This document is a bid amendment for Bid Solicitation #20DPP00471 T1628 - Enhanced Motor Vehicle Inspection Maintenance System, issued by the New Jersey Department of the Treasury Division of Purchase and Property Procurement Bureau. The bid amendment provides answers to questions submitted by vendors during the second round of the electronic question and answer period, announces a revised quote submission due date of June 11, 2021, and includes revised versions of the bid solicitation, price sheet, and appendix. The contract is for an enhanced motor vehicle inspection maintenance system for the State of New Jersey.
Regarding pricing, the vendor shall be solely responsible for all work and costs associated with capital maintenance, repairs, and renovations deemed necessary by the State at the central inspection facilities (CIFs) and satellite inspection facilities (SIFs). These costs are not reimbursable by the State and should be factored into the inspection transaction fee pricing. The State has provided estimated annual capital repair costs for the SIF locations, which vendors should use in their pricing.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHILIP D. MURPHY
Governor State of New Jersey
DEPARTMENT OF THE TREASURY
DIVISION OF PURCHASE AND PROPERTY
PROCUREMENT BUREAU
33 WEST STATE STREET
P. O. BOX 230
TRENTON, NEW JERSEY 08625-0230
ELIZABETH MAHER MUOIO
State Treasurer
SHEILA Y. OLIVER
Lt. Governor
MAURICE A. GRIFFIN
Acting Director https://www.njstart.gov
March 1, 2021
To: All Interested Vendors {Bidders}
Re: Bid Solicitation #20DPP00471 T1628 – Enhanced Motor Vehicle Inspection Maintenance System
| Revised Quote Submission Due Date: February 26, 2021 (2:00 p.m. EST) |
| NEW REVISED QUOTE SUBMISSION DUE DATE: June 11, 2021 (p.m. EST) |
Bid Amendment #14
The following constitutes Bid Amendment #14 to the above referenced Bid Solicitation:
· Answers to the remaining questions submitted electronically by Vendors {Bidders} during the 2nd round of Electronic Question and Answer period;
· Notice to all Vendors {Bidders} that questions may be submitted in response to the answers contained with this Bid Amendment, as well as those contained within Bid Amendment #9 until March 12, 2021 at 2:00PM EST;
· A revised version of the Bid Solicitation uploaded as T1628 Revised Bid Solicitation 03/01/2021;
· A revised version of the Price Sheet uploaded as T1628 Revised Price Sheet 03/01/2021; and
· A revised version of the Appendix 3.2H uploaded as T1628 Revised Appendix 3.2H 03/01/2021.
Please note that for all additions, deletions, clarifications and modifications to the State-Supplied Price Sheet and Bid Solicitation, please refer to T1628 Revised Bid Solicitation 03/01/2021. Failure to submit a technical and price Quote in response to the revised documents may render the Vendor {Bidder} non-responsive.
It is the sole responsibility of the Vendor {Bidder} to be knowledgeable of all of the additions, deletions, clarifications, and modifications to the Bid Solicitation and/or the New Jersey Standard Terms and Conditions relative to this Bid Solicitation as set forth in all Bid Amendments.
All other instructions, terms, and conditions of the Bid Solicitation shall remain the same
Bid Solicitation #20DPP00471 T1628 – Enhanced Motor Vehicle Inspection Maintenance System
Answers to Questions
Where applicable, each question references the appropriate Bid Solicitation section. Note: This question has been paraphrased in the interest of readability and clarity.
| Number |
| Bid Solicitation and or Q&A Reference |
| Question (Bolded) and Answer |
| 1 |
| Question to Answer #22 - – Bid Amendment 6 |
| We cannot find the attachments 2-13 as referenced. They seem to be missing. |
A zip file titled CIF Thruput Wait Times containing 13 attachments was uploaded on October 26, 2020.
| 2 |
| Question to Answer #48 - – Bid Amendment 6 |
| It's clear the expenses for routine maintenance and operations of buildings and grounds are to be included in the inspection transaction fee. |
A) Where do bidders put the additional costs for the facility expenditures listed in Appendix 3.2H (FY2009 $486,877 through est. FY2018 $679,728)?
As per Bid Solicitation Section 3.21.3 A, the Vendor {Contractor} shall be solely responsible for all work and costs associated with capital maintenance, repairs, and renovations deemed necessary by the State at the CIF and SIF inspection facilities. The Vendor {Contractor} shall not list any additional costs for facility expenditures on the State Supplied Sheet. There is no price line on the State Supplied Price Sheet for additional costs for facility expenditures, and any Vendor’s {Contractor’s} attempt to edit, modify, or change the State Supplied Price Sheet by including additional costs for facility expenditures may be deemed non-responsive.
B) Are these expenditures reimbursed by the State as they are spent? Or are they non-reimbursable and to be included in the inspection transaction fee also?
Costs are not reimbursable by the State. As such, these costs should be a factor when formulating the prices to be entered on Price Lines 10 and 11 of the T1628 Revised Price Sheet 03/01/2021.
| 3 |
| Question to Answer #61 - – Bid Amendment 6 |
| There still may be a formula error with the Revised Price Sheet 03/18/2020. Specifically, what cell are bidders to use to quote the per unit prices for PIF equipment? Column K has formulas and columns E through J are blacked out. Inserting the prices in Column K would overwrite the formulas. |
The State Supplied Price Sheet has been updated with corrected formulas on price lines 3, 4, and 5. Please see T1628 Revised Price Sheet 03/01/2021.
| 4 |
| Question to Answer #18 - Bid Amendment 6 missing attachment? |
| Bid Amendment 6, Question 18 references "Attachment 1 to this Bid Amendment titled CIF Inspection Data Last 12 Months - Revised." We can't find the referenced attachment. |
Please see the answer to question #1 of this Bid Amendment.
| 5 |
| Question to Answer #22 - Bid Amendment 6, missing attachment? |
| Bid Amendment 6, Question 22 references, "Attachments 2-13 to this Bid Amendment titled CIF Thruput WaitTime Month-Year". We can't find the referenced attachments. |
Please see the answer to question #1 of this Bid Amendment.
| 6 |
| CIF Operations during Pandemic |
| What level of contingency planning will the State require of all bidders related to pandemic-related issues (i.e. station closures, contact tracing, etc.)? |
Vendors {Bidders} may formulate contingency plans with its internal health and safety units to address pandemic-related issues. The State is not requiring this as part of this Bid Solicitation.
| 7 |
| CIF Operations during Pandemic |
| What service level relief will the State provide if a CIF must close for temporary, pandemic-related reasons? |
Since there is ample capacity, service levels relief, if any, from CIF closures due to pandemic-related reasons may be handled on a case by case basis.
| 8 |
| CIF Operations during Pandemic |
| In the event of a pandemic-related facility closure, what planning should all bidders include in their proposal regarding the redistribution of test volume? |
Without knowing the size or scope of a pandemic-related facility closure, it would be difficult and speculative to make any plans regarding the re-distribution of test volume, even if there would be any.
| 9 |
| CIF Operations during Pandemic |
| Due to the pandemic shutdown of CIF operations and facility testing, a large number of vehicles have been granted due date extensions in calendar year 2020. Given the likely shift of testing volumes into late 2020 and early 2021, please provide revised volume estimates resulting from this temporary increase in testing volumes. |
The CIF’s re-opened on 6/29/20. It is expected that there will be a temporary increase in volume for a limited time. Due to the excess capacity of the CIF’s, this increase in volume should be accommodated and as such, would not impact this solicitation, it is anticipated that volumes should return to anticipated volumes later this year.
| 10 |
| CIF Operations during Pandemic |
| Given the anticipated temporary increase in testing volumes, will the State forego wait times penalties until inspection volumes return to pre-pandemic levels? |
The State does not anticipate any increase in inspection volumes that would affect this Bid Solicitation, therefore wait time liquidated damages will remain as stated.
| 11 |
| CIF Operations during Pandemic |
| Will the State require or mandate expanded testing hours of operation at CIFs on a temporary basis to accommodate the increase in testing volumes? |
The method for determining the hours of operation are detailed in Bid Solicitation Section 3.20. Vendors {Bidders} should be guided accordingly.
| 12 |
| CIF Operations during Pandemic |
| Currently if someone tests positive for the virus while working in one of the centralized facilities, the employees who came in contact with that person must self-quarantine for 14 days, which may require the station to close for 2 weeks. What staffing-related and throughput requirement accommodations will the State provide if the bidder must close a facility several times due to positive testing results by employees? |
Staffing is the responsibility of the Vendor {Bidder}, as such, Vendors {Bidders} should follow the requirements specified in Bid Solicitation Section 3.14 to insure they have appropriate staffing levels to meet those requirements and minimize facility closures.
| 13 |
| CIF Operations during Pandemic |
| What wait time relief will the State provide given anticipated longer test durations due to employees wearing PPE and conducting proper cleaning during and between inspections? |
The State does not anticipate any reason that test duration would take any longer due to employees wearing PPE. Additionally, the State is not requiring any additional function or activity other that what is required by this solicitation as such the wait time requirements remain as stipulated.
| 14 |
| CIF Operations during Pandemic |
| What level of participation or engagement will the State require regarding contact tracing related to positive test results by employees and, potentially, motorists and customers? |
Vendors {Bidders} should consult with their internal health and safety units regarding contact tracing. The State has posted on its COVID website www.covid19.nj.gov all pertinent information regarding its official guidance, resources, and support regarding the disease.
| 15 |
| CIF Operations during Pandemic |
| In the event of a facility closure due to pandemic, what alternative technologies deployed outside of the facility would the State consider to achieve emissions compliance? |
The State is not pursuing any alternative technologies other than what is stipulated in this Bid Solicitation.
| 16 |
| Question to Answer #36 – Bid Amendment 6 |
Routine Maintenance and Operations of Buildings and Grounds Bidders were not permitted to visit SIFs during the 2nd round of visitations for capital repair assessments. Given this, what capital repairs and costs should bidders include in their proposals?
All Vendors {Bidders} were afforded the opportunity to visit all sites in November 2019. 16 sites were visited, at which time all potential Vendors {Bidders} in attendance agreed that was enough sites to visit and no further sites needed to be looked at. SIF locations are of similar age, construction and condition as the 16 sites visited. As provided in the answer to question #36 of Bid Amendment #6 posted on March 18, 2020, the average annual costs of capital repairs expenses at the SIF sites is approximately $25,000. Vendors {Bidders} should use that cost for its Quote submissions.
| 17 |
| Question to Answer #37 – Bid Amendment 6 |
Routine Maintenance and Operations of Buildings and Grounds Should bidders assume that all repairs identified during the 45-day baseline takeover be paid for by the State?
As per Bid Solicitation Section 3.21.3 A, the Vendor {Contractor} must accept responsibility for Capital Maintenance, Repairs, and Renovations Work (Work) within 90 days after award of a Blanket P.O. at authorized NJ State inspection facilities (facilities). The Vendor {Contractor} is not responsible for repair costs until the 90th day.
| 18 |
| Routine Maintenance and Operations of Buildings and Grounds |
| In the response to Round One questions, a cap of $25,000.00 was indicated for SIF capital repairs. Should bidders assume that any costs above this threshold will be paid by the State? |
No, Vendors {Bidders} should not assume that any costs above $25,000 related to SIF capital repairs will be paid or reimbursed by the State. As provided in the answer to question #36 of Bid Amendment #6 posted on March 18, 2020, the average annual costs of capital repairs expenses at SIF sites is approximately $25,000. $25,000 is an average and estimated dollar value Vendors {Bidders} should use for its Quote submissions.
| 19 |
| CIF Capital Maintenance, Repairs, and Renovations at Existing CIFs |
| The current contractor has documented just over 2 million dollars in facility capital repairs that have been delayed from 2016-2019. The contractor is willing to furnish this information upon request from the State. What amount should bidders include in their proposal to cover the amount of delayed capital repairs at all facilities? |
The actual capital repair expenses for the last 12 years are located in Appendix 3.2 H. All Vendors {Bidders} should use these costs in estimating capital repair costs. Updated facility costs chart has been uploaded as T1628 Revised Appendix 3.2H 03/01/2021.
| 20 |
| CIF Capital Maintenance, Repairs, and Renovations at Existing CIFs |
| What amount should bidders include for all necessary capital repairs at all facilities which have not been previously documented? |
Vendors {Bidders} should use the actual amounts found in Appendix 3.2H. Please see the answer to question #19.
| 21 |
| Question to Answer #44 – Bid Amendment 6 |
CIF Capital Maintenance, Repairs, and Renovations at Existing CIFs In response to Question #44 from the first round of bidder questions, please clarify the condition which will require the DOT to complete striping and paving at facilities.
In response to the State’s answer of question #44 of Bid Amendment #6 posted on March 18, 2020, the condition which will require initiation of a Department of Transportation (DOT) resurfacing project will be determined by an onsite inspection conducted by MVC Facilities and DOT Resident Engineer.
| 22 |
| Question to Answer #44 – Bid Amendment 6 |
CIF Capital Maintenance, Repairs, and Renovations at Existing CIFs What are the conditions of facility queuing lanes and parking lots that will determine the need for repaving?
Please see the answer to question #21 of this Bid Amendment. Please also see the answer of question #44 of Bid Amendment #6 posted on March 18, 2020.
Bottom of Form