TE SW25 SWM systems map.pptx

PPTX presentation 5 MB Posted

Attached to
Base Operations Support Services, Rivanna Station, Virginia
Solicitation number
W5168W-26-R-A016
Issued by

About this file

The file is a PowerPoint presentation (TE SW25 SWM systems map.pptx) detailing maintenance requirements for a dam and surrounding infrastructure. The maintenance specifications include keeping a 25-foot embankment tree-free, fertilizing the area every three years, and conducting regular inspections of critical components such as the spillway, riser, and forebays. Specific maintenance tasks involve annual spillway inspections, post-storm event assessments, vegetation management, and debris removal from forebays every 3-5 years or when sediment accumulates to 6-12 inches.

The document is related to a Department of the Army solicitation (W5168W-26-R-A016) for Base Operations Support Services at Rivanna Station, Virginia. While the PowerPoint appears to be a technical specification for dam maintenance, it is linked to a broader base operations support services contract. The presentation includes three images (image1.png, image2.png, image3.png) that likely provide visual context for the maintenance requirements and site layout.

View the file

Other files

File Type Posted
TE 28 Fort Belvoir Policy Memorandum 31 Excavation Work Permit Requirements.pdf PDF
TE 40 Dumpsters.pdf PDF
TE 12 Spill Prevention Plan for RS outdated.pdf PDF
TE 14 Hard Stand Map.pdf PDF
TE cdc dispensor.jpg JPG image
Attachment P - Past Performance Questionnaire.docx DOCX document
Attachment D4 - Annex G Snow and Ice Removal.docx DOCX document
TE BackflowPreventors.docx DOCX document
Attachment O - Staffing Matrix.xlsx XLSX spreadsheet
TE 55 - Generator list.docx DOCX document
TE 41 Dumpster Info.docx DOCX document
TE WASTE.xlsx XLSX spreadsheet
TE 30 Fort Belvoir Policy Memorandum 27 Tree Removal and Protection.pdf PDF
TE DIG1 Fort Belvoir Excavation Permit.doc DOC document
TE MAP1.pdf PDF
TE BS1 BASOPS Inventory list revised.xlsx XLSX spreadsheet
Attachment E - PIEE Solicitation Vendor Posting Offer Training.pdf PDF
Attachment D1 - Annex E Solid-Waste-Management.docx DOCX document
TE EN1 Asbestos.doc DOC document
TE BS2-Rivanna Station - Master Inventory and PM Schedule - 11-20-2018.xlsx XLSX spreadsheet
Attachment J1 - Service Contract Act WD 15-4281.pdf PDF
TE 2 Form 21.docx DOCX document
TE 32. Intergrated Pest Management Policy.pdf PDF
TE CDCProducts.xlsx XLSX spreadsheet
TE BS3 - RIVANNA STATION Building list.docx DOCX document
Attachment P1 - Sample Consent Letter for Release of Past Performance Info.docx DOCX document
Attachment D - Annex-D Custodial Services.docx DOCX document
TE Lift Stations.docx DOCX document
TE FM1 Flower Tree and Mulch Areas.xlsx XLSX spreadsheet
TE 50 - ARMY_BUILDER_SMS-Manual_20190601.pdf PDF
Attachment N2 - DB Highway VA20250116.pdf PDF
Attachment N1 - DB Heavy VA20250197.pdf PDF
TE SWMS.pdf PDF
TE GFEBS.pdf PDF
TE CUT.pdf PDF
TE PWOLOG.xlsx XLSX spreadsheet
Attachment T2 - Base Access Instructions.pdf PDF
Attachment A - Annex A Overarching PWS.docx DOCX document
Attachment F - Annex M Pest Management.docx DOCX document
Attachment D7 - Annex-J Surfaced and Unsurfaced Areas.docx DOCX document
TE DELV.docx DOCX document
TE Genset Tanks.docx DOCX document
TE CODES.docx DOCX document
Attachment Q1- Industry Questions Template.xlsx XLSX spreadsheet
Attachment T1 - Form 21 Site Visit.xlsx XLSX spreadsheet
TE BF1 Backflow Device List.xlsx XLSX spreadsheet
Attachment G - Government Furnished Property.pdf PDF
Attachment P2 - Specific Relevant Contracts Reference Sheet.docx DOCX document
Attachment H - Pricing Matrix Redacted.xlsx XLSX spreadsheet
Solicitation - W5168W26RA016.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Maintain dam Tree-free Maintain dam & within 25 of embankment tree free at all times. Area is to be fertilized once every three years.

Maintain riprap Plunge pool and oufall Inspect the spillway annually & after any storm event that engages the spill way.

Keep spillway clear of vegetation that would impede water flow & maintain riprap Inspect riser every 6 months for deterioration and debries removal.

Forebays: remove debris and soil from forebays every 3-5 years or if more than 6-12 inches have accumulated, which ever comes first.

Inspect them after rain events that exceed 0.5 inches.

The two areas: utility crossing and area under the footbridge can be maintained. However, the remainder of the stream system must remain natural.

Trees around the pond that exceed the security height requirements may be selectively removed.

image1.png image2.png image3.png

File details come from the government source that posted it. Updated .