This amendment modifies a solicitation for complex bridge construction and earthwork improvements at Polychrome Area in Alaska. The Department of Transportation Federal Highway Administration seeks offers for projects including experience with bridges over 250 feet in nonprefabricated truss, cable stayed, concrete segmental, or arch designs; contracts over $15 million constructing bridges; constructing bridges in constricted areas with limited access; complex bridge erection using temporary towers, suspension cables, incremental launching or gantry cranes; and accelerated bridge construction using prefabricated components. Offerors must demonstrate experience on five projects, with three from the prime contractor, using enclosed forms for bridge and earthwork/foundations experience. The amendment revises experience requirements and is issued to clarify instructions to offerors.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
Amendment A004.pdf PDF
QA_10-31-2022.pdf PDF
QA_10-28-2022.pdf PDF
QA_10-20-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-12-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-11-2022.pdf PDF
QA_10-06-2022.pdf PDF
9830-010P - UPPER IGLOO CREEK - PLANS.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
Pages P-1 through P-4.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
RFP-69056722R000015.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 1-360.pdf PDF
AKNPSDENA_Preliminary_Plans.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - PLANS.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - PLANS.pdf PDF
SWPPP Template.pdf PDF
9830-009P - LOWER IGLOO CREEK INSPECTION REPORT 2021.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - PLANS.pdf PDF
National Park Service_FONSI_20220314_508.pdf PDF
DENA Rating Trucks.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - PLANS.pdf PDF
PolychromeAreaImprovementsEA_20220113.pdf PDF
AKNPSDENA_Preliminary_Design Narrative.pdf PDF
AK NPS DENA 10(49) FHWA FONSI Final Signed.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - PLANS.pdf PDF
EXAMPLE PREVIOUS CONSTRUCTION PERMIT LOADS DENALI PARK ROAD.pdf PDF
Polychrome_Project Delivery Plan.pdf PDF
Polychrome_Project Delivery Plan_Appendices_J-L.pdf PDF
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - PLANS.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
MtMcKinley Road Cultrual Landscape Report 121418.pdf PDF
9830-009P - LOWER IGLOO CREEK PLANS.pdf PDF
GR 06-22-Geotechnical Modeling Report-FINAL-Rev1.pdf PDF
Load Rating - Blank Excel Template summary tables.xlsx XLSX spreadsheet
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - INSPECTION REPORT 2021.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
9830-010P - UPPER IGLOO CREEK - INSPECTION REPORT 2021.pdf PDF
9830-011P - GHIGLIONE BRIDGE - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 361-937.pdf PDF
Denali National Park Bridge Location Map and Key.pdf PDF
Polychrome_Project Delivery Plan_ Appendices_A-I.pdf PDF
AKNPSDENA_Preliminary_XSections.pdf PDF
9830-011P - GHIGLIONE BRIDGE - PLANS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A003 10/28/2022 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056722R000015

9B. DATED (SEE ITEM 11)

08/03/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK NPS DENA 10(49), Polychrome Area Improvements

Amendment A002 is issued to revise the following:

INSTRUCTIONS TO OFFERORS

Page ITO-17, Subsection 6.2.2.2.1, Subfactor A Complex Bridge Construction Experience (175 Points). Revises Element 6 in Table.

ENCLOSURES: Page ITO-17

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

ITO-17

6.2.2.2 Factor 2 Experience (400 Points)

6.2.2.2.1 Subfactor A Complex Bridge Construction Experience (175 Points)

Submit completed “Form E1 – Project Experience Bridge” to demonstrate past experience with complex bridge construction. Submit five projects maximum. Three (3) out of the five (5) projects submitted for experience must be projects completed by the prime contractor.

Element

Element (must have been completed after 2012)

Points

Experience working on a complex* bridge construction

Experience with contracts over $15 million constructing bridges for state or federal government agencies

Experience constructing bridges in constricted work areas with limited access

Experience with complex* bridge erection using temporary towers, suspension cables, incremental launching or gantry crane launching

Experience on bridge construction projects in arctic and/or subarctic regions

Experience on projects with bridges that have foundation with ground anchors or micropiles

Accelerated Bridge Construction (ABC) – experience with prefabricated bridge components that are fabricated offsite and assembled at the bridge location

*Complex Bridge – bridge type = non‐pre‐fabricated truss bridge (min 250’ span), cable stayed bridge (min 250’ span), concrete segmental min 250’ (length), or arch (concrete or steel w/ min. 250’ span length).

6.2.2.2.2 Subfactor B Earthwork and Foundations Experience (125 points)

Submit completed “Form E2 – Project Experience Earthwork and Foundations” to demonstrate past experience with Rock Excavation. Submit five projects maximum. Projects submitted for experience may be from the prime contractor or subcontractors.

Revised by Amendment A003

CMGC, Instructions to Offerors AK NPS DENA 10(49), Polychrome Area Improvements