This document is a Task Group Instruction (TGI) for repairing a gouge on bulkhead plating on the USS Blue Ridge (LCC-19), specifically located in Frame 86 of compartment 6-86-1-A. The repair work involves welding the damaged bulkhead plating, with the base material being OS, MIL-S-22698 Grade A, 15.3 LBs Plate. The contractor work is scheduled to start on 1/12/2026 and is expected to be completed by 5/15/2027.
The TGI provides detailed instructions for the repair, including accomplishing weld repair using specific reference guidelines, addressing potential lead hazards, and specifying service work to be provided by SRF-JRMC. This includes crane and rigging services, utility services (electrical, low pressure air, water, and steam), and safety and quality assurance inspections. The document is part of a larger naval maintenance package for the USS Blue Ridge at Commander, Fleet Activities Yokosuka (CFAY) Naval Base in Japan.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
19-AUG-2024 1637
20.14.12.0.8874 (April 2024) ICN: 3819P14114 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 6-86-1-A MS A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: *F/O - REPAIR GOUGE ON BULKHEAD PLATING FR 86 IN 6-86-1-A
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
ES01NPL1
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ANDO, TOMOHIKO 231B 3152434372 27-APR-2024
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 27-APR-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NPL1
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 6-86-1-A 6 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
141A0014
1. SCOPE/PURPOSE:
1.1 Title: Gouge on Bulkhead Plating Frame 86 in 6-86-1-A; repair
1.2 Location of Work:
1.2.1 Self Service Storeroom (6-86-1-A)
1.2.2 Fire Room Storeroom (6-76-1-A)
1.2.3 Fresh Water Ballast Tank (9-86-5-W)
1.3 Identification:
1.3.1 Quantity (One Lot), Bulkhead Plating in 6-86-1-A, Frame 86, Starborad
Base Material: OS, MIL-S-22698 Grade A, 15.3 LBs Plate
TGI Short Form
19-AUG-2024 1637
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14114 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 6-86-1-A MS A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: *F/O - REPAIR GOUGE ON BULKHEAD PLATING FR 86 IN 6-86-1-A
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
Remarks: See Sketch Enclosure-01 for location detail
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Lead Hazard
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 5/15/2027
2. PROCEDURE:
2.1 Accomplish weld repair of gouge on each existing bulkhead plating listed in 1.3.1, using Ref. No. 3 for guidance.
2.1.1 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.
2.2 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.
2.3 Notes:
2.3.1 Planner: Code 231B T. Ando, 243-4372
Engineer: Code 250 J. Igarashi, 243-4230
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 Opening, initial cleaning, and closing of each space listed in 1.2.3 will be covered by TGI No. 3819P12343A01 (KTR TGI).
2.3.4 This TGI clears DFS LCC-19-1018-2024 in its entirety.
2.3.5 JCN ES01-NPL1 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 3819P14114S02).
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbol(s).
19-AUG-2024 1637
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14114 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 6-86-1-A MS A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: *F/O - REPAIR GOUGE ON BULKHEAD PLATING FR 86 IN 6-86-1-A
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
19-AUG-2024 1637
20.14.12.0.8874 (April 2024) (Continued) ICN: 3819P14114 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 6-86-1-A MS A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 13500
CU PHASE TITLE: *F/O - REPAIR GOUGE ON BULKHEAD PLATING FR 86 IN 6-86-1-A
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 114-2491157 TRANSV BHD FR 76 & 86 N Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1 WELD HRs, PNTR HRs, QA HRs 22/KE PC N
2.2 PNTR HRs, QA HRs 22/KE PC N
Structure Work CFM for all paints, thinner, firewatch cost, tank watch cost, marine chemist, lead sampling/analysis cost, and misc such as electrode, temporary covering material, and other consumable.
22/MQ CS N
Process Funding Document. 10/CT OM N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 3819P14114A01-Sketch.pdf 13-APR-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14114 KEY OP: A01
KEY PLAN
FR 76 - 98
LOCATION OF WORK
SKETCH
ENCLOSURE-01
SEE SHEET 2 & 3
3819P14114A01 Sheet 1 of 5
SKETCH
ENCLOSURE-01
SELF SERVICE STOEROOM
(6-86-1-A)
See Detail 4-A See Detail 4-B
See Detail 4-D
See Detail 4-C
3819P14114A01 Sheet 2 of 5
See Detail 4-E See Detail 4-F
See Detail 5-A See Detail 5-B
See Detail 4-G
See Detail 4-H
SELF SERVICE STOEROOM
(6-86-1-A)
See Detail 5-D See Detail 5-C
See Detail 5-E
3819P14114A01 Sheet 3 of 5
Detail 4-A Detail 4-B Detail 4-C Detail 4-D
Detail 4-E Detail 4-GDetail 4-F Detail 4-H
3819P14114A01 Sheet 4 of 5
Detail 5-A Detail 5-B Detail 5-C
Detail 5-D Detail 5-E
3819P14114A01 Sheet 5 of 5