TGI_3819P14113A01_c0v0.pdf

PDF 2 MB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA TYCOM 3 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA024
Issued by

About this file

This Task Group Instruction (TGI) details repair and preservation work for deck plating on the USS Blue Ridge (LCC-19), specifically focusing on two areas: the Fifth Deck in 6-76-2-A (Frames between 81 and 82, Port) and the First Platform in 6-76-2-A. The work involves weld repair of mechanical damage, including drilling 1/2-inch holes, countersinking, conducting air hose tests, and performing preservation tasks on new and disturbed surfaces.

The project is scheduled for contractor work from January 12, 2026, to May 15, 2027, with the Naval Ship Repair Facility-Japan Regional Maintenance Center (SRF-JRMC) providing support services including crane rigging, utility services, safety inspections, and on-site engineering support for weld repair. The work requires special attention to fire zone boundaries, necessitating the fabrication and staging of a non-flammable closure. The total work area comprises approximately one lot of deck plating on the Fifth Deck and 414 square feet on the First Platform, with potential lead hazards noted in the initial conditions.

View the file

Other files

File Type Posted
EXHIBIT - Contract Data Requirements List (CDRL)_R2.pdf PDF
TGI_3819P25502_A01_c0v0_FY26.pdf PDF
TGI_3819P22102_A01_c0v0_FY26.pdf PDF
TGI_3819P22101_A01_c0v0_FY26.pdf PDF
TGI_3819P14207_A01_c1v2_FY26.pdf PDF
TGI_3819P14205A01_c2v2_FY26.pdf PDF
TGI_3819P14116A01_c0v0_FY26.pdf PDF
TGI_3819P14114A01_c0v0_FY26.pdf PDF
TGI_3819P14113A01_c0v0_FY26.pdf PDF
TGI_3819P13505A01_c0v0_FY26.pdf PDF
TGI_3819P13411A01_c1v1_FY26.pdf PDF
TGI_3819P13339A01_c0v0_FY26.pdf PDF
TGI_3819P12352A01_c1v0_FY26.pdf PDF
TGI_3819P12350A01_c0v0_FY26.pdf PDF
TGI_3819P12347_A01_c0v0_FY26.pdf PDF
TGI_3819P12346_A01_c0v0_FY26.pdf PDF
TGI_3819P12343A01_c1v1_FY26.pdf PDF
TGI_3819P12329A01_c1v1_FY26.pdf PDF
TGI_3819P12326_A01_c1v0_FY26.pdf PDF
TGI_3819P12325_A01_c0v01_FY26.pdf PDF
TGI_3819P12308A01_c0v0_FY26.pdf PDF
TGI_3819P12307A01_c0v0_FY26.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P23103_A03_c0v0.pdf PDF
TGI_3819P22102_T01_c0v0.pdf PDF
TGI_3819P14208T01_c0v0.pdf PDF
TGI_3819P14208A01_c1v1.pdf PDF
TGI_3819P14122A01_c0v0.pdf PDF
TGI_3819P14121A01_c0v0.pdf PDF
TGI_3819P13422A01_c0v0.pdf PDF
TGI_3819P13411A01_c1v1.pdf PDF
TGI_3819P12351A01_c0v0.pdf PDF
TGI_3819P12350A01_c0v0.pdf PDF
TGI_3819P12347_A01_c0v0.pdf PDF
TGI_3819P12345_A01_c1v3.pdf PDF
TGI_3819P12332A01_c1v1.pdf PDF
TGI_3819P12327_A01_c1v1.pdf PDF
TGI_3819P12324_A01_c2v1.pdf PDF
TGI_3819P12313A01_c0v0.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment II Price Proposal Form N6264925RA024.xlsx XLSX spreadsheet
TGI_3819P25502_A01_c0v0.pdf PDF
TGI_3819P22101_T09_c0v0.pdf PDF
TGI_3819P14208T02_c0v0.pdf PDF
TGI_3819P14204A01_c0v0.pdf PDF
TGI_3819P13507A01_c0v0.pdf PDF
TGI_3819P13505A01_c0v0.pdf PDF
TGI_3819P12389A01_c0v0.pdf PDF
TGI_3819P12360A01_c0v0.pdf PDF
TGI_3819P12359_A01_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

24-AUG-2024 0828

20.14.15.0.8993 (August 2024) ICN: 3819P14113 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DK PLTG IN 6-76-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - ACCOMPLISH REPAIR & PRESERVATION OF DECK PLATING IN 6-76-2-A

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01NPJC * ES01NPJD

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ASHINA, TAKAAKI 231B 3152434370 16-APR-2024

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 16-APR-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NPJC * ES01-NPJD

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

141A0013

1. SCOPE/PURPOSE:

1.1 Title: Repair and Preservation of Deck Plating in 6-76-2-A; accomplish

1.2 Location of Work:

1.2.1 B Division Storeroom (6-76-2-A)

1.2.2 ER09 Office (5-79-2-Q)

1.3 Identification:

1.3.1 Quantity (One Lot), Deck Plating, Fifth Deck in 6-76-2-A, Frames between 81 and 82, Port

Base Material: OS, MIL-S-22698 GR-A, 12.75 LBs Plate Remarks: See Sketch Enclosure-01 for location detail

JCN: ES01-NPJD

TGI Short Form

24-AUG-2024 0828

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P14113 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DK PLTG IN 6-76-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - ACCOMPLISH REPAIR & PRESERVATION OF DECK PLATING IN 6-76-2-A

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (414 SF), Entire Deck Plating, First Platform in 6-76-2-A, including vertical surface up to height of 6 inches from deck and manhole cover plates and air vent hose connection (AVHC) cover plate, Port

Remarks: The area excepts where compartment insulation is installed.

JCN: ES01-NPJC

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Lead Hazard

1.6 Contractor Work start date: 1/12/2026

1.7 Contractor Work completion date: 5/15/2027

2. PROCEDURE:

2.1 Accomplish weld repair of mechanical damage on each existing deck plating listed in 1.3.1, using Ref. No. 3 for guidance.

See 2.6.7.

2.1.1 Drill 1/2 inch diameter hole on each deck plating.

2.1.1.1 Shape remaining hole to minimum 20 degrees countersink.

2.1.2 Accomplish the requirements of 009-12 of Ref. No. One, including Table 2, Column(s) A, Lines One through 7.

2.1.3 Accomplish the requirements of 009-25 of Ref. No. One for a local air hose test of each new weld of the deck plating.

Allowable leakage: None.

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, for each area listed in 1.3.2.

2.3 Accomplish the requirements of 009-32 of Ref. No. One for each new and disturbed surface.

2.4 Notes:

2.4.1 Planner: Code 231B T. Ashina, 243-4370

Engineer: Code 250 J. Igarashi, 243-4230

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 This TGI clears DFS LCC-19-1017-2024 in its entirety.

2.4.4 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper

24-AUG-2024 0828

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P14113 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DK PLTG IN 6-76-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - ACCOMPLISH REPAIR & PRESERVATION OF DECK PLATING IN 6-76-2-A

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

air flow onboard the ship.

2.4.5 JCNs ES01-NPJC and ES01-NPJD are related to this TGI.

2.5 Government Furnished Material (GFM): None.

2.6 SRF-JRMC will provide the following service work: (TGI No. 3819P14113S02)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service, electrical.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA inspection for (G) symbol(s).

2.6.7 [C250] On-site engineering support for weld repair.

24-AUG-2024 0828

20.14.15.0.8993 (August 2024) (Continued) ICN: 3819P14113 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: DK PLTG IN 6-76-2-A AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE: F/O - ACCOMPLISH REPAIR & PRESERVATION OF DECK PLATING IN 6-76-2-A

FOUO Pg 4 of 4

OTHER SPECIAL REQUIREMENTS:

This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N 3 DWG 104-2491048 5th Deck PLTG FR51-1/2 -

FR102-1/4

M Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

2.1 SFTR HRs, WELD HRs, PNTR HRs, RGRS HRs, CARP HRs, QA HRs

22/KE PC N

2.2 PNTR HRs, SMTL HRs, SFTR HRs, QA HRs 22/KE PC N

2.3 PNTR HRs, QA HRs 22/KE PC N

Structure Work CFM: $ for firewatch cost, air compressor rental cost and fuel oil cost for air hose test, and misc such as electrode, covering materials, gases, and other consumable.

22/MQ CS N

Preservation Work CFM: $ for all paints, thinner, lead analysis cost, slip-resistant self adhesive tread, and misc such as covering material, temporary closure, and other consumable.

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 3819P14113A01-Sketch.pdf 15-APR-2024 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P14113 KEY OP: A01

Takaaki.Ashina.ja Text Box

LOCATION DETAIL FOR WELD REPAIR

Takaaki.Ashina.ja_1 Text Box

Takaaki.Ashina.ja_2 Text Box

PLAN VIEW

FIRST PLATFORM FR 76 - 86

PORT

Takaaki.Ashina.ja_3 Line

Takaaki.Ashina.ja_4 Text Box 3819P14113A01

Takaaki.Ashina.ja_5 Line

Takaaki.Ashina.ja_6 Text Box

SKETCH

ENCLOSURE-01

Takaaki.Ashina.ja_7 Text Box Sheet 1 of 1

Takaaki.Ashina.ja_8 Line

Takaaki.Ashina.ja_9 Line

Takaaki.Ashina.ja_10 Text Box

FR 83

Takaaki.Ashina.ja_11 Text Box

FR 79

Takaaki.Ashina.ja_12 Text Box

FR 76

Takaaki.Ashina.ja_13 Text Box

FR 86

Takaaki.Ashina.ja_14 Line

Takaaki.Ashina.ja_15 Text Box

FWD

Takaaki.Ashina.ja_16 Text Box

LONG BHD

Takaaki.Ashina.ja_17 Text Box

SHELL

Takaaki.Ashina.ja_18 Line

Takaaki.Ashina.ja_19 Rectangle

Takaaki.Ashina.ja_20 Text Box 6'-3"

Takaaki.Ashina.ja_21 Line

Takaaki.Ashina.ja_22 Text Box 28"

Takaaki.Ashina.ja_23 Text Box

DETAIL 1-B

Takaaki.Ashina.ja_24 Line

Takaaki.Ashina.ja_25 Rectangle

Takaaki.Ashina.ja_26 Text Box

B DIVISION STOREROOM (6-76-2-A)

Takaaki.Ashina.ja_27 Text Box

TRANSV BHD

Takaaki.Ashina.ja_28 Text Box

TRANSV BHD

Takaaki.Ashina.ja_29 Text Box

:MECHANICAL DAMAGE

Takaaki.Ashina.ja_30 Rectangle

Takaaki.Ashina.ja_31 Line

Takaaki.Ashina.ja_32 Line

Takaaki.Ashina.ja_33 Text Box

FIRE ROOM (8-76-0-E)

Takaaki.Ashina.ja_34 Line

Takaaki.Ashina.ja_35 Text Box

DETAIL 1-B

INVERTED VIEW

FIFTH DECK PLATING IN 6-76-2-A

Takaaki.Ashina.ja_36 Line

Takaaki.Ashina.ja_37 Oval

Takaaki.Ashina.ja_38 Text Box

MECHANICAL DAMAGE

Takaaki.Ashina.ja_39 Line

Takaaki.Ashina.ja_40 Text Box

FWD

Takaaki.Ashina.ja_41 Line

Takaaki.Ashina.ja_42 Text Box

:MECHANICAL DAMAGE

Takaaki.Ashina.ja_43 Oval

Takaaki.Ashina.ja_44 Rectangle

Takaaki.Ashina.ja_45 Line

File details come from the government source that posted it. Updated .