This solicitation is for bridge repair work on the East Fork Toklat River Bridge within Denali National Park in Alaska. Key details include:
-
The work includes concrete spall repair, drainage improvements including scupper extensions and a trench, bearing replacement, jacking and temporary support of bridge girders, and installation of a gabion basket retaining wall. Estimated quantities and unit pricing are provided for various work items.
-
The location of the work is Milepost 43.50 on the Denali Park Road over the East Fork Toklat River. Construction drawings show general notes, existing conditions, repair details, reinforcing schedules, and erosion control plans.
-
The soliciting agency is the Federal Highway Administration within the Department of Transportation. The document provides project background, specifications, plans, and other technical details required to complete the bridge repair scope of work.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETS
AK A.1
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
Project Location
Projects, FP-03 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
PROJECT MANAGER
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
STATE PROJECT
NUMBER
SHEET
d e a a .d g n
U
S S u r
D
R J o h n s o n
C h e c k e d b y
S m it
D e s ig n e d b y e (max)
V
ADT (2033)
ADT (2013)
B. CHON
9 10
KENAI
FJORDS
N.P.
LAKE CLARK
NAT’L PARK
WRANGELL-
ST. ELIAS
NAT’L PARK
DENALI
NATIONAL
PARK
ALASKA KEY MAP
SOUTH CENTRAL
C A
N A
D A
U N I T
E
S T
A T
E S
Junction
Delta
FAIRBANKS
Tok
Glennallen
Valdez
Cordova
Whittier
ANCHORAGE
Palmer
Kenai
Homer
Seward
Hot Springs
Manley Hot Springs
Circle
N
DENALI
NATIONAL
PARK
DENALI
NATIONAL
PARK
HEALY
KANTISHNA
R.15 W.R.16 W.R.17 W.R.18 W.
T .1
S
T .1
S
E A S
T F
O R
K T O
K L A T
RIVER
DENALI PARK
R O
A D
F a ir b a n k s m i.
A n c h o ra g e m i.
10 5 0 10 20
SCALE IN MILES
DENALI NATIONAL PARK AND PRESERVE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
PRA-DENA 10(29)
PROJECT LOCATION
(See Vicinity Map for details)
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
NPS PMIS NO. 164259A
AK PRA DENA 10(29)
T O
K L A T R
IV
E R
0.060
35 MPH
<200
<150
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
ROAD BRIDGE REPAIRS
EAST FORK TOKLAT RIVER
Bridge and abutment rehabilitation and
TEMPORARY TRAFFIC CONTROL
D. EROSION CONTROL
C. BRIDGE DETAILS
B. SUMMARIES
A. GENERAL INFORMATION
E.1
D.2
D.1
C.9
C.8
C.7
C.6
C.5
C.4
C.3
C.2
C.1
B.1
A.3
A.2
A.1
CONTROL ADVANCE SIGNING
STD. DRWG. 635-1, TEMPORARY TRAFFIC
SILT FENCE DETAILS
OF QUANTITIES
EROSION CONTROL PLAN AND TABULATION
GABION FACED WALL DETAILS
GABION BASKET DETAILS
MISCELLANEOUS DETAILS
BEARING DETAILS
PIER RETROFIT DETAILS
PIER JACKING DETAILS
ABUTMENT RETROFIT DETAILS
GENERAL NOTES AND TYPICAL SECTIONS
PLAN AND ELEVATION
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
09/11/12
09/12/12
/s/ Brent Coe
/s/ Elwood Lynn
/s/ Joel Hard for for
09/19/12
RECOMMENDED:
APPROVED:
National Park Service
Regional Director, Alaska Region, DATE
DATE
Western Federal Lands Highway Division
Acting Director, Project Delivery, DATE
Denali National Park and Preserve
Superintendent, DENALI BOROUGH, ALASKA
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009
W101-1
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
AND ABBREVIATIONS
PLAN SYMBOLS
AK A.2
NUMBER
STATE
PROJECT
P
A u g u s t
U c m y fi le s p w p r o d u c ti o n d d e a b .d g n
U.S. CUSTOMARY DETAIL
DETAIL
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PRA DENA 10(29)
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
PROPOSEDEXISTING
Trail
Lake, Pond or Reservoir; Marshland
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Building
Riprap
N
Transition
Toe of Fill
Top of Cut
Spring or Seep
LC
Concrete Barrier
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, BH
CP GPS
JH
TP
Material Source; Bore Hole; Test Pit
DI
Slope Stake Limits
Pipe Culvert with Drop Inlet
Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Box Culvert
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Right-of-Way Line with Monument
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Permanent Easement
Construction Easement
36 31
6 1
Section Corner (Found, Projected)
36 31
6 1
SEC.
SEC.
Property Line w/Found Property Corner
400Parcel Number
Large Creek or River
EL. 1234.56
N
E
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
RIP
Boulder; Well; Satellite Dish; Grave
- no symbol -wall face
G G
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
W W
Silt Fence
DI
Wattle
T T
Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Ø spiral central angle diameter curve central angle total central angle appr.
AH
ADT
abut.
brg.
br.
BP
BM
BK
approach ahead average daily traffic abutment bearing bridge balance point bench mark back ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
M.P.
M.L.
mile post main line
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Section Line4
Section Line16
Section Corner (Found, Projected)4
Section Corner (Found, Projected)16
Railroad
Intermittent Drainage or Small Creek
Signs (single, double post; portable)
NO SCALE
Control Point (Terrestrial and GPS); Jump Hub a th e d ra l
M o u n ta in
Mtn.
Igloo
Mountain
Sable
DENALI NATIONAL PARK WILDERNESS
Tributary
C re e k
Pass
Polychrome
Po ly ch ro m e
M ou nt ai n
T O
K L A T
RIVER
1 0 1 2 3 4
D
EN
A
LI
P
A R K R
O A D
Cabin
Ranger
Ig lo o C re e k
T O
K L
A T
R
IV
E R
E A S
T F
O R
K
C r e e k
B ig
AK PRA DENA 10(29) A.3
VICINITY MAP
SCALE IN MILES
0.5
Pass
Sable
To Mile 70 Pit d e a c .d g n
U
S S u r
D
J o h n s e c k e d b y
S m s ig n e d b y
PROJECT LOCATION
m ile s
To G eo rg e P ar ks H wy 3
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
M.P. 43.5
ROAD BRIDGE REPAIRS
EAST FORK TOKLAT RIVER
POLYCHROME PASS
TOKLAT PIT
MP 53
SOURCE AND STAGING
PROVIDED MATERIAL
OPTIONAL GOV’T
MP 45.3 to 45.4
SOURCE AND STAGING
PROVIDED MATERIAL
OPTIONAL GOV’T
B.1
AK
PRA DENA 10(29)
d e n a b a .d g n
U
S S u r ft
J o h n s e c k e d b y
S m s ig n e d b y
SUMMARY OF QUANTITIES
‡63501-0000 ‡TEMPORARY TRAFFIC CONTROL ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡57501-0000 ‡MINOR BRIDGE WORK (SCUPPER EXTENSIONS) ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡57501-0000 ‡MINOR BRIDGE WORK (DRAINAGE TRENCH) ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡57501-0000 ‡MINOR BRIDGE WORK (CONCRETE SPALL REPAIR) ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡57501-0000 ‡MINOR BRIDGE WORK (RESIN BONDED ANCHOR SYSTEM) ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡57501-0000 ‡MINOR BRIDGE WORK (BEARING REMOVAL) ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡56401-1000 ‡BEARING DEVICE, ELASTOMERIC ‡ EACH ‡ 8 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 8 ‡ 8 ‡
‡56202-0000 ‡TEMPORARY SUPPORT STRUCTURE ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡55501-0000 ‡STRUCTURAL STEEL ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡55401-1000 ‡REINFORCING STEEL ‡ LB ‡ 1250 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 1250 ‡ 1,300 ‡
‡55201-0200 ‡STRUCTURAL CONCRETE, CLASS A (AE) ‡ CUYD ‡ 8 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 8 ‡ 9 ‡
‡25301-1000 ‡GABIONS, GALVANIZED OR ALUMINIZED COATED ‡ SQFT ‡ 90 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 90 ‡ 100 ‡
‡20801-0000 ‡STRUCTURE EXCAVATION ‡ CUYD ‡ 22 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 22 ‡ 25 ‡
‡15705-0100 ‡SOIL EROSION CONTROL, SILT FENCE ‡ LNFT ‡ ‡ 50 ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ 50 ‡ 50 ‡
‡15501-0000 ‡CONSTRUCTION SCHEDULE ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15401-0000 ‡CONTRACTOR TESTING ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15301-0010 ‡CONTRACTOR QUALITY CONTROL AND ASSURANCE ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15201-0000 ‡CONSTRUCTION SURVEY AND STAKING ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡15101-0000 ‡MOBILIZATION ‡ LPSM ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ALL ‡ ALL ‡
‡ ITEM ‡ DESCRIPTION ‡ UNIT ‡ ‡Plans ‡Control ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ PLAN ‡ SCHEDULE ‡
‡˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜‡Rehab ‡Control ‡ Traffic ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ BID ‡
‡ ‡Bridge ‡Erosion ‡Temporary‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡------------------------‡
‡ PLAN SHEET SECTION -------->>‡Section C‡Section D‡Section E‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ‡ ESTIMATED QUANTITIES ‡
Õ˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝Ñ˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝˝‚
PLAN AND ELEVATION
L
ELEVATION VIEW
PLAN VIEW
WORK ITEMS:
ITEM NUMBER DESCRIPTION QUANTITIES NOTESUNITS
ESTIMATE:
ESTIMATE NOTES:
T o k la t
R iv e r
E a s t F o rk
C P ie r
S ta
.5
C P ie r
S ta
.5
L L LL
C Roadway
CONCEPTUAL CONSTRUCTION SEQUENCE:
3 1 2
1 2 at face of wing wall Approx. finish ground line
(from as-built plans) at face of wing wall Approx. rock line ground line at C roadway Approx. profile of natural
L
Begin Bridge Sta. 7+01.07
End Bridge Sta. 9+83.93
BRIDGE REPAIRS
EAST FORK TOKLAT RIVER
DENALI PARK ROAD, M.P. 43.50
C w e s t
A b u t.
S ta
.0
55° typ.
C e a s t
A b u t.
S ta
.0
EAST FORK TOKLAT RIVER BRIDGE REPAIRS
(11)
(10)
(9)
(8)
(7)
(6)
(5)
(4)
(3)
(2)
(1)
(11)
(10)
(9)
(8)
(7)
(6)
(5)
(4)
(3)
(2)
(1)
57501-0000
57501-0000
57501-0000
57501-0000
57501-0000
56401-1000
56202-0000
55501-0000
55401-1000
55201-0200
25302-1000
20801-0000
MINOR BRIDGE WORK (SCUPPER EXTENSIONS)
MINOR BRIDGE WORK (DRAINAGE TRENCH)
MINOR BRIDGE WORK (CONCRETE SPALL REPAIR)
MINOR BRIDGE WORK (RESIN BONDED ANCHOR SYSTEM)
MINOR BRIDGE WORK (BEARING REMOVAL)
BEARING DEVICE, ELASTOMERIC
TEMPORARY SUPPORT STRUCTURE
STRUCTURAL STEEL
REINFORCING STEEL
STRUCTURAL CONCRETE, CLASS A (AE)
GABIONS, GALVANIZED OR ALUMINIZED COATED
STRUCTURE EXCAVATION
Type A, typ.
Type B
Type A, typ.
at the northeast corner of the bridge.
Excavate, construct gabion basket retaining wall, and backfill4.
abutment, construct drainage trench, and install scupper extensions.
Repair concrete spall in back wall at north corner of west3.
Repeat procedure at Pier 2.j.
Remove temporary work access platforms.i.
After jacking is complete, re-open bridge to vehicles.
Close bridge to vehicles and transfer load to new bearings. h.
Pour grout pad and install new bearings.g.
Construct concrete shear blocks and pedestals.f.
Weld new sole plates to girders.e.
Remove existing steel rocker bearings.d.
girders to 3/8�.
jacking is complete, re-open bridge to vehicles. Limit lifting of
Close bridge to vehicles and transfer load to jacks. After c.
temporary jacks (55T min. safe working load per jack).
Install jacking stiffeners, temporary jacking supports, and b.
Install temporary work access platforms at Pier 1.a.
Piers:2.
Remove temporary work access platforms.c.
Construct bearing seat extensions.b.
Install temporary work access platforms at each abutment.a.
Abutments:1.
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
RG2954-A
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
M. Miller1"=30’-0"M. MillerA. O’DonnellQ. Nguyen
NO. DATE BY REVISIONS
BRIDGE DRAWING
1 of 7 September 2012
DATE
DRAWING NO.
C.1
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(29)
T O
K L
A T
.d g n s h e e t]
See detail on sheet C.7.
Install scupper extensions, Type A=19 locations, Type B=1 location.
scupper, approximately 13’-6" total length. See detail on sheet C.7.
Construct drainage trench along curb line between end of bridge and first
See detail on sheet C.7.
Install gabion basket retaining wall, 15’ long x 6’ tall nominal.
Repair spalled backwall concrete. See SCR Section 575.05.
Construct bearing seat extension.
Construct reinforced concrete shear blocks.
concrete pedestals.
Remove and replace rocker bearings with elastomeric bearing pads on
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
LPSM
LPSM
LPSM
LPSM
LPSM
EA
LPSM
LPSM
LB
CUYD
SQFT
CUYD
Fabrication and installation of 20 scupper extensions. Approximately 535 lbs of steel.
Removal of 13’-6" x 6" x 1/2" deep deck concrete.
Patching spall at NW corner backwall, 1’-6"x1’-4"x3" nominal.
Resin bonded anchors for shear blocks and seat extensions.
8 rocker bearings at piers.
Bearing replacement of 4 girder lines at Pier 1 and Pier 2.
Temporary work access, jack supports, and jacking operations.
Jacking stiffeners, approximately 1510 lbs.
Shear blocks/bearing pedestals at piers and seat extension at abutments.
15’ long x 6’ tall nominal. Approx. 10 CUYD
Required for gabion wall construction.
To Main Entrance
To Wonder Lake
NOTE:
1.
abutment.
Do not distrub USGS benchmark on Southwest
OHW
Span 5
28’-11"
Span 4
68’-6"
Span 3
88’-0"
Span 2
68’-6"
Span 1
28’-11"
H o r iz
C lr
R a il
R a il
Existing backwall
SECTION C-C
LC Roadway
C
C
LC Girder girder Existing
LC Abut.
C Abut.L C GirderL
BRIDGE REPAIRS
EAST FORK TOKLAT RIVER
DENALI PARK ROAD, M.P. 43.50
into existing concrete Drill and resin bond
ABUTMENT RETROFIT DETAILS
of abutment extend to limits extension, Bearing seat
A403 extension cast in place with seat anchors for jacking support.
Drill and resin bond
See Section E-E.
2 locations only.
Stagger anchors at
LC Girder
(drill and resin bond) A401 typ.
A402
A401
A403
A401
SECTION E-E
A401
E
E
MARK SIZE NO. LENGTH TYPE BENDING DIAGRAMS
6" 12"
1’-6" 2’ -2
1’-6" 2’ -4
3- A402
3- A405
4- A406
2 Locations only.
end of abutment.
Stagger as shown at north into existing concrete.
Drill and resin bond
A401
A403
A405 A406
REINFORCEMENT SCHEDULE - ABUTMENTS
VIEW D-D
D
D
1’-8"
12"
3- A402 bearing seat elevation to match existing
Bearing seat extension
A402 A406
A402
A403
"2
A406
A405
A403
A402
A401
3’-10"
3’-8"
"2
2’-9
29’-4"
2’-2"
Bent
Bent
Bent
Bent
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
RG2954-C
M. MillerNTSM. MillerA. O’DonnellQ. Nguyen
3 of 7 September 2012
C.3
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(29)
T O
K L
A T
.d g n s h e e t]
(NORTH ABUTMENT SIMILAR)
SOUTH ABUTMENT
BEARING SEAT EXTENSION PLAN
3"
1’-0"
1’-0" c lr c lr
Embed
10"
S p a
S p a
S p a
S p a
S p a
S p a
S p a
S p a
S p a .6
145°0’0" 145°0’0"
S p a
S p a
L
SECTION A-A
C Roadway support Temporary jack
C GirderL
C GirderL
BRIDGE REPAIRS
EAST FORK TOKLAT RIVER
DENALI PARK ROAD, M.P. 43.50
jack Temporary
VIEW C-C
girder Existing
B
B
PIER JACKING DETAILS
L C Brg.
C Pier =
L seat not shown for clarity.
Reinforcing bars below bearing Note:
A
MC13x50, typ.
MC13x50
"x6"x6", typ.2
Washer plate cope at channel connection
"x11"x1’-1"4 3Stiffener
"x1’-0"x1’-9"4
Bearing plate
L jacking support, typ.
jack and temporary C TemporaryL
C
C distance for jacking determine required Contractor to
Each stiffener
A
C GirderL
VIEW B-B
MC13x50
"x6"x6", typ.2
Washer plate cope at channel connection
"x11"x1’-1"4 3Stiffener
"x1’-0"x1’-9"4
Bearing plate
L
PARTIAL PLAN
TEMPORARY JACKING
see detail rocker bearings, Remove existing
"x11"x1’-1", typ.4 3Stiffener
"x1’-0"x1’-9"4 3Bearing plate see detail rocker bearings, Remove existing see detail rocker bearings, Remove existing jacking support jack and temporary C Girder/ temporary jacking support jack and temporary C Girder/ temporary
ROCKER BEARING REMOVAL DETAIL
Bottom flange cover plate Bottom flange
Sole plate to remain
Grind smooth after removal masonary plate Remove rocker and
Top of pier
NOTES:
1.
safe working load, typ.
Temporary jack, 55 T min.
safe working load Temporary jack, 55 T min.
safe working load Temporary jack, 55 T min.
L
LLocate beneath C girder, typ.
temporary jacking support.
C Temporary jack and jack and temporary jacking assembly, typ.
Working point of girder/temporary high-strength rod threaded
" Ø Temporary4 high-strength rod threaded
" Ø Temporary4 high-strength rod threaded
" Ø Temporary4
1 to bearing plate, typ.
Channel edge to bearing plate, typ.
Channel edge
N see details Jacking stiffeners, 2.
3.
4.
NPS PMIS No. 164259A NPS Drwg. No. 184/80286operations are complete.
Jacking stiffeners are to remain in place after jacking
Class ’B’ facing surfaces (blast cleaned surface) or better.
Jacking stiffener bolted connections shall be slip critical with simultaneously to avoid loading the pier eccentrically.
Operate jacks on both sides of the pier at any one girder
".8 more than
Limit differential displacement between any two jacks to be no
". 8
Limit vertical displacement during jacking to no more than
RG2954-D
4 of 7 September 2012
C.4
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(29)
T O
K L
A T
.d g n s h e e t]
Tight fit stiffener plate
" jacking2 1"x48
52-stiffener plate
" jacking2 1"x48
52-
JACKING STIFFENER DETAIL
SECTION THROUGH GIRDER SECTION D-D
D D plate to bear Mill stiffener
Connection angle, typ.
"2 1 3"x3"x in std. holes
" Ø A325 bolts16
Connection angle
"2 14- 3"x3"x
Tight fit plate to bear Mill stiffener
Connection angle, typ.
"2 1 3"x3"x in std. holes
" Ø A325 bolts16
PROFILE
Girder web
Point of jacking
Girder flange
" thick)2 1Existing web (~
C Jacking stiffener and temporary jack L max.
6"
1’-8"
4"3"3"3"3"4"
1’-8"
7"3"3"3"4" typ.
"2 typ.
"2
1’-0" p ie r p ie r m ax.
6" ty p typ.
"2 typ.
"4 typ.
"4
C GirderL
D
D
VIEW D-D
girder Existing
BRIDGE REPAIRS
EAST FORK TOKLAT RIVER
DENALI PARK ROAD, M.P. 43.50
C GirderL
PIER RETROFIT DETAILS
bearing pedestal shear block and Reinforced concrete
B
B
VIEW A-A VIEW B-B
surface Roughened surface Roughened girder Existing
C PierL C PierL surface Roughened
NOTES:
REINFORCEMENT SCHEDULE - PIERS
MARK SIZE NO. LENGTH TYPE BENDING DIAGRAMS
B102
B103 B104
B100
B100
B101
3- B102
B102 B102
B103
B103
B102
B104
6" typ.
existing concrete, bond 4" into Drill and resin typ.
existing concrete, bond 4" into Drill and resin typ.
existing concrete, bond 4" into Drill and resin
B102 surface Roughened
B103
B105
VIEW C-C
C
C
C GirderL
B100
3- B102
2" Chamfer
3- B102
B100
3- B101
B103
B104B104
B103
B106
(to remain) Existing anchor bolt
(to remain) anchor bolt Existing
(to remain) anchor bolt Existing
(to remain) anchor bolt Existing
B107 acute corners 2" Chamfer, typ. at
C GirderL
L C Brg.
C Pier =
L
L C Brg.
C Pier =
L
SEAT PLAN
EXTERIOR GIRDER BEARING
SEAT PLAN
INTERIOR GIRDER BEARING
NOTE: Bearing not shown for clarity. NOTE: Bearing not shown for clarity.
see details on sheet ___ Elastomeric bearing pad, " min. grout pad2 11 (to remain), typ.
anchor bolt Existing
(to remain), typ.
anchor bolt Existing see details on sheet C.6 Elastomeric bearing pad,see details on sheet C.6
Elastomeric bearing pad, " min. grout pad2
" min. grout pad2
Top of pier
Top of pier concrete, typ.
4" into existing Drill and resin bond
B107 placing concrete.
brush and coat with a zinc rich primer prior to Clean exposed existing anchor bolts with a wire laitance prior to placing concrete.
amplitude and clean surface so that it is free of
" 4
Roughen surface of existing concrete to cutting edges on the diameter.
cor drill or carbide bit rotary hammer with four Drill into existing concrete using a diamond bit 1.
2.
3.
B107
B106
B105
B104
B103
B102
B101
B100 8"
2’-2"
B107
1’-11"
145°0’0"
B106
3’-3"
3’-2"
3’-4"
1’-2"
3’-6"
3’-6"
4’-1"
2’-2"
Bent
Bent
Bent
Bent
Bent
B105
B106
B105
3- B101
4- B100 4- B100
4- B100
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
RG2954-E
5 of 7 September 2012
C.5
STATE PROJECT
NUMBER
SHEET
AK PRA DENA 10(29)
T O
K L
A T
.d g n s h e e t]
4"11"11"4"
2’-2"
1’-1" 1’-1" typ.
2" typ.
2" typ.
2"
4"11"11"4" typ.
2"
1’-1" 1’-1"
2’-2"
"2 13’-7
"4 39 1’-0""4
391’-0"
"4 348" "4
34 7" 7" 8" typ.
2" typ.
2" typ.
2" typ.
2"
"8 33’-0
"8 38 1’-4"1’-0"
1’-1"
1’-1" typ.
2"
2’-6" Pier
1’-1"
1’-1"
"16
2’-6" Pier typ.
2"
"8
8" 7" 7" 7"
DETAIL APPROVED FOR USE --/----
DRAFT: 9/2011
REVISED:
W253-1
NPS PMIS NO.: XXXXX DRAWING NO.: XXX-XXXXX
GABION BASKET
0.150" DIAMETER
(CUYD)
1.0
1.0
1.0
1.5
1.5
1.5
3.0
3.0
3.0
3.0
3.0
1.33
1.00
0.67
2.00
1.50
1.00
6.00
5.00
4.00
3.00
2.00
, 1 5’, o r 1
8’
6’, 9’, 12’
1" overlap
0.118" wire diameter
0.118" wire diameter
Size in feet
0.087" diameter lacing wire
0.150" diameter
0.120" diameter mesh wires
Tie mesh with 0.150" diameter selvage hitch loops at 3" spacing
Tie mesh with 0.150" diameter
0.150" diameter
A u g u s t
U m y fi le s p w p r o d u c ti o n d d e n a fh .d g n
STATE PROJECT
NUMBER
C.8
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
NO SCALE
TYPICAL INSTALLATION GABION BASKETS
SPIRAL BINDER
ALTERNATE TYING FASTENERS
GABION BASKET
TYPICAL ASSEMBLED
WALL GRADE TRANSITION AREAS
ASSEMBLED GABION BASKET IN
TYPICAL CULVERT INSTALLATION
ALL GABION CELLS
ALL END GABION CELLS ALL INTERIOR GABION CELLS
HALF HITCH LACING DETAIL
OVERLAPPING RING WIRE FASTENER
THROUGH GABION WALL
TYPICAL STIFFENERS
WELDED WIRE GABION BASKET
OPTIONAL STIFFENERS
Side
End
Base
Side
Stiffeners
WELDED WIRE MESH TWISTED WIRE MESH
back to outside diameter of culvert.
Cut wire basket mesh front and Culvert
CL
Cut wire basket mesh front and back. Lid
BEFORE CLOSURE AFTER CLOSURE
(Not allowed for basket to basket connection)
End
Side
Side
Base
Lid
Diaphragms
NOMINAL SIZES AND CAPACITY
GABION BASKET
Letter
Size Code
Length Height Partitions
Diaphragm Capacity
I
H
G
F
E
D
Y
X
C
B
A
(Twisted wire mesh)
(Welded wire mesh)
(Welded wire mesh)
SPIRAL BINDER TIE
HALF HITCH LACING DETAIL
INTERLOCKING WIRE FASTENER
BEFORE CLOSURE AFTER CLOSURE
are nominal
All dimensions
NOTE:
are nominal
All dimensions
NOTE:
selvage wires
Diaphragmswith stiffeners to prevent wall bulging wire and connect front and back mesh
Stiffeners each end of stiffener
Loop two meshes at
Diaphragms
Stiffeners
Stiffenershook closed
Crimp end of joint
Crimped joint end of
Crimped double half hitch wire to next
Continuous lacing
Single half hitch to next single half hitch
Continuous lacing wire
Le ng th
Crimp ends to lock
Spiral binder.
half hitches as shown
Alternate single and double
Double half hitch.
Lacing Details)
Lacing wire (see Lacing Details)
Lacing wire (see
Lacing wire. Tie with half stiffeners to prevent wall bulging.
connect front and back mesh with selvage wire around pipe, and intersection of wires stiffener hooked at
"2
Le ng th
6’, or 8’
3’ (ty p.
)3’
3’
3’ ( typ
H e ig h t
3’ 3’
3’
H e ig h t
3’ 3’
12"
12"
12"
.8
.9
.0
1.0"
.8
1.4"
0.45"
(min.)
4’
H e ig h t
3’ 3’
12"
12"
12"
4"– nominal spacing
H e ig h t
H e ig t
DETAIL APPROVED FOR USE --/----
DRAFT: 9/2011
REVISED:
W253-2
GABION FACED WALL
Tie mesh with 0.150" diameter
1" overlap
0.118" wire diameter
0.118" wire diameter
0.150" DIAMETER
6" overlap
0.087" diameter lacing wire
0.150" diameter
0.120" diameter mesh wires
0.150" diameter
(CUYD)
Size in feet hitch loops at 3" spacing
A u g u s t
U m y fi le s p w p r o d u c ti o n d d e n a fi .d g n
STATE PROJECT
NUMBER
C.9
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
NO SCALE
are nominal
All dimensions
NOTE:
are nominal
All dimensions
NOTE:
Culvert
BEFORE CLOSURE AFTER CLOSURE
BEFORE CLOSURE AFTER CLOSURE
(Welded wire mesh)
(Welded wire mesh)
(Twisted wire mesh)
THROUGH GABION WALL
ALL GABION CELLS
ALL END GABION CELLS
WELDED WIRE MESH
ALL INTERIOR GABION CELLS
TWISTED WIRE MESH
HALF HITCH LACING DETAIL
HALF HITCH LACING DETAIL
SPIRAL BINDER TIE
OVERLAPPING RING WIRE FASTENER
INTERLOCKING WIRE FASTENER
ALTERNATE TYING FASTENERS SPIRAL BINDER
TYPICAL INSTALLATION GABION BASKETS
NOMINAL SIZES AND CAPACITY
GABION BASKET
TYPICAL ASSEMBLED GABION BASKET
TYPICAL CULVERT INSTALLATION
Letter
Size Code
Partitions
Diaphragm Capacity
Height Length
Y
X
C
B
A joint end of
Crimped end of joint
Crimped to next single half hitch
Continuous lacing wire selvage wires
Single half hitch double half hitch wire to next
Continuous lacing each end of stiffener
Loop two meshes at
Stiffeners
Stiffeners
Lacing Details)
Lacing wire (See
Diaphragms
Side
End
Side
Base
CL
intersection of wires stiffener hooked at
Crimp hook closed
Diaphragms
Lid
Stiffeners
WELDED WIRE GABION BASKET
OPTIONAL STIFFENERS
TYPICAL STIFFENERS
stiffeners to prevent wall bulging.
connect front and back mesh with selvage wire around pipe, and back to outside diameter of culvert.
Cut wire basket mesh front and
Lacing wire. Tie with half half hitches as shown
Alternate single and double
Double half hitch.
Crimp ends to lock
Spiral binder.
4"– nominal spacing
"2
H e ig h t
3’ 3’
3’ 3’
H e ig h t
3’
3’ 3’
H e ig h t
Le ng th
6’, or 8’
3’
3’ (ty p.
4’ (min.)
12"
12"
12"
12"
12"
12"
.0
.8
"0.45"
.8
.9
1.4"
1.0"
H e ig t
TABULATION OF QUANTITIES
AND
EROSION CONTROL PLAN
Silt fence, typ.
T o k la t
R iv e r
E a s t
F rk
BEGIN BRIDGE
7+01.07
9+83.93
END BRIDGE
RoadwayLC
PLAN
NO SCALE
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
D.1
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fa .d g
C h e c k e d b y
D e s ig n e d b y
STANDARD NO SCALE
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
STATE
D.2
PROJECT
d e n a fb .d g n
U
S C u s to m a r y
STANDARD APPROVED FOR USE 6/2005
REVISED: 6/2007
SILT FENCE
157-1
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
NPS PMIS No. 164259A NPS Drwg. No. 184/80286
NOTE:
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow
Fi ll slo pe
Flow
T o e o f s lo p e
Flow
Flow
(undisturbed)
Existing ground
Limits of clearing
Geotextile, type V-A
Support mesh
Steel or wood post
See Note 4 for spacing
Backfilled and compacted soil around the end of the silt fence prevent water from flowing
Provide sufficient length to
See Note 1
SILT FENCE INSTALLATION IN A DRAINAGE DITCH
around the ends.
of silt fence upgrade to prevent water from running
Install silt fence along ground contours. Curve ends does not slide down, supporting posts.
types must ensure silt fence remains attached to, and recommendations for installation procedures. All dimensions are satisfied. Follow manufacturer’s type V-B) will be allowed as long as specified
Alternate preassembled silt fence options (geotextile, only when specified on Erosion Control Plan.
Use drainage ditch installation for low flow conditions
4.
3.
2.
1.
m in m in m in
6" min. trench
4" min.
Varies
Varies fo r s p a c in g
S e e n o te
SIGNS IN FEET
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2010
REVISED:
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
STANDARD
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE
E.1
PROJECT
S e p te m b e r
U m y fi le s p w p r o d u c ti o n d s t6
.d g n xx
ROAD WORK
NEXT MILES
ROAD
WORK
xx FT
ROAD
WORK
xx FT xx
ROAD WORK
NEXT MILES
ROAD
WORK
xx FT
ROAD
WORK
xx FT
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
NOTE:
NO SCALE
ROAD WORK
END
WORK
AHEAD
ROAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
AHEAD
ROAD
WORK
AHEAD
ROAD
ROAD NAME
ROAD NAME
See Note 10
W20-1
See Note 10
W20-1
G20-2
Expressway / Freeway retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
A
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
| East-Fork-Toklat.pdf |
| A-01 |
| A-02 |
| A-03 |
| C-01 |
| C-02 |
| C-03 |
| C-04 |
| C-05 |
| C-06 |
| C-07 |
| C-08 |
| C-09 |
| C-10 |
| D-01 |
| D-02 |
File details come from the government source that posted it. Updated .