MB Posted
- Attached to
- USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
- Solicitation number
- N6264926RA036
About this file
This is a Task Group Instruction (TGI) document for maintenance and repair work on the USS RAFAEL PERALTA (DDG-115), a naval destroyer. The TGI Number 02 WEATHER specifies comprehensive work on the 02 Level Weather deck and related areas, with a contractor work start date of 8/10/2026 and completion date of 9/4/2026.
The primary scope includes replacement of the nonskid system on 5,400 square feet of 02 Level deck plating (Frames 242-396, Port and Starboard), 35 square feet on the Step Platform for the Close-In Weapon System, and 300 square feet on the 02 1/2 Level Stack deck. The nonskid application must conform to MIL-PRF-24667, Type V, Composition G, with power tool cleaning to bare metal for vertical surfaces per SSPC-SP 11 specifications. Additionally, the work includes replacement of fasteners (67 truss head screws and 67 washers for the AFT Vertical Launching System drain trough cover plate), installation of toggle pins for lifeline stanchion assemblies (totaling 138 toggle pins across various locations), preservation of 50 lifeline stanchions and 31 stanchion braces on 02 Level, installation of 17 stanchions and 9 braces on 02 1/2 Level, and installation of 35 welded bonding strap assemblies on 02 1/2 Level Weather. Government-furnished materials include wire rope, swaging ferrules, toggle pins, fasteners, and bonding straps. SRF-JRMC will provide support services including crane and rigging, electrical utilities, water and steam supply, safety and gas-free inspections, QA inspections, and VLS work scope verification. The document references multiple technical drawings, military standards, and SSPC painting specifications to guide execution of all work tasks.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: 02 WEATHER AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE:
F/O - ACCOMPLISH REPLT OF NONSKID SYS, PSVTN OF STAN, & INSTL OF EQPT ON 02 LVL
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
MITSUO MAEDA 231B 315-243-6101 19-NOV-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B 315-243-4502 19-NOV-2025
CONCURRED BY: CODE PHONE DATE
ATSUHIRO KUMAGAYA 294 315-243-5749 19-NOV-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: 02 WEATHER AY A 0
FOUO
SHIP: DDG-115 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-6 J1-2 M1-3 Sketch (1-4)
1. SCOPE/PURPOSE
1.1 Title: Replacement of Nonskid System, Preservation of Stanchion, and Installation of Equipment on 02 Level Weather; accomplish
1.2 Location of Work:
1.2.1 02 Level Weather, Frames between 242 and 396, Port and Starboard (Stbd)
1.2.2 Step Platform Weather, 54 Feet 4 Inches Above Base Line (ABL), Frames between 316 and 320, Port and Stbd
1.2.3 02 1/2 Level Weather, Frames between 370 and 386, Port and Stbd
1.2.4 Ships Service Gas Turbine Generator Exhaust Trunk (1-370-2-Q)
1.2.5 Aviation Storeroom No. 2 (01-370-1-A)
1.2.6 IRS Eductor Secondary Air Inlet Trunk (01-378-2-Q)
1.2.7 Deck Gear Locker (02-370-1-A)
1.3 Identification:
1.3.1 Quantity (One Lot), Fastener of AFT Vertical Launching System (VLS) Drain Trough Cover Plate in 02 Level Weather, Frames between 338 and 370, Port and Stbd
1.3.1.1 Quantity (67 EA), Screw
Material: CRES 316, 5/16-18UNC-2A, x 3/4 Inch Length, Truss Head Remarks: See Sheet 3B-12 Detail 3B-1F, 3B-5F, and 3B-7G, and Sheet 3C of 2.3 for detail.
1.3.1.2 Quantity (67 EA), Washer
Material: CRES 316 Size: 0.875 Inch Outside Diameter x 0.344 Inch Inside Diameter x 0.063 Inch Thickness Remarks: See Sheet 3B-12 Detail 3B-1F, 3B-5F, and 3B-7G, and Sheet 3C of 2.3 for detail.
1.3.1.3 Quantity (73 EA), Screw
Material: CRES 316, 3/8-16UNC-2A, x 5/8 Inch Length, Flat Head Remarks: See Sheet 3B-12 Detail 3B-2F, 3B-5F, and 3B-7G, and Sheet 3C of 2.3 for detail.
1.3.2 Quantity (One Lot), Toggle Pin for Lifeline Stanchion Assembly, including wire rope and compression ferrule in 02 Level Weather, Frames between 255 and 396, Port and Stbd
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.3.2.1 Quantity (30 EA), Toggle Pin for Stanchion Brace and Brace Clip, including wire rope and compression ferrule
Remarks: See Sheet 7C1 Detail 7C1-C of 2.4 for detail.
1.3.2.2 Quantity (30 EA), Toggle Pin for Stanchion Brace and Stanchion, including wire rope and compression ferrule
Remarks: See Sheet 7C1 Detail 7C1-C of 2.4 for detail.
1.3.2.3 Quantity (47 EA), Toggle Pin for Stanchion and Stanchion Base, including wire rope and compression ferrule
Remarks: See Sheet 6B1 Detail 6B1-F, Sheet 6B2 Detail 6B2-F, and Sheet 8N1 Detail 8N1-D of 2.4 for detail.
1.3.2.4 Quantity (31 EA), Toggle Pin for Hinge Base, including wire rope and compression ferrule
Remarks: See Sheet 6E5 Detail 6E5-C of 2.4 for detail.
1.3.3 Quantity (14 EA), Toggle Pin for Stanchion and Stanchion Base, including wire rope and compression ferrule in 02 1/2 Level Weather, Frames between 370 and 386, Port and Stbd
Remarks: See Sheet 6B1 Detail 6B1-F of 2.4 for detail.
1.3.4 Quantity (35 AY), Bonding Strap Assembly for Lifeline Stanchion in 02 1/2 Level Weather, Frames between 370 and 386, Port and Stbd
Attachment Method: Method 3 of Figure 11 of 2.6, Welded Material: CRES 316L Weld Joint Design: PT1S.1 of MIL-STD-22D Fillet Weld Size: 1/8 Inch Remarks: See 2.5 for detail.
1.3.5 Quantity (One Lot), Toggle Pin of Lifeline Stanchion Assembly in 02 Level Weather, Frames between 265 and 396, Port and Stbd
1.3.5.1 Quantity (3 EA), Toggle Pin for Stanchion and Stanchion Base
Remarks: See Sheet 6B1 Detail 6B1-F and Sheet 8N1 Detail 8N1-D of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
1.3.5.2 Quantity (One EA), Toggle Pin for Brace and Brace Clip
Remarks: See Sheet 7C1 Detail 7C1-C of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
1.3.5.3 Quantity (One EA), Toggle Pin for Brace and Stanchion
Remarks: See Sheet 7C1 Detail 7C1-C of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
1.3.5.4 Quantity (5 EA), Toggle Pin for Hinge Base
Remarks: See Sheet 6E5 Detail 6E5-C of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.3.6 Quantity (One Lot), Toggle Pin for Lifeline Stanchion Assembly, including wire rope and compression ferrule in 02 1/2 Level Weather, Frames between 370 and 386, Port and Stbd
1.3.6.1 Quantity (3 EA), Toggle Pin for Stanchion and Stanchion Base, including wire rope and compression ferrule
Remarks: See Sheet 6B1 Detail 6B1-F of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
1.3.6.2 Quantity (9 EA), Toggle Pin for Brace and Brace Clip, including wire rope and compression ferrule
Remarks: See Sheet 7C1 Detail 7C1-C of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
1.3.6.3 Quantity (9 EA), Toggle Pin for Brace and Stanchion, including wire rope and compression ferrule
Remarks: See Sheet 7C1 Detail 7C1-C of 2.4 for material and detail, and Sketch Enclosure-01 for location detail.
1.3.7 Quantity (50 EA), Lifeline Stanchion, 02 Level Weather, Frames between 255 and 396, Port and Stbd
Material: CRES
1.3.7.1 Quantity (31 EA), Stanchion Brace, 02 Level Weather, Frames between 255 and 396, Port and Stbd
Material: CRES
1.3.8 Quantity (17 EA), Lifeline Stanchion, 02 1/2 Level Weather, Frames between 370 and 386, Port and Stbd
Material: CRES
1.3.8.1 Quantity (9 EA), Stanchion Brace, 02 1/2 Level Weather, Frames between 370 and 386, Port and Stbd
Material: CRES
1.3.9 Quantity (5,400 SF), 02 Level Deck Plating, Frames between 242 and 396, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port and Stbd
Remarks: The area excepts exterior surface of vertical launching system and where rubber tile is installed.
1.3.10 Quantity (35 SF), Top Surface of Step Platform for Close-In Weapon System, 54 Feet 4 Inches ABL, Frames between 316 and 320, including vertical surface up to height of 4 inches from deck in and around nonskid deck area Port and Stbd
1.3.11 Quantity (300 SF), Top Surface of Stack, 02 1/2 Level Deck Plating, Frames between 370 and 386, including vertical surface up to height of 4 inches from deck in and around nonskid deck area Port and Stbd
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
Kouichi.Yoshida.ja Typewritten Text 8/10/2026
Kouichi.Yoshida.ja Typewritten Text 9/4/2026
FOUO
SHIP: DDG-115 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 DWG 100-
7026702
DDG-51 CLASS UNIT STRL ARR
DWG ASSY UNIT3250
M Y 3B 12, 3C
4 DWG 612-
6567058
DDG51 CLASS LIFELINES RAILS
STANCHIONS, AND FAB INSTL
OF EXTERIOR
AD Y SE
E N
OT
E
5 DWG 407-
8602224
Topside Electromagnetic Control Measures Ship Specific drawing for
USS RAFAEL PE
- Y 11 2, B2
6 MIL MIL-
STD-1310
Shipboard Bonding, Grounding, and Other Techniques for EMP Mitigation and Safety
H N
7 DWG 100-
7027658
UNIT STRUCTURAL ARR DWG-
ASSY UNIT 3270
D Y 3-5
8 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Remove existing and install new each fastener listed in 1.3.1 in accordance with 2.3.
5.1.1 Clean, chase, or tap exposed threaded areas.
5.2 Remove each existing toggle pin listed in 1.3.2 and 1.3.3, using 2.4 for guidance.
5.3 Remove existing and install new each bonding strap assembly listed in 1.3.4 in accordance with 2.5 and 2.6, using 2.4 and 2.7 for guidance.
5.3.1 Drill hole(s) on existing stanchion brace of the stanchion assembly for gas free inspection.
5.3.2 Accomplish build up weld of remaining hole(s) on the stanchion brace of the stanchion assembly.
5.3.3 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) D, Lines One through 7.
5.4 Install each toggle pin listed in 1.3.2, 1.3.3, 1.3.5, and 1.3.6 in accordance with 2.4.
5.5 Accomplish the requirements of 009-032 of 2.1, including Table 5, Line(s) 23, for each equipment listed in 1.3.7 and 1.3.8.
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja Typewritten Text
1/26/2026 C1209.2 K. YOSHIDA
FOUO
SHIP: DDG-115 CHG/VER: 0/0
5.6 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 21, for each area listed in 1.3.9 through 1.3.11. Application of nonskid system must conform to MIL-PRF-24667, Type V, Composition G.
5.6.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.8.
5.7 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.8 Notes:
5.8.1 Planner: Code 231B M. Maeda, 243-6101
Code 231B R. Tsuruoka, 243-9982
5.8.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
5.8.3 WPC will copy the following pages in reference.
REF. 2.4: Pages 1D, 5F1, 6A1, 6B1, 6C1, 7A1, 7B1, 7C1, 7H1, 7W1, 4E4-21, 7AH, 4H1-25, 4E1-30, 4E2-30, 4E3- 30, 4E6-30, 4K1-30, 4L1-30, 4W2-30, 6A2, 6B2, 6C2, 6E2, 7B2, 6E4, 6E5, 4W1-34, and 8N1
5.8.4 JCNs OD01-0658 and OD01-L075 are related to this TGI.
5.9 Government Furnished Material (GFM):
5.9.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.10 SRF-JRMC will provide the following service work: (TGI No. 38K6113701S02).
5.10.1 [C740] Crane and crane rigging service.
5.10.2 [X99E] Utility service, electrical.
5.10.3 [X99M] Utility service, including water supply, steam supply, and low air pressure supply except onboard blasting work.
5.10.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.10.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.10.6 [C133] QA inspection for (G) symbol(s).
5.10.7 [C294] Work scope review and verification for VLS relating work prior to commencement of the work.
FOUO
M-1
SHIP: DDG-115 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
02 WEATHER AY A 0 0
CU PHASE TITLE:
F/O - ACCOMPLISH REPLT OF NONSKID SYS, PSVTN OF STAN, & INSTL OF EQPT ON 02 LVL
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6113701 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M ROPE,WIRE, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 4010 015720869 NA 4 N 53175415 200/FT
002 M SWAGING, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 4030 010882952 NA 4 N 53175412
400/EA
003 M PIN, TOG, TOGGLE PIN, DIA:
5/8”, GRIP LG: 1-1/8”, TOGGLE
END TYPE: FLAT, PIN MATL:
CRES 316, TOGGLE END
MATL: CRES 316, BIW CAT NO.
54055-323, ORIG: C231B, R. TSURUOKA,
243-9982
ORDERED FOR KTR
9Z 5315 LL9301811 NA 4 N 53177474 30/EA
NOTES:
FOUO
M-2
SHIP: DDG-115 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
004 M TOGGLE PIN, TOGGLE PIN,
WITHOUT CLIP & RETAINING
CABLE, DWG: 803-2258314
REV.B MOD, DIA: 1/2”, GRIP
LG: 2-1/2”, TOGGLE END TYPE:
FLAT, PIN MATL: CRES 316,
TOGGLE END MATL: CRES
316, BIW CAT NO. 54055-293,
ORIG: C231B, R. TSURUOKA,
243-9982
ORDERED FOR KTR
LL4713114 NA 4 N 10/EA
005 M TOGGLE P, TOGGLE PIN,
WITHOUT CLIP & RETAINING
CABLE, DWG: 803-2258314
REV.B MOD, DIA: 1/2”, GRIP
LG: 2-5/8”, TOGGLE END TYPE:
FLAT, PIN MATL: CRES 316,
TOGGLE END MATL: CRES
316, ORIG: C231B, R. TSURUOKA,
243-9982
ORDERED FOR KTR
9Z 5315 LL9301826 NA 4 N 53177475 10/EA
006 M STRIP,EL, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 5999 013438667 NA 4 N 40/EA
007 M SCREW,CA, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 5305 014535741 NA 4 N 80/EA
008 M NUT,SLEE, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 5310 014231667 NA 4 N 80/EA
009 M SCREW, TRUSS HEAD, S,
SCREW, TRUSS HEAD,
SLOTTED, SIZE: 5/16"-18UNC-
2A X 3/4" LENGTH, MATL:
CRES 316,FF-S-92B TYPE I
STYLE 7S,TRUSS HEAD
SLOTTED
ORIG: C231B, R. TSURUOKA,
243-9982
ORDERED FOR KTR
LL4694513 NA 4 N 75/EA
010 M WASHER, 7/8"OD X 11/,
WASHER, SIZE; 7/8"(0.875")OD
X 11/32"(0.343")ID X
1/16"(0.0625") THK, BOLT SIZE:
5/16", MATL: CRES 316. FF-W-
92 TY A GR I CL B, ASME
B18.21.1, BIW CAT# 53239-081.
ORIG: C231B, R. TSURUOKA,
243-9982
ORDERED FOR KTR
LL9304042 NA 4 N 75/EA
011 M SCREW, FLAT, SELFLOC,
SCREW, FLAT, SELFLOCK,
SPEC: FF-S-92 TYPE 1 STYLE
2S & MOD, HEAD: 82 DEGREES
FLAT COUNTERSUNK,
SLOTTED, SIZE: 3/8"-16UNC-2A
X 5/8" LG, MATL: CRES 316,
LOCKING ELEMENT: MIL-DTL-
18240 TYPE P,
ORIG: C231B, R. TSURUOKA,
243-9982
ORDERED FOR KTR
LL9301068 NA 4 N 80/EA
012 M INSULATI, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9Q 5640 013713263 NA 4 N 53175403 4/SH
FOUO
M-3
SHIP: DDG-115 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
013 M INSULATI, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9Q 5640 013713262 NA 4 N 53175395 6/SH
014 M TAPE,TEX, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 8315 002671632 NA 4 N 53175276 1/RO
015 M TAPE,TEX, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 8315 002671633 NA 4 N 53175280 1/RO
016 M ADHESIVE, ORIG: C231B, R.
TSURUOKA, 243-9982
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 53175283 1/GL
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 02 WEATHER AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6113701 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 02 WEATHER AY A 0
SHEET 1 OF 438K6113701A01
SKETCH
ENCLOSURE-01
PLAN VIEW 1-A
02 LVL WEA DECK, FR 240 – 322,
PORT & STBD
Location Detail for Installation of Toggle Pin for Liferail Stanchion in 02 Level Weather, Frame 240 - 396, Port & Starboard
FWD
Stanchion & Stanchion Base (Detail 4-B) Brace & Brace Clip (Detail 4-A)
Brace & Stanchion (Detail 4-A)
Stanchion & Stanchion Base (Detail 4-B)
SHEET 2 OF 438K6113701A01
ENCLOSURE-01
PLAN VIEW 1-A
03 LVL DECK, FR 161 – 181 PORT
FWD
PLAN VIEW 2-A
02 LVL WEA DECK, FR 322 – 396
PORT & STBD
Stanchion & Stanchion Base (Detail 4-C)Hinge Base (Detail 4-D)
Hinge Base (Detail 4-D)
Hinge Base (Detail 4-D)
Hinge Base (Detail 4-D) Hinge Base (Detail 4-D)
SHEET 3 OF 438K6113701A01
ENCLOSURE-01
PLAN VIEW 3-A
02 1/2 LVL DECK, FR 370 - 386,
PORT & STBD
FWD
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A) Stanchion Base & Stanchion (Detail 4-E)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A) Stanchion Base & Stanchion (Detail 4-E)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
Stanchion Base & Stanchion (Detail 4-E)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
Brace & Stanchion (Detail 4-A) Brace & Brace Clip (Detail 4-A)
DETAIL 4-A
Toggle Pin of Brace to Brace Clip
& Stanchion
SHEET 4 OF 438K6113701A01
SKETCH
ENCLOSURE-01
DETAIL 4-B
Toggle Pin of Stanchion Base to Stanchion
DETAIL 4-C
Toggle Pin of Stanchion Base to Stanchion
DETAIL 4-D
Toggle Pin of Hinge Base
DETAIL 4-E
Toggle Pin of Stanchion Base to Stanchion
File details come from the government source that posted it. Updated .