SWPPP Template.pdf

PDF 3 MB Posted

Attached to
AK NPS DENA 10(49), Polychrome Area Improvements
Solicitation number
69056722R000015
Issued by

About this file

This solicitation requests proposals for Polychrome Area Improvements at Denali National Park in Alaska. The National Park Service seeks to improve visitor facilities including replacing restroom buildings, constructing new trails and boardwalks, and performing miscellaneous repairs. Proposals are due by July 15, 2022 and the period of performance is 270 calendar days from award. The total estimated cost is between $1-5 million to be funded by the NPS. The solicitation is designated as a small business set-aside.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
Amendment A004.pdf PDF
QA_10-31-2022.pdf PDF
Amendment A003.pdf PDF
QA_10-28-2022.pdf PDF
QA_10-20-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-12-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-11-2022.pdf PDF
QA_10-06-2022.pdf PDF
9830-010P - UPPER IGLOO CREEK - PLANS.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
Pages P-1 through P-4.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
RFP-69056722R000015.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 1-360.pdf PDF
AKNPSDENA_Preliminary_Plans.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - PLANS.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - PLANS.pdf PDF
9830-009P - LOWER IGLOO CREEK INSPECTION REPORT 2021.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - PLANS.pdf PDF
National Park Service_FONSI_20220314_508.pdf PDF
DENA Rating Trucks.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - PLANS.pdf PDF
PolychromeAreaImprovementsEA_20220113.pdf PDF
AKNPSDENA_Preliminary_Design Narrative.pdf PDF
AK NPS DENA 10(49) FHWA FONSI Final Signed.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - PLANS.pdf PDF
EXAMPLE PREVIOUS CONSTRUCTION PERMIT LOADS DENALI PARK ROAD.pdf PDF
Polychrome_Project Delivery Plan.pdf PDF
Polychrome_Project Delivery Plan_Appendices_J-L.pdf PDF
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - PLANS.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
MtMcKinley Road Cultrual Landscape Report 121418.pdf PDF
9830-009P - LOWER IGLOO CREEK PLANS.pdf PDF
GR 06-22-Geotechnical Modeling Report-FINAL-Rev1.pdf PDF
Load Rating - Blank Excel Template summary tables.xlsx XLSX spreadsheet
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - INSPECTION REPORT 2021.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
9830-010P - UPPER IGLOO CREEK - INSPECTION REPORT 2021.pdf PDF
9830-011P - GHIGLIONE BRIDGE - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 361-937.pdf PDF
Denali National Park Bridge Location Map and Key.pdf PDF
Polychrome_Project Delivery Plan_ Appendices_A-I.pdf PDF
AKNPSDENA_Preliminary_XSections.pdf PDF
9830-011P - GHIGLIONE BRIDGE - PLANS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stormwater Pollution Prevention Plan

SWPPP

For:

Federal Highway Administration Western Federal Lands Highway Division

Table of Contents

SWPPP TABS

TAB 1: SWPPP Narrative

TAB 2: NPDES Permit (Construction General Permit)

TAB 3: NOI, EPA Acknowledgement, Other Applicable Correspondence

TAB 4: Delegation of Authority

TAB 5: Site Maps (Indicate Wetlands, Waters, other Waterbodies)

TAB 6: Erosion/Sediment Control Plan Sheets (Plan Set and BMP Typical Details)

TAB 7: Revegetation Plan (if applicable)

TAB 8: SWPPP Amendment Log

TAB 9: Inspection Reports

TAB 10: Corrective Action Log

TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports

TAB 12: Training Certificates and SWPPP Training Log

TAB 13: Government-Selected Waste, Borrow, Staging Sites (Indicate BMPs at Each Site)

TAB 14: Grading and Stabilization Log

TAB 15: Hazardous Spill Plan or Spill Prevention, Control, and Countermeasures (SPCC)

TAB 16: Endangered Species Act (ESA) & Cultural Resources (Section 106) Documentation

TAB 17: Quality Assurance Checklist

TAB 18: NPDES Notice of Termination (NOT)

Tab 1 - SWPPP Narrative

Revise and update as needed per SCR 107 and SCR 157

Tab 2 - NPDES Permit (Construction General Permit)

2022 Construction General Permit (CGP)

National Pollutant Discharge Elimination System (NPDES) Construction General Permit (CGP) for Stormwater Discharges from

Construction Activities

In compliance with the provisions of the Clean Water Act, 33 U.S.C. §1251 et. seq., (hereafter CWA), as amended by the Water Quality Act of 1987, P.L. 100-4, “operators” of construction activities (defined in Appendix A) that meet the requirements of Part 1.1 of this National Pollutant Discharge Elimination System (NPDES) Construction General Permit (CGP), are authorized to discharge pollutants in accordance with the effluent limitations and conditions set forth herein. Permit coverage is required from the “commencement of construction activities” (see Appendix A) until one of the conditions for terminating CGP coverage has been met (see Part 8.2).

This permit becomes effective on 12:00 am, February 17, 2022.

This permit and the authorization to discharge expire at 11:59pm, February 16, 2027.

Signed and issued this 18 day of January 2022

Deborah Szaro, Acting Regional Administrator, EPA Region 1.

Signed and issued this 18 day of January 2022

Javier Laureano, Director, Water Division, EPA Region 2.

Signed and issued this 18 day of January 2022

Carmen Guerrero-Perez, Director, Caribbean Environmental Protection Division, EPA Region 2.

Signed and issued this 18 day of January 2022

Catherine A. Libertz, Director, Water Division, EPA Region 3.

Signed and issued this 18 day of January 2022

Jeaneanne Gettle, Director, Water Division, EPA Region 4.

Signed and issued this 18 day of January 2022

Tera Fong, Director, Water Division, EPA Region 5.

Signed and issued this 18 day of January 2022

Charles W. Maguire, Director, Water Division, EPA Region 6.

Signed and issued this 18 day of January 2022

Jeffery Robichaud, Director, Water Division, EPA Region 7.

Signed and issued this 18 day of January 2022

Darcy O’Connor, Director, Water Division, EPA Region 8.

Signed and issued this 18 day of January 2022

Tomás Torres, Director, Water Division, EPA Region 9.

Signed and issued this 18 day of January 2022

Daniel D. Opalski, Director, Water Division, EPA Region 10.

Page i

CONTENTS

1 How to Obtain Coverage Under the Construction General Permit (CGP)

1.1 Eligibility Conditions

1.2 Types of Discharges Authorized

1.3 Prohibited Discharges

1.4 Submitting your Notice of Intent (NOI)

1.5 Requirement to Post a Notice of Your Permit Coverage

2 Technology-Based Effluent Limitations

2.1 General Stormwater Control Design, Installation, and Maintenance Requirements

2.2 Erosion and Sediment Control Requirements

2.3 Pollution Prevention Requirements

2.4 Construction Dewatering Requirements

3 Water Quality-Based Effluent Limitations

3.1 General Effluent Limitation to Meet Applicable Water Quality Standards

3.2 Water Quality-based Conditions for Sites Discharging to Sensitive Waters44

3.3 Water quality-based conditions For sites discharging To Sensitive Waters From Construction Dewatering activities

4 Site Inspection Requirements

4.1 Person(s) Responsible for Inspecting Site

4.2 Frequency of Inspections

4.3 Increase in Inspection Frequency for Certain Sites

4.4 Reductions in Inspection Frequency

4.5 Areas that Must Be Inspected

4.6 Requirements for Inspections

4.7 Inspection Report

4.8 Inspections By EPA

5 Corrective Actions

5.1 Conditions Triggering Corrective Action

5.2 Corrective Action Deadlines

5.3 Corrective Action Required by EPA

5.4 Corrective Action Log

6 Stormwater Team Formation/ Staff Training Requirements

6.1 Stormwater Team

6.2 General Training Requirements For Stormwater Team Members

6.3 Training Requirements For Persons Conducting Inspections

6.4 Stormwater Team’s Access To Permit Documents

Page ii

7 Stormwater Pollution Prevention Plan (SWPPP)

7.1 General Requirements

7.2 SWPPP Contents

7.3 On-Site Availability of Your SWPPP

7.4 SWPPP Modifications

8 How to Terminate Coverage

8.1 Minimum Information Required in NOT

8.2 Conditions for Terminating CGP Coverage

8.3 How to Submit Your NOT

8.4 Deadline for Submitting the NOT

8.5 Effective Date of Termination of Coverage

9 Permit Conditions Applicable to Specific States, Indian Country Lands, or Territories

Appendix A: Definitions ........................................................................................................................ A-1

Appendix B: Permit Areas Eligible for Coverage and EPA Regional Addresses ........................... B-1

Appendix C: Small Construction Waivers and Instructions .............................................................. C-1

Appendix D: Eligibility Procedures Relating to Threatened & Endangered Species Protection . D-1

Appendix E: Historic Property Screening Process .............................................................................. E-1

Appendix F: Buffer Requirements .......................................................................................................... F-1

Appendix G: Standard Permit Conditions ......................................................................................... G-1

Appendix H: Notice of Intent (NOI) Form and Instructions .............................................................. H-1

Appendix I: Notice of Termination (NOT) Form and Instructions ...................................................... I-1

Appendix J: Suggested Format for Request for Chemical Treatment ............................................. J-1

Appendix K: Turbidity Benchmark Monitoring Report Form ............................................................ K-1

1 HOW TO OBTAIN COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT (CGP)

To be covered under this permit, you must meet the eligibility conditions and follow the requirements for obtaining permit coverage in this Part.

1.1 ELIGIBILITY CONDITIONS

1.1.1 You are an “operator” of a construction site for which discharges will be covered under this permit. For the purposes of this permit and in the context of stormwater discharges associated with construction activity, an “operator” is any party associated with a construction project that meets either of the following two criteria:

The party has operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or

The party has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit conditions.

Where there are multiple operators associated with the same project, all operators must obtain permit coverage.1 Subcontractors generally are not considered operators for the purposes of this permit.

1 If the operator of a “construction support activity” (see Part 1.2.1c) is different than the operator of the main site, that operator must also obtain permit coverage. See Part 7.1 for clarification on the sharing of permit-related functions between and among operators on the same site and for conditions that apply to developing a SWPPP for multiple operators associated with the same site.

1.1.2 Your site’s construction activities:

Will disturb one or more acres of land, or will disturb less than one acre of land but are part of a common plan of development or sale (as defined in Appendix A) that will ultimately disturb one or more acres of land; or

Have been designated by EPA as needing permit coverage under 40 CFR § 122.26(a)(1)(v) or 40 CFR § 122.26(b)(15)(ii);

1.1.3 Your site is located in an area where EPA is the permitting authority and where coverage under this permit is available (see Appendix B);

1.1.4 Discharges from your site are not:

Already covered by a different NPDES permit for the same discharge; or

In the process of having coverage under a different NPDES permit for the same discharge denied, terminated, or revoked.2, 3

2 Parts 1.1.4a and 1.1.4b do not include sites currently covered under the 2017 CGP that are in the process of obtaining coverage under this permit, nor sites covered under this permit that are transferring coverage to a different operator.

3 Notwithstanding a site being made ineligible for coverage under this permit because it falls under the description of Parts 1.1.4a or 1.1.4b, above, EPA may waive the applicable eligibility requirement after specific review if it determines that coverage under this permit is appropriate.

1.1.5 You can demonstrate you meet one of the criteria in the Endangered Species Protection section of the Notice of Intent (NOI) that you submit for coverage under this permit, per Part 1.4, with respect to the protection of Federally listed endangered or threatened species and Federally designated critical habitat under the Endangered Species Act

(ESA). If the EPA Regional Office grants you a waiver from electronic reporting per Part 1.4.2, you must complete the ESA worksheet in Appendix D to demonstrate you meet one of the criteria and submit it with your paper NOI (Appendix I).

1.1.6 You have completed the screening process in Appendix E relating to the protection of historic properties; and

1.1.7 You have complied with all requirements in Part 9 imposed by the applicable State, Indian Tribe, or Territory in which your construction activities and/or discharge will occur.

1.1.8 For “new sources” (as defined in Appendix A) only:

EPA has not, prior to authorization under this permit, determined that discharges from your site will not meet applicable water quality standards. Where such a determination is made prior to authorization, EPA may notify you that an individual permit application is necessary. However, EPA may authorize your coverage under this permit after you have included appropriate controls and implementation procedures designed to bring your discharge into compliance with this permit, specifically the requirement to meet water quality standards. In the absence of information demonstrating otherwise, EPA expects that compliance with the requirements of this permit, including the requirements applicable to such discharges in Part 3, will result in discharges that meet applicable water quality standards.

Discharges from your site to a Tier 2, Tier 2.5, or Tier 3 water4 will not lower the water quality of the applicable water. In the absence of information demonstrating otherwise, EPA expects that compliance with the requirements of this permit, including the requirements applicable to such discharges in Part 3.2, will result in discharges that will not lower the water quality of such waters.

4 Note: Your site will be considered to discharge to a Tier 2, Tier 2.5, or Tier 3 water if the first receiving water to which you discharge is identified by a State, Tribe, or EPA as a Tier 2, Tier 2.5, or Tier 3 water. For discharges that enter a storm sewer system prior to discharge, the first receiving water to which you discharge is the waterbody that receives the stormwater discharge from the storm sewer system. The current list of Tier 2, Tier 2.5, and Tier 3 waters located in the areas eligible for coverage under this permit can be found at https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates.

You can also use EPA’s Discharge Mapping Tool (https://www.epa.gov/npdes/epas-stormwater-discharge-mapping-tools) to assist you in identifying whether any receiving waters to which you discharge are listed as impaired (and the pollutant for which it is impaired) and whether an approved total maximum daily load (TMDL) exists for that waterbody.

1.1.9 If you plan to add “cationic treatment chemicals” (as defined in Appendix A) to stormwater and/or authorized non-stormwater prior to discharge, you may not submit your NOI until you notify your applicable EPA Regional Office (see Appendix J) in advance and the EPA Regional Office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will result in discharges that meet applicable water quality standards.

https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates https://www.epa.gov/npdes/epas-stormwater-discharge-mapping-tools

1.2 TYPES OF DISCHARGES AUTHORIZED5

5 See “Discharge” as defined in Appendix A. Note: Any discharges not expressly authorized in this permit cannot become authorized or shielded from liability under CWA Section 402(k) by disclosure to EPA, State, or local authorities after issuance of this permit via any means, including the Notice of Intent (NOI) to be covered by the permit, the SWPPP, or during an inspection.

1.2.1 The following stormwater discharges are authorized under this permit provided that appropriate stormwater controls are designed, installed, and maintained (see Parts 2 and 3):

Stormwater discharges, including stormwater runoff, snowmelt runoff, and surface runoff and drainage, associated with construction activity under 40 CFR § 122.26(b)(14) or § 122.26(b)(15)(i);

Stormwater discharges designated by EPA as needing a permit under 40 CFR §122.26(a)(1)(v) or § 122.26(b)(15)(ii);

Stormwater discharges from on or off-site construction support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) provided that:

The support activity is directly related to the construction site required to have permit coverage for stormwater discharges;

The support activity is not a commercial operation, nor does it serve multiple unrelated construction sites;

The support activity does not continue to operate beyond the completion of the construction activity at the site it supports; and

Stormwater controls are implemented in accordance with Part 2 and Part 3 for discharges from the support activity areas; and

d. Stormwater discharges from earth-disturbing activities associated with the construction of staging areas and the construction of access roads conducted prior to active mining.

1.2.2 The following non-stormwater discharges associated with your construction activity are authorized under this permit provided that, with the exception of water used to control dust and to irrigate vegetation in stabilized areas, these discharges are not routed to areas of exposed soil on your site and you comply with any applicable requirements for these discharges in Parts 2 and 3:

Discharges from emergency fire-fighting activities;

Fire hydrant flushings;

Landscape irrigation;

Water used to wash vehicles and equipment, provided that there is no discharge of soaps, solvents, or detergents used for such purposes;

Water used to control dust;

Potable water including uncontaminated water line flushings;

External building washdown, provided soaps, solvents, and detergents are not used, and external surfaces do not contain hazardous substances (as defined in Appendix A) (e.g., paint or caulk containing polychlorinated biphenyls (PCBs));

Pavement wash waters, provided spills or leaks of toxic or hazardous substances have not occurred (unless all spill material has been removed) and where soaps, solvents, and detergents are not used. You are prohibited from directing pavement wash waters directly into any receiving water, storm drain inlet, or constructed or natural site drainage features, unless the feature is connected to a sediment basin, sediment trap, or similarly effective control;

Uncontaminated air conditioning or compressor condensate;

Uncontaminated, non-turbid discharges of ground water or spring water;

Foundation or footing drains where flows are not contaminated with process materials such as solvents or contaminated ground water; and

Uncontaminated construction dewatering water6 discharged in accordance with Part 2.4.

6 EPA notes that operators may need to comply with additional procedures to verify that the dewatering discharge is uncontaminated. Operators should review Part 9 to determine if any of these requirements apply to their discharge and should ensure that they have complied with any State, Tribal, or local dewatering requirements that apply.

1.2.3 Also authorized under this permit are discharges of stormwater listed above in Part 1.2.1, or authorized non-stormwater discharges listed above in Part 1.2.2, commingled with a discharge authorized by a different NPDES permit and/or a discharge that does not require NPDES permit authorization.

1.3 PROHIBITED DISCHARGES7

7 EPA includes these prohibited non-stormwater discharges here as a reminder to the operator that the only non-stormwater discharges authorized by this permit are at Part 1.2.2. Any unauthorized non-stormwater discharges must be covered under an individual permit or alternative general permit.

The discharges listed in this Part are prohibited outright or authorized only under the identified conditions. To prevent the discharges in Parts 1.3.1 through 1.3.5, operators must comply with the applicable pollution prevention requirements in Part 2.3 or ensure the discharge is authorized by another NPDES permit consistent with Part 1.2.3 for commingled discharges.

1.3.1 Wastewater from washout of concrete, unless managed by an appropriate control as described in Part 2.3.4;

1.3.2 Wastewater from washout and/or cleanout of stucco, paint, form release oils, curing compounds, and other construction materials;

1.3.3 Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;

1.3.4 Soaps, solvents, or detergents used in vehicle and equipment washing or external building washdown; and

1.3.5 Toxic or hazardous substances from a spill or other release.

1.4 SUBMITTING YOUR NOTICE OF INTENT (NOI)

All “operators” (as defined in Appendix A) associated with your construction site who meet the Part 1.1 eligibility conditions, and who seek coverage under this permit, must submit to EPA a complete and accurate NOI in accordance with the deadlines in Table 1 prior to commencement of construction activities (as defined in Appendix A).

Exception: If you are conducting construction activities in response to a public emergency (e.g., mud slides, earthquake, extreme flooding conditions, widespread disruption in essential public services), and the related work requires immediate authorization to avoid imminent endangerment to human health, public safety, or the environment, or to reestablish essential public services, you may discharge on the condition that a complete and accurate NOI is submitted within 30 calendar days after commencing construction activities (see Table 1) establishing that you are eligible for coverage under this permit. You must also provide documentation in your Stormwater Pollution Prevention Plan (SWPPP) to substantiate the occurrence of the public emergency pursuant to Part 7.2.3i.

1.4.1 Prerequisite for Submitting Your NOI

You must develop a SWPPP consistent with Part 7 before submitting your NOI for coverage under this permit.

1.4.2 How to Submit Your NOI

You must use EPA’s NPDES eReporting Tool (NeT) to electronically prepare and submit your NOI for coverage under the 2022 CGP unless you received a waiver from your applicable EPA Regional Office.

To access NeT, go to https://cdx.epa.gov/cdx.

Waivers from electronic reporting may be granted based on one of the following conditions:

If your operational headquarters is physically located in a geographic area (i.e., ZIP code or census tract) that is identified as under-served for broadband Internet access in the most recent report from the Federal Communications Commission; or

If you have limitations regarding available computer access or computer capability.

If the EPA Regional Office grants you approval to use a paper NOI, and you elect to use it, you must complete the form in Appendix H.

1.4.3 Deadlines for Submitting Your NOI and Your Official Date of Permit Coverage

Table 1 provides the deadlines for submitting your NOI and the official start date of your permit coverage, which differ depending on when you commence construction activities.

https://cdx.epa.gov/cdx

Table 1 NOI Submittal Deadlines and Official Start Date for Permit Coverage.

Type of Operator NOI Submittal Deadline8 Permit Authorization Date9

Operator of a new site (i.e., a site where construction activities commence on or after February 17, 2022)

At least 14 calendar days before commencing construction activities.

14 calendar days after EPA notifies you that it has received a complete NOI, unless EPA notifies you that your authorization is delayed or denied.

Operator of an existing site (i.e., a site with 2017 CGP coverage where construction activities commenced prior to February 17, 2022)

No later than May 18, 2022. 14 calendar days after EPA notifies you that it has received a complete NOI, unless EPA notifies you that your authorization is delayed or denied.

Provided you submit your NOI no later than May 18, 2022, your authorization under the 2017 CGP is automatically continued until you have been granted coverage under this permit or an alternative NPDES permit, or coverage is otherwise terminated.

New operator of a permitted site (i.e., an operator that through transfer of ownership and/or operation replaces the operator of an already permitted construction site that is either a “new site” or an “existing site”)

At least 14 calendar days before the date the transfer to the new operator will take place.

14 calendar days after EPA notifies you that it has received a complete NOI, unless EPA notifies you that your authorization is delayed or denied.

Operator of an “emergency-related project” (i.e., a project initiated in response to a public emergency (e.g., mud slides, earthquake, extreme flooding conditions, disruption in essential public services), for which the related work requires immediate authorization to avoid imminent endangerment to human health or the environment, or to reestablish essential public services)

No later than 30 calendar days after commencing construction activities.

You are considered provisionally covered under the terms and conditions of this permit immediately, and fully covered 14 calendar days after EPA notifies you that it has received a complete NOI, unless EPA notifies you that your authorization is delayed or denied.

8 If you miss the deadline to submit your NOI, any and all discharges from your construction activities will continue to be unauthorized under the CWA until they are covered by this or a different NPDES permit. EPA may take enforcement action for any unpermitted discharges that occur between the commencement of construction activities and discharge authorization.

9 Discharges are not authorized if your NOI is incomplete or inaccurate or if you are not eligible for permit coverage.

1.4.4 Modifying your NOI

If after submitting your NOI you need to correct or update any fields, you may do so by submitting a “Change NOI” form using NeT. Waivers from electronic reporting may be granted as specified in Part 1.4.2. If the EPA Regional Office has granted you approval to submit a paper NOI modification, you may indicate any NOI changes on the same NOI form in Appendix H.

When there is a change to the site’s operator, the new operator must submit a new NOI, and the previous operator must submit a Notice of Termination (NOT) form as specified in Part 8.3.

The following modifications to an NOI form will result in a 14-day review process:

• Changes to the name of the operator;

• Changes to the project or site name;

• Changes to the estimated area to be disturbed;

• Changes to the name of the receiving water10, or additions to the applicable receiving waters;

10 As defined in Appendix A, a “receiving water” is “a “Water of the United States” as defined in 40 CFR §122.2 into which the regulated stormwater discharges.

• Changes to eligibility information related to endangered species protection or historic preservation;

• Changes to information provided related to the use of chemical treatment at your site; and

• Changes to answers provided regarding the demolition of structures over 10,000 square feet of floor space built or renovated before January 1, 1980.

During the 14-day review process, you may continue to operate based on the information provided in your original NOI, but you must wait until the review period has ended before you may commence or continue activities on any portion of your site that would be affected by any of the above modifications, unless EPA notifies you that the authorization is delayed or denied.

1.4.5 Your Official End Date of Permit Coverage

Once covered under this permit, your coverage will last until the date that:

You terminate permit coverage consistent with Part 8; or You receive permit coverage under a different NPDES permit or a reissued or replacement version of this permit after expiring on February 16, 2027; or

You fail to submit an NOI for coverage under a reissued or replacement version of this permit before the deadline for existing construction sites where construction activities continue after this permit has expired.

1.5 REQUIREMENT TO POST A NOTICE OF YOUR PERMIT COVERAGE

You must post a sign or other notice of your permit coverage at a safe, publicly accessible location in close proximity to the construction site. The notice must be located so it is visible from the public road that is nearest to the active part of the construction site, and it must use a font large enough to be readily viewed from a public right-of-way.11 At a minimum, the notice must include:

11 If the active part of the construction site is not visible from a public road, then place the notice of permit coverage in a position that is visible from the nearest public road and as close as possible to the construction site.

The NPDES ID (i.e., permit tracking number assigned to your NOI and the EPA webpage where a copy of the NOI can be found (https://permitsearch.epa.gov/epermit-search/ui/search));

A contact name and phone number for obtaining additional construction site information;

The Uniform Resource Locator (URL) for the SWPPP (if available), or the following statement: “If you would like to obtain a copy of the Stormwater Pollution Prevention Plan (SWPPP) for this site, contact the EPA Regional Office at [include the appropriate CGP Regional Office contact information found at https://www.epa.gov/npdes/contact-us-stormwater#regional];” and

The following statement “If you observe indicators of stormwater pollutants in the discharge or in the receiving water, contact the EPA through the following website:

https://www.epa.gov/enforcement/report-environmental-violations.”

2 TECHNOLOGY-BASED EFFLUENT LIMITATIONS

You must comply with the following technology-based effluent limitations in this Part for all authorized discharges.12

12 For each of the effluent limits in Part 2, as applicable to your site, you must include in your SWPPP (1) a description of the specific control(s) to be implemented to meet the effluent limit; (2) any applicable design specifications; (3) routine maintenance specifications; and (4) the projected schedule for installation/implementation. See Part 7.2.6.

2.1 GENERAL STORMWATER CONTROL DESIGN, INSTALLATION, AND MAINTENANCE

REQUIREMENTS

You must design, install, and maintain stormwater controls required in Parts 2.2, 2.3, and

2.4 to minimize the discharge of pollutants in stormwater from construction activities.13 To meet this requirement, you must:

13 The permit does not recommend or endorse specific products or vendors.

2.1.1 Account for the following factors in designing your stormwater controls:

The expected amount, frequency, intensity, and duration of precipitation;14

14 Stormwater controls must be designed using the most recent data available to account for recent precipitation patterns and trends.

The nature of stormwater runoff (i.e., flow) and run-on at the site, including factors such as expected flow from impervious surfaces, slopes, and site drainage features.

You must design stormwater controls to control stormwater volume, velocity, and peak flow rates to minimize discharges of pollutants in stormwater and to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points; and

The soil type and range of soil particle sizes expected to be present on the site.

https://permitsearch.epa.gov/epermit-search/ui/search https://www.epa.gov/npdes/contact-us-stormwater#regional https://www.epa.gov/enforcement/report-environmental-violations

If your site is exposed to or has previously experienced major storms, such as hurricanes, storm surge, extreme/heavy precipitation, and flood events, you should also include consideration of and contingencies for whether implementing structural improvements, enhanced/resilient stormwater controls, and other mitigation measures may help minimize impacts from stormwater discharges from such major storm events.

2.1.2 Design and install all stormwater controls in accordance with good engineering practices, including applicable design specifications.15

15 Design specifications may be found in manufacturer specifications and/or in applicable erosion and sediment control manuals or ordinances. Any departures from such specifications must reflect good engineering practices and must be explained in your SWPPP. You must also comply with any additional design and installation requirements specified for the effluent limits in Parts 2.2, 2.3, and 2.4.

2.1.3 Complete installation of stormwater controls by the time each phase of construction activities has begun.

By the time construction activity in any given portion of the site begins, install and make operational any downgradient sediment controls (e.g., buffers, perimeter controls, exit point controls, storm drain inlet protection) that control discharges from the initial site clearing, grading, excavating, and other earth-disturbing activities.16

16 Note that the requirement to install stormwater controls prior to each phase of construction activities for the site does not apply to the earth disturbance associated with the actual installation of these controls.

Operators should take all reasonable actions to minimize the discharges of pollutants during the installation of stormwater controls.

Following the installation of these initial controls, install and make operational all stormwater controls needed to control discharges prior to subsequent earth-disturbing activities.

2.1.4 Ensure all stormwater controls are maintained and remain in effective operating condition during permit coverage and are protected from activities that would reduce their effectiveness.

Comply with any specific maintenance requirements for the stormwater controls listed in this permit, as well as any recommended by the manufacturer.17

17 Any departures from such maintenance recommendations made by the manufacturer must reflect good engineering practices and must be explained in your SWPPP.

If at any time you find that a stormwater control needs routine maintenance (i.e., minor repairs or other upkeep performed to ensure the site’s stormwater controls remain in effective operating condition, not including significant repairs or the need to install a new or replacement control), you must immediately initiate the needed work, and complete such work by the close of the next business day. If it is infeasible to complete the routine maintenance by the close of the next business day, you must document why this is the case and why the repair or other upkeep to be performed should still be considered routine maintenance in your inspection report under Part 4.7.1c and complete such work no later than seven (7) calendar days from the time of discovery of the condition requiring maintenance.

If you must repeatedly (i.e., three (3) or more times) make the same routine maintenance fixes to the same control at the same location, even if the fix can be completed by the close of the next business day, you must either:

Complete work to fix any subsequent repeat occurrences of this same problem under the corrective action procedures in Part 5, including keeping any records of the condition and how it was corrected under Part 5.4; or

Document in your inspection report under Part 4.7.1c why the specific reoccurrence of this same problem should still be addressed as a routine maintenance fix under this Part.18

18 Such documentation could include, for example, that minor repairs completed within the required timeframe are all that is necessary to ensure that the stormwater control continues to operate as designed and installed and that the stormwater control remains appropriate for the flow reaching it.

If at any time you find that a stormwater control needs a significant repair or that a new or replacement control is needed, you must comply with the corrective action deadlines for completing such work in in Part 5.2.1c.

2.2 EROSION AND SEDIMENT CONTROL REQUIREMENTS

You must implement erosion and sediment controls in accordance with the following requirements to minimize the discharge of pollutants in stormwater from construction activities.

2.2.1 Provide and maintain natural buffers and/or equivalent erosion and sediment controls for discharges to any receiving waters that is located within 50 feet of the site’s earth disturbances.

Compliance Alternatives. For any discharges to receiving waters located within 50 feet of your site’s earth disturbances, you must comply with one of the following alternatives:

Provide and maintain a 50-foot undisturbed natural buffer; or

Provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by erosion and sediment controls that achieve, in combination, the sediment load reduction equivalent to a 50-foot undisturbed natural buffer; or

If infeasible to provide and maintain an undisturbed natural buffer of any size, implement erosion and sediment controls to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.

See Appendix F, Part F.2 for additional conditions applicable to each compliance alternative.

Exceptions. See Appendix F, Part F.2 for exceptions to the compliance alternatives.

2.2.2 Direct stormwater to vegetated areas and maximize stormwater infiltration and filtering to reduce pollutant discharges, unless infiltration would be inadvisable due to the underlying geology (e.g., karst topography) and ground water contamination concerns, or infeasible due to site conditions.19

19 Operators should consider whether factors such as specific contaminant concerns from the construction site, the underlying soils or geology, hydrology, depth to the ground water table, or proximity to source water or wellhead protection area(s) make the site unsuitable for infiltrating construction stormwater. Site conditions that may be of particular concern include proximity to: a current or future drinking water aquifer; a drinking water well or spring (including private/household wells); highly conductive geology such as karst; known pollutant hot spots, such as hazardous waste sites, landfills, gas stations, brownfields; an on-site sewage system or underground storage tank; or soils that do not allow for infiltration. Operators may find it helpful to consult EPA’s Drinking Water Mapping Application to Protect Source Waters (DWMAPS).

DWMAPS is an online mapping tool that can be used to locate drinking water providers, potential sources of contamination, polluted waterways, and information on protection initiatives in the site area.

https://www.epa.gov/sourcewaterprotection/drinking-water-mapping-application-protect-source-waters-dwmaps#What

2.2.3 Install sediment controls along any perimeter areas of the site that are downslope from any exposed soil or other disturbed areas.20

20 Examples of perimeter controls include filter berms; different types of silt fence such as wire-backed silt fence, super silt fence, or multi-layer geotextile silt fence; compost filter socks; gravel barriers; and temporary diversion dikes.

The perimeter control must be installed upgradient of any natural buffers established under Part 2.2.1, unless the control is being implemented pursuant to Part 2.2.1a.ii-iii;

To prevent stormwater from circumventing the edge of the perimeter control, install the perimeter control on the contour of the slope and extend both ends of the control up slope (e.g., at 45 degrees) forming a crescent rather than a straight line;

After installation, to ensure that perimeter controls continue to work effectively:

Remove sediment before it has accumulated to one-half of the above-ground height of any perimeter control; and

After a storm event, if there is evidence of stormwater circumventing or undercutting the perimeter control, extend controls and/or repair undercut areas to fix the problem.

Exception. For areas at “linear construction sites” (as defined in Appendix A) where perimeter controls are infeasible (e.g., due to a limited or restricted right-of-way), implement other practices as necessary to minimize pollutant discharges to perimeter areas of the site.

2.2.4 Minimize sediment track-out.

Restrict vehicle use to properly designated exit points;

Use appropriate stabilization techniques21 at all points that exit onto paved roads;

21 Examples of appropriate stabilization techniques include the use of aggregate stone with an underlying geotextile or non-woven filter fabric, and turf mats.

Exception: Stabilization is not required for exit points at linear utility construction sites that are used only episodically and for very short durations over the life of the project, provided other exit point controls22 are implemented to minimize sediment track-out;

22 Examples of other exit point controls include preventing the use of exit points during wet periods;

minimizing exit point use by keeping vehicles on site to the extent possible; limiting exit point size to the width needed for vehicle and equipment usage; using scarifying and compaction techniques on the soil;

and avoiding establishing exit points in environmentally sensitive areas (e.g., karst areas; steep slopes).

Implement additional track-out controls23 as necessary to ensure that sediment removal occurs prior to vehicle exit; and

23 Examples of additional track-out controls include the use of wheel washing, rumble strips, and rattle plates.

Where sediment has been tracked-out from your site onto paved roads, sidewalks, or other paved areas outside of your site, remove the deposited sediment by the end of the same business day in which the track-out occurs or by the end of the next business day if track-out occurs on a non-business day. Remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. You are prohibited from hosing or sweeping tracked-out sediment into any constructed or natural site drainage feature, storm drain inlet, or receiving water.24

24 Fine grains that remain visible (e.g., staining) on the surfaces of off-site streets, other paved areas, and sidewalks after you have implemented sediment removal practices are not a violation of Part 2.2.4.

2.2.5 Manage stockpiles or land clearing debris piles composed, in whole or in part, of sediment and/or soil:25

25 The requirements in Part 2.2.5 do not apply to the storage of rock, such as rip rap, landscape rock, pipe bedding gravel, and boulders. Refer to Part 2.3.3a for the requirements that apply to these types of materials.

Locate the piles outside of any natural buffers established under Part 2.2.1 and away from any constructed or natural site drainage features, storm drain inlets, and areas where stormwater flow is concentrated;

Install a sediment barrier along all downgradient perimeter areas of stockpiled soil or land clearing debris piles;26

26 Examples of sediment barriers include berms, dikes, fiber rolls, silt fences, sandbags, gravel bags, or straw bale.

For piles that will be unused for 14 or more days, provide cover27 or appropriate temporary stabilization (consistent with Part 2.2.14);

27 Examples of cover include tarps, blown straw and hydroseeding.

You are prohibited from hosing down or sweeping soil or sediment accumulated on pavement or other impervious surfaces into any constructed or natural site drainage feature, storm drain inlet, or receiving water.

2.2.6 Minimize dust. On areas of exposed soil, minimize dust through the appropriate application of water or other dust suppression techniques to control the generation of pollutants that could be discharged in stormwater from the site.

2.2.7 Minimize steep slope disturbances. Minimize the disturbance of “steep slopes” (as defined in Appendix A).28

28 Where disturbance to steep slopes cannot be avoided, operators should consider implementing controls suitable for steep slope disturbances that are effective at minimizing erosion and sediment discharge (e.g., preservation of existing vegetation, hydraulic mulch, geotextiles and mats, compost blankets, earth dikes or drainage swales, terraces, velocity dissipation devices). To identify slopes and soil types that are of comparatively higher risk for sediment discharge in areas of the country where the CGP is in effect, operators can use the tables in Appendix F (see Tables F-2 thru F-6).

2.2.8 Preserve native topsoil, unless infeasible.29

29 Stockpiling topsoil at off-site locations, or transferring topsoil to other locations, is an example of a practice that is consistent with the requirements in Part 2.2.8. Preserving native topsoil is not required where the intended function of a specific area of the site dictates that the topsoil be disturbed or removed. For example, some sites may be designed to be highly impervious after construction, and therefore little or no vegetation is intended to remain, or may not have space to stockpile native topsoil on site for later use, in which case it may not be feasible to preserve topsoil.

2.2.9 Minimize soil compaction.30 In areas of your site where final vegetative stabilization will occur or where infiltration practices will be installed:

30 Minimizing soil compaction is not required where the intended function of a specific area of the site dictates that it be compacted.

Restrict vehicle and equipment use in these locations to avoid soil compaction; and

Before seeding or planting areas of exposed soil that have been compacted, use techniques that rehabilitate and condition the soils as necessary to support vegetative growth.

2.2.10 Protect storm drain inlets.

Install inlet protection measures that remove sediment from discharges prior to entry into any storm drain inlet that carries stormwater from your site to a receiving water, provided you have authority to access the storm drain inlet.31 Inlet protection measures are not required for storm drain inlets that are conveyed to a sediment basin, sediment trap, or similarly effective control; and

31 Inlet protection measures can be removed in the event of flood conditions or to prevent erosion.

Clean, or remove and replace, the inlet protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised.

Where there is evidence of sediment accumulation adjacent to the inlet protection measure, remove the deposited sediment by the end of the same business day in which it is found or by the end of the following business day if removal by the same business day is not feasible.

2.2.11 Control stormwater discharges, including both peak flowrates and total stormwater volume, to minimize channel and streambank erosion and scour in the immediate vicinity of discharge points.32

32 Examples of stormwater controls that can be used to comply with this requirement include the use of erosion controls and/or velocity dissipation devices (e.g., check dams, sediment traps), within and along the length of a constructed site drainage feature and at the outfall to slow down stormwater.

2.2.12 If you install a sediment basin or similar impoundment:

Situate the basin or impoundment outside of any receiving water. and any natural buffers established under Part 2.2.1;

Design the basin or impoundment to avoid collecting water from wetlands;

Design the basin or impoundment to provide storage for either:

The calculated volume of runoff from a 2-year, 24-hour storm;33 or

3,600 cubic feet per acre drained.

33 Operators may refer to https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates for guidance on determining the volume of precipitation associated with their site’s local 2-year, 24-hour storm event.

Utilize outlet structures that withdraw water from the surface of the sediment basin or similar impoundment, unless infeasible;34

34 The circumstances in which it is infeasible to design outlet structures in this manner are rare. Exceptions may include areas with extended cold weather, where using surface outlets may not be feasible during certain time periods (although they must be used during other periods). If you determine that it is infeasible to meet this requirement, you must provide documentation in your SWPPP to support your determination, including the specific conditions or time periods when this exception will apply.

Use erosion controls and velocity dissipation devices to prevent erosion at inlets and outlets; and

Remove accumulated sediment to maintain at least one-half of the design capacity and conduct all other appropriate maintenance to ensure the basin or impoundment remains in effective operating condition.

2.2.13 If using treatment chemicals (e.g., polymers, flocculants, coagulants):

Use conventional erosion and sediment controls before and after the application of treatment chemicals. Chemicals may only be applied where treated stormwater is directed to a sediment control (e.g., sediment basin, perimeter control) before discharge.

Select appropriate treatment chemicals. Chemicals must be appropriately suited to the types of soils likely to be exposed during construction and present in the discharges being treated (i.e., the expected turbidity, pH, and flow rate of stormwater flowing into the chemical treatment system or area).

Minimize discharge risk from stored chemicals. Store all treatment chemicals in leak-proof containers that are kept under storm-resistant cover and surrounded by secondary containment structures (e.g., spill berms, dikes, spill containment pallets), or provide equivalent measures designed and maintained to minimize the potential discharge of treatment chemicals in stormwater or by any other means (e.g., storing chemicals in a covered area, having a spill kit available on site and ensuring personnel are available to respond expeditiously in the event of a leak or spill).

Comply with State/local requirements. Comply with applicable State and local requirements regarding the use of treatment chemicals.

Use chemicals in accordance with good engineering practices and specifications of the chemical provider/supplier. Use treatment chemicals and chemical treatment systems in accordance with good engineering practices, and with dosing specifications and sediment removal design specifications provided by the provider/supplier of the applicable chemicals, or document in your SWPPP specific departures from these specifications and how they reflect good engineering practice.

Ensure proper training. Ensure all persons who handle and use treatment chemicals at the construction site are provided with appropriate, product-specific training prior to beginning application of treatment chemicals. Among other things, the training must cover proper dosing requirements.

Perform additional measures specified by the EPA Regional Office for the authorized use of cationic chemicals. If you have been authorized to use cationic chemicals at your site pursuant to Part 1.1.9, you must perform all additional measures as conditioned by your authorization to ensure the use of such chemicals will not result in discharges that do not meet water quality standards.

2.2.14 Stabilize exposed portions of the site. Implement and maintain stabilization measures (e.g., seeding protected by erosion controls until vegetation is established,35 sodding, mulching, erosion control blankets, hydromulch, gravel) that minimize erosion from any areas of exposed soil on the site in accordance with Part.

35 If you will be evaluating the use of some type of erosion control netting to the site as part of your site stabilization, EPA encourages you to consider employing products that have been shown to minimize impacts on wildlife. For instance, the U.S. Fish & Wildlife Service provides recommendations on the type of netting practices that are considered “wildlife friendly,” including those that use natural fiber or 100 percent biodegradable materials and that use a loose weave with a non-welded, movable jointed netting, as well as those products that are not wildlife friendly including square plastic netting that are degradable (e.g., photodegradable, UV-degradable, oxo-degradable), netting made from polypropylene, nylon, polyethylene, or polyester. Other recommendations include removing the netting product when it is no longer needed.