T1628 Bid Amendment 4 12.27.19~2.docx
DOCX document 87 KB Posted
- Solicitation number
- 20DPP00471
- Issued by
- Mercer County, New Jersey
About this file
This document is a Bid Amendment #4 issued by the New Jersey Department of the Treasury, Division of Purchase and Property Procurement Bureau for the Enhanced Motor Vehicle Inspection Maintenance System (Bid Solicitation #20DPP00471 T1628). The key details are:
The bid solicitation is for a statewide contract opportunity that involves the State of New Jersey as well as Mercer County and Trenton City. The solicitation is seeking vendors to provide an enhanced motor vehicle inspection maintenance system, including centralized inspection facilities (CIFs), private inspection facilities (PIFs), and a new generation vehicle inspection database (NGVID). Key dates include a revised quote submission due date of February 28, 2020 and answers to a portion of the electronic questions. The contract term is not specified.
The bid amendment provides clarification on various technical and operational requirements, such as system access, inspection equipment maintenance, data reporting, and user authentication. It also addresses exceptions to the standard terms and conditions, joint venture arrangements, and the transition from the legacy system. Pricing details, funding sources, and incumbent information are not provided.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHILIP D. MURPHY
Governor State of New Jersey
DEPARTMENT OF THE TREASURY
DIVISION OF PURCHASE AND PROPERTY
PROCUREMENT BUREAU
33 WEST STATE STREET
P. O. BOX 230
TRENTON, NEW JERSEY 08625-0230
ELIZABETH MAHER MUOIO
State Treasurer
SHEILA Y. OLIVER
Lt. Governor
MAURICE A. GRIFFIN
Acting Director https://www.njstart.gov
December 27, 2019
To: All Interested Vendors {Bidders}
Re: Bid Solicitation # 20DPP00471 T1628 – Enhanced Motor Vehicle Inspection Maintenance System
Quote Submission Due Date: Thursday, November 7, 2019 (2:00 p.m. Eastern Time) Revised Quote Submission Due Date: Friday, February 28, 2020 (2:00 p.m. Eastern Time)
Bid Amendment #4
The following constitutes Bid Amendment #4 to the above referenced Bid Solicitation:
· An extension of the Quote Submission due date from Wednesday, January 15, 2020 to Friday, February 28, 2020;
· Answers to a portion of the electronic questions. Answers to the remaining electronic questions will be posted in a subsequent Bid Amendment;
· Please note that for all additions, deletions, clarifications and modifications to the Bid Solicitation, refer to the revised Bid Solicitation entitled “T1628 Revised Bid Solicitation 12/27/19”; and
· Optional Site Visit Sign-In Signature Sheet.
It is the sole responsibility of the Vendor {Bidder} to be knowledgeable of all of the additions, deletions, clarifications, and modifications to the Bid Solicitation and/or the New Jersey Standard Terms and Conditions relative to this Bid Solicitation as set forth in all Bid Amendments.
All other instructions, terms, and conditions of the Bid Solicitation shall remain the same.
Bid Solicitation #20DPP00471 T1628 – Enhanced Motor Vehicle Inspection Maintenance System
Answers to Questions
Where applicable, each question references the appropriate Bid Solicitation section.
Note: These questions have been paraphrased in the interest of readability and clarity.
| # |
| Bid Solicitation |
Section Reference Question (Bolded) and Answer
When trying to open a Portable Document Format (PDF) I am receiving an error message and am unable to access the PDF. How should I proceed?
It is recommended that users utilize Internet Explorer and Microsoft Edge to view PDFs. Certain PDF forms cannot be opened in the Chrome or Firefox built in PDF viewers that are enabled by default. If using Chrome or Firefox it is recommended that the file is downloaded instead by clicking the download button in the upper right-hand corner of the browser after an error message is received. An alternative option is to disable the built in PDF viewers in Chrome or Firefox.
Should I check that I have properly completed and attached all of the required documents with my submitted Quote?
Yes. Prior to the Quote Opening Deadline, a Vendor {Bidder} should review the documents comprising the submitted Quote to ensure that all of the required documents have been completed and attached. Oftentimes a Quote is deemed non-responsive because a Vendor {Bidder} fails to attach a required form or attaches a blank form. To review a submitted a Quote a Vendor {Bidder} should log into NJSTART and review each document attached to the Quote submission. Instructions on how to review a submitted Quote can be found in the Quick Reference Guide entitled How to Review a Submitted Quote which is available on the NJSTART Vendor Support Page under Vendor Reference Guides.
Will the State allow Vendors to take exception to any of the Standard Terms and Conditions?
As stated in Bid Solicitation Section 1.3.1.1, Exceptions to the NJ Standard Terms and Conditions (SSTC): "Questions regarding the SSTC proposed exceptions to mandatory requirements, including the Special and Standard Terms and Conditions in Sections 5 and 9 of this Bid Solicitation must be posed during this Electronic Question and Answer period and shall contain the Vendor's {Bidder's} suggested changes and the reason(s) for the suggested changes." Additionally, as stated in Section 4.1, General: "Quotes including Vendor {Bidder} proposed terms and conditions may be accepted, but Vendor {Bidder} proposed terms or conditions that conflict with those contained in the Bid Solicitation, as defined in Section 2.) of this Bid Solicitation, or that diminish the State's rights under any Blanket P.O. resulting from the Bid Solicitation, may render a Quote non-responsive."
| 4 |
| Bid Solicitation Section 1.4.8, Joint Venture |
| Does a bid by a joint venture" require a single, separate legal entity, or can two companies with complementary services provide a joint bid? |
The State can only award to one Vendor {Bidder}, so if two or more entities wish to form a single purpose Joint Venture entity for the purpose of bidding on this procurement and performing the scope of work, they may do so. That entity may take on any formal or informal corporate structure, including an L.L.C., a Corporation, and L.L.P. or a simple partnership. If the Joint Venture is not submitting the bid, as stated in Bid Solicitation Section 1.4.8, Joint Venture, each party that will be part of the Joint Venture must individually sign the State’s Offer and Acceptance form and fully comply with all the forms and certification requirements set forth in the Bid Solicitation.
| 5 |
| Bid Solicitation Section 1.4.8, Joint Venture |
| Will the Vendor/Contractor be required to do safety inspections on commercial vehicles or will this be handled by the state? |
Safety inspections on commercial vehicles will continue to be performed by the Vendor {Contractor}. These vehicles can also be inspected at the Private Inspection Facility (PIF).
| 6 |
| Bid Solicitation Section 3.1.2, Existing CIF |
| Who is responsible for maintenance of the legacy equipment at the PIFs between the period of 90 days when the new contractor assumes operation of the CIFs and 12 months from the Blanket P.O. when the new contractor has completed installation of their new PIF Workstations? |
As stated in Bid Solicitation Section 3.21.1, Inspection Equipment Maintenance, (C), “The Vendor {Contractor} shall be responsible for all costs associated with the maintenance and repair of all inspection equipment for the full term of the Blanket P.O. including operation of any legacy equipment utilized during the Implementation Phase identified in the Scope of Work.”
| 7 |
| Bid Solicitation Section 3.1.3, Transition from Legacy VID to NGVID |
| How long is the legacy Vendor expected to operate the legacy VID during the transition process? |
The current Vendor {Contractor} shall operate the VID for one (1) year from the date of new award.
| 8 |
| Bid Solicitation Section 3.1.3, Transition from Legacy VID to NGVID |
| Will the legacy system need to access previous test information from the new NGET system during the transition period? |
No, the legacy system does not need to access previous test information for the new system during the transition period.
| 9 |
| Bid Solicitation Section 3.2, Project Descriptions and Requirements |
| Is the "database: referenced in 3.2(AA) (19) additional to the required NGVID? |
Yes, database in this context refers to the NGVID Operational Data Store (NGV-ODS) that will be used for reporting and queries. Reports are run against a “shadow database” to minimize any interactions within the production environment.
| 10 |
| Bid Solicitation Section 3.2, Project Descriptions and Requirements, E |
| What diesel meters are currently used to conduct the diesel opacity tests? |
The following diesel meters are currently being used to conduct the diesel opacity tests:
1. Beakley Model 1300;
2. Bosch RTT 100;
3. Cal Test 1000;
4. OTC 3405 S;
5. Wager Model 6700;
6. Model 7500; and
7. Red Mountain Diesel Meters Model #1667.
| 11 |
| Bid Solicitation Section 3.4, Management Console |
| Is a station level management & reporting system required? |
A station level management system is not required; however, a reporting system is required. Please see Bid Solicitation Section 3.43, NGVID Reporting, for all information on reporting. Examples of reporting are also available in Appendix 3.2A.
| 12 |
| Bid Solicitation Section 3.4.4, Audit Data |
| This section refers to access using a "web-based connection" to the Management Console. Section 3.4 refers to the use on Web Browsers to access the Management Console. Section 3.2 refers to the Management Console but does not mention "Web-Based" access. Does this infer the contractor has to supply a version of the Management Console that is not accessed with a web browser; Does the contractor have to Design/Supply a Desktop Application to access the Management Console? |
No, the Vendor {Contractor} shall not design/supply a Desktop Application. The Management Console shall be web based.
| 13 |
| Bid Solicitation Section 3.5, Document Repository |
| “Upload any File Format" Can the Vendor {Contractor} restrict Executable (*.EXE) and other file formats that can execute/carry code that create a Potential Security Issue? |
File formats that can be uploaded to the document repository are document type files (pdf, docx, xlsx, etc.), *.EXE files are not documents so they can be prevented from inclusion in the document repository.
| 14 |
| Bid Solicitation Section 3.6.1, Operating Performance Standards, B |
| Is there an exception for this service level if the OIT system is down or not capable of accepting inspection records? |
Yes, if the Office of Information Technology (OIT) system is down or offline, the service level standard will not be imposed. Section 3.6.1 has been revised – please refer to attachment T1628 Revised Bid Solicitation 12.27.19.
| 15 |
| Bid Solicitation Section 3.6.1, Operating Performance Standards, I |
| Does the non-PROD downtime exclude scheduled downtime for maintenance? |
Yes, the non-production downtime excludes scheduled downtime for maintenance.
| 16 |
| Bid Solicitation Section 3.13, Inspection Facilities |
| A. The RFP States that the CIF network has "more inspection lanes than necessary to inspect approximately 1.9 million vehicles." Given this, are Vendors permitted to propose an alternative network of centralized facilities? |
A Vendor {Contractor} may operate as many lanes and configurations as it deems necessary to meet customer service requirements. It may also propose alternative solutions utilizing the current facilities. However, all current facilities must be utilized.
B. More specifically, are Vendors permitted to propose the closure of facilities necessary to reduce the overall CIF network size and associated costs?
No. All current facilities must be utilized; however, the Vendor {Bidder} may propose the number of lanes at each station and how those lanes will be configured.
| 17 |
| Bid Solicitation Section 3.13.2.1, CIF Network and Lane Configuration |
| Under "B" appointment system, there are 3 -one (1) lane stations that accept appointments, can a Vendor show an alternative approach, to level the inspection volumes at the beginning of the month and end of the month by allowing appointments in the middle of the month at the other stations? |
No, the current appointment system has had mixed results. Appointment stations have limited on-site or street queuing. There is no conclusive proof that the appointment stations leveled the monthly day to day volume any differently than the other stations. In addition, they have generated complaints either by customers unaware there are appointment stations, or by customers with appointments not taken at their appointed time and waiting for inspection.
| 18 |
| Bid Solicitation Section 3.13.2.1, CIF Network and Lane Configuration |
| Are emissions re-inspections and/or safety inspections going to be redirected to the PIFs? |
No, neither emissions re-inspections nor safety inspections will be redirected to the PIFs.
| 19 |
| Bid Solicitation Section 3.13.4, Transition, Retrofit, Operations, and Management Plan, E |
| Will the state please provide a current properties report that describes the present condition of each CIF so that bidders can estimate exterior site work, structural, landscaping, asphalt, etc.? |
Because the Vendors {Bidders} have been given an opportunity to visit and inspect all of the CIFs, it is expected that they can arrive at an estimated cost of such services for each location, and include this amount in their quoted per-vehicle inspection cost. Please refer to Appendix 3.2H for historical data on capital maintenance and repairs since 2009. This will provide a benchmark for these expenses.
| 20 |
| Bid Solicitation Section 3.13.5, Removal of Old Equipment, B |
| Will the state please describe the age and reliability of the integrated video monitoring system that the (current) contractor provided? Is this system capable of storing video viewing post 90 days as required in the new RFP? |
The current system was installed in 2008 and is currently in working conditions that cover terms such as inspection transaction fee costs, payments, and other necessary terms and conditions.
| 31 |
| Bid Solicitation Section 3.29.3, NGWorkstation Hardware Configuration |
| Please define "ruggedized" with temperature and drop specs or a State specification. |
Please refer to the answer to question #29.
| 32 |
| Bid Solicitation Section 3.29.3, NGWorkstation Hardware Configuration |
| The RFP describes three configurations for the NGWorkstation: 1. Mandatory offer: a. Either a PC-based desktop NGWorkstation system, or b. A PC-based laptop NGWorkstation system. 2. Optional offer: a. A Tablet based NGWorkstation system Does PC-based mean that a bidder must offer a Windows based computer, and cannot offer e.g., an Apple MacBook based NGWorkstation system, or a client-server based NGWorkstation system? |
The equipment must be Windows-based.
| 33 |
| Bid Solicitation Section 3.29.3, NGWorkstation Hardware Configurations, C |
and Section 3.30.1, NGWorkstation Overview, A.2 A. Page 78, Section 3.29.3.C and 3.30.1.A.2 reference air cards - What is the model of air card and hardware interface to them that the Vendor needs to support?
Verizon MiFi8800L.
B. Do the existing air cards connect via Wi-Fi? If no, please specify how they connect (e.g., PCI, USB, etc.).
The current Verizon MiFi8800L air cards connect to the workstations via WiFi. Each MVC Bus Inspection Unit (BIT), Mobile Inspection Team (MIT) and Heavy- Duty Diesel Inspection Team (HDD) workstation shall connect via MiFi Unit with a unique SSID and password.
| 34 |
| Bid Solicitation Section 3.30.1, NGWorkstation Overview |
| Currently the NGWorkstations communicate using a station controller. If the plan is to continue to use the station controllers to facilitate offline testing and as a proxy, will this satisfy the requirement for the workstations to communicate with the NGVID? |
The station controllers are used only in the centralized facilities. Communications must be to the NGVID, and the SLA Section 3.49 describes the connectivity that is required. The decentralized NGWorkstations must communicate directly with the VID.
| 35 |
| Bid Solicitation Section 3.31, Rules Engine |
| If customized functions need to be created in the rules engine, do business users need to be trained? |
Yes, the business users must be trained.
| 36 |
| Bid Solicitation Section 3.35.1, General NGWorkstation Security Requirements, C |
| Regarding 3.35.1.C Who is responsible for having the diagnostic software, used in diagnostic mode (3.30.3), installed and maintained? |
The Vendor {Contractor} is responsible for the diagnostic mode defined in Bid Solicitation Section 3.30.3, Additional Inspection Software Requirements, J.
| 37 |
| Bid Solicitation Section 3.35.2, NGWorkstation User Authentication |
| Currently in CIF, Biometric is being used to authenticate users, is it still required? |
No, Biometrics are no longer required at the CIF or PIF.
| 38 |
| Bid Solicitation Section 3.39.1.1, Requirements Analysis, C-D |
Please confirm that the RTM required in the 30 days of the contract covers the entire NGSystem set of requirements for the VID, CIF/SIF/PIF/PFF/BIT/MIT, web portal, public web site, etc.. Will the State confirm that the required SME’s will be available to attend sessions for the first 30 days of the contract to allow for the contractor to meet this requirement and to meet the 60day requirement to provide written specifications to the State for review.
Yes, the RTM required in the first 30 days of the Blanket P.O. covers the entire NGSystem set of requirements. The required SMEs will be made available to attend sessions for the first 30 days of the Blanket P.O.
| 39 |
| Bid Solicitation Section 3.39.2, System Environments |
| Does the storage for each environment need to be physically separate, or will the Vendor be allowed to use a centralized storage and use logical separations to dedicate storage to each environment? |
Yes, logical separations are acceptable.
| 40 |
| Bid Solicitation Section 3.41.7, Privacy |
| For clarity purposes, please confirm the last sentence is intended to read: "as defined in the Blanket P.O., or in an open standards machine-readable format if not defined in the Blanket P.O." |
Yes, that is correct
| 41 |
| Bid Solicitation Section 3.50.1, Motorist Hotline |
| The RFP notes CIF Hours of Operation are 8:00 A.M. to 4:30 P.M., Monday to Friday and Saturday from 7:00 A.M. to Noon. Would the State please confirm the hours of operation for the Motorist Hotline? |
Not confirmed. As stated in Section 3.50.1 (A), the Vendor {Contractor} shall operate the customer Hotline from 8:00 a.m. to 5:00 p.m. Monday through Friday and from 8:00 a.m. to 12:00 p.m. on Saturday.
| 42 |
| Appendix 3.4A, OBD Hardware Specification |
| To clarify, referring to Appendix 3.4A:2.1 vehicle power from the DLC is permitted as a secondary power source could you clarify the meaning of primary power source and secondary power source in this context? |
The primary power source of the OBD module is the battery located within the module itself. Any power source that is not the primary source would be considered secondary.
| 43 | |
| Appendix 3.4A, OBD Hardware Specification | |
| Are OBD devices permitted to contact the NGVID at any time? |
No, as stated in Appendix 3.4A.3.2, “The OBD module shall not receive any commands from the NGVID to perform a test.”
| 44 |
| Appendix 3.4A, OBD Hardware Specification |
| Regarding RFP Appendix 3.4 A under subsection 12.8: The language States, "Upon changes made to the excluded vehicle list?" How long does the Vendor have to push changes beyond in the initial transition? |
Changes to the exclusion list shall be for the duration of the Blanket P.O.
| 45 |
| Appendix 3.4A, OBD Hardware Specification |
| Will the OBD module be drop tested with the cable attached to the device? |
Yes, the device is intended to be used with the cable attached, so testing will be conducted on the device in the configuration how it would normally be used.
| 46 |
| Appendix 3.4A, OBD Hardware Specification |
| Referring to Appendix 3.4A:2.1 It appears as though the only source of vehicle voltage allowable is a pin on the DLC. Only CAN communication is guaranteed possible if vehicle voltage is not present, for example, communication over ISO9141 is not possible if vehicle voltage is not present. Is it permissible to connect an external reference supply via cigarette lighter or battery clips to the vehicle in these circumstances? |
Appendix 3.4A.14.2 states, “If the contractor has a reason to believe a conflicting requirement listed in this specification will adversely affect the performance of the OBD module, an explanation should be submitted to the State along with supporting documentation, evidence, and data. After examination of the documentation and supporting data certain requirements contained herein may be removed by the State.”
| 47 |
| Appendix 3.4A, OBD Hardware Specification |
| Referring to Appendix 3.4A:6.2A Is this light requirement referring to power available at the DLC needed to ensure communication or is it referring to the battery of the OBD device having a sufficient charge? |
Appendix 3.4A.6.1 states, “The OBD module shall have an indicator light to inform the operator the device has sufficient power to perform an OBD test.” The light is to inform the operator there is enough power to conduct an OBD test regardless of whether the power source is primary or secondary.
| 48 |
| General: On-Demand Sticker Printing |
| Has the State considered using software such that the unique stickers are printed at each station at the time of each inspection instead of the current laborious inventorying and security required for the sticker stock? |
The State has considered other methods for sticker issuance and has determined that the current method is the most reliable. The State currently uses this significant process for its sticker issuance as well as the PIF and finds it has no excessive administrative burden if managed properly by using efficient inventorying processes. Refer to Question #23. MVC is also exploring new sticker programs.