This document contains a bridge inspection report for the Upper Igloo Creek Bridge located in Denali National Park and Preserve in Alaska. The report provides details of the routine inspection conducted on June 21, 2021, including structure inventory and appraisal data, photographs documenting the condition of various bridge components, and a description of the structure. The single-span steel stringer bridge was built in 1956, carries the Denali Park Road over Igloo Creek, and has a deck width of 28 feet. The inspection found the deck and superstructure to be in fair condition while the substructure was rated as satisfactory. Notable defects include peeling paint and rust on the steel railings and piles, as well as spalling of the deck overhang and erosion around the abutments. The report recommends rehabilitation or reconstruction of the bridge.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
Amendment A004.pdf PDF
QA_10-31-2022.pdf PDF
Amendment A003.pdf PDF
QA_10-28-2022.pdf PDF
QA_10-20-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-12-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-11-2022.pdf PDF
QA_10-06-2022.pdf PDF
9830-010P - UPPER IGLOO CREEK - PLANS.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
Pages P-1 through P-4.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
RFP-69056722R000015.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 1-360.pdf PDF
AKNPSDENA_Preliminary_Plans.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - PLANS.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - PLANS.pdf PDF
SWPPP Template.pdf PDF
9830-009P - LOWER IGLOO CREEK INSPECTION REPORT 2021.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - PLANS.pdf PDF
National Park Service_FONSI_20220314_508.pdf PDF
DENA Rating Trucks.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - PLANS.pdf PDF
PolychromeAreaImprovementsEA_20220113.pdf PDF
AKNPSDENA_Preliminary_Design Narrative.pdf PDF
AK NPS DENA 10(49) FHWA FONSI Final Signed.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - PLANS.pdf PDF
EXAMPLE PREVIOUS CONSTRUCTION PERMIT LOADS DENALI PARK ROAD.pdf PDF
Polychrome_Project Delivery Plan.pdf PDF
Polychrome_Project Delivery Plan_Appendices_J-L.pdf PDF
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - PLANS.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
MtMcKinley Road Cultrual Landscape Report 121418.pdf PDF
9830-009P - LOWER IGLOO CREEK PLANS.pdf PDF
GR 06-22-Geotechnical Modeling Report-FINAL-Rev1.pdf PDF
Load Rating - Blank Excel Template summary tables.xlsx XLSX spreadsheet
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - INSPECTION REPORT 2021.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
9830-011P - GHIGLIONE BRIDGE - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 361-937.pdf PDF
Denali National Park Bridge Location Map and Key.pdf PDF
Polychrome_Project Delivery Plan_ Appendices_A-I.pdf PDF
AKNPSDENA_Preliminary_XSections.pdf PDF
9830-011P - GHIGLIONE BRIDGE - PLANS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

UPPER IGLOO CREEK BRIDGE

DENALI PARK ROAD OVER IGLOO CREEK

DENALI NATIONAL PARK & PRESERVE

LOOKING EAST TOWARD DENALI VISITOR CENTER

STRUCTURE NO. 9830-010P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/21/2021

SOUTH (UPSTREAM) PROFILE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE LOAD RATING STRUCTURE NO. 9830-010P

UPPER IGLOO CREEK BRIDGE INSPECTION DATE: 06/20/2021

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 26 24 44 40

HS 38 34 64 58

TYPE 3 33 30 56 51

TYPE 3S2 53 48 89 81

TYPE 3-3 64 58 106 96

DESIGN LOADING: 3 - HS 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 05/02/2016

LOAD RATING CONTROLLED BY: Moment

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-010P

STRUCTURE IDENTIFICATION

(201) PARK: DENALI NATIONAL PARK & PRESERVE

(202) STRUCTURE NAME:..............UPPER IGLOO CREEK BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........9830-010 P

7 - ALASKA(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................PARK

(211) PROJECT NO(S):................... UNKNOWN

(212) DRAWING NUMBERS:

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

020 - ALASKA

02290 YUKON-KOYUKUK

00000

1 6 1 00000 0

IGLOO CREEK

DENALI PARK ROAD

9830010P0000000

37.18 MILES WEST OF AK ROUTE 3

(MP 237.3) ON DENALI PARK ROAD.

99.99 FT ( 99.99 M)

37.18 (KM PT: 11.33)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........3 - STEEL

(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR

GIRDER

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:..............40 FT ( 12.2 M)

(49) STRUCTURE LENGTH:........... 43.0 FT ( 13.1 M)

(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT

(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT

(217A) PREDOM. PIER FDN:.......... 6 - N/A

(217B) SECOND. PIER FDN:.......... 6 - N/A

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL:............ 0 - Other

(44B) APPR. STR. TYPE:.................... 00 - OTHER

(46) NO OF APPROACH SPANS:

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE:.. 1 - MONOLITHIC CONCRETE

(CONCURRENTLY PLACED WITH

STRUCTURAL DECK)

B) TYPE MEMBRANE:................. 0 - NONE

C) TYPE PROTECTION:.............. 0 - NONE

(218) IS SALT USED?.......................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................3 - HS 15 (41) LOAD RESTRICTION:.................. A - OPEN

(66) INVENTORY RATING:..............27 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 24.5

LOADS

(64) OPERATING RATING:..............45.1 TONS ( 40.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 06/21/2021 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: 09/01/1998 (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-010P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 63° 34'25 30" (51) CURB TO CURB WIDTH:............ 24.0 FT ( 7.3 M)

(17) LONGITUDE:............................149°37 '50.10" (52) DECK WIDTH:.......................... 28.0 FT ( 8.5 M)

(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 30.0 FT ( 9.1 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 24.0 FT ( 7.3 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 3 0 FT ( 0.9 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 3 0 FT ( 0.9 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1300 (34) SKEW ANGLE:......................... 25 °

(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1560 (47) TOTAL HORIZ. CLEARANCE:.. 24 FT ( 7.3 M)

(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 2 3 FT ( 0.7 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 2 3 FT ( 0.7 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 3 - CONCRETE/STEEL

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 33 FT ( 0.71 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF

FOOTING OR PILES

(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 0 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1988-EXPOSED PORTIONS OF STEEL PILES PAINTED.

(231) ADDITIONAL CONSIDERATIONS:

CALCIUM CHLORIDE IS USED ON BRIDGE APPROACHES.

(330) ADDITIONAL CONFIGURATION INFORMATION:

Span #1 - Length 39.7'; Type 302 (Steel Beams) 4-each

Inspector: Jordan Hensley Structure Number: 9830010P0000000

Inpsection Date: 06/21/2021 Facility Carried: DENALI PARK ROAD

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST

PHOTO 4

Description NORTH (DOWNSTREAM) PROFILE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO 6

Description TYPICAL VIEW OF BRIDGE CURB AND RAILING, UPSTREAM SIDE SHOWN

Bridge Inspection Report

Pictures

PHOTO 7

Description TYPICAL PEELING OF PAINT AND RUSTING OF STEEL RAIL, DOWNSTREAM RAIL SHOWN

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 9

Description SPALLING OF DECK OVERHANG ON UPSTREAM SIDE OF EAST ABUTMENT

PHOTO 10

Description TYPICAL BEARING ARRANGEMENT, UPSTREAM BEARING AT EAST ABUTMENT SHOWN

Bridge Inspection Report

Pictures

PHOTO 11

Description GENERAL VIEW OF EAST ABUTMENT

PHOTO 12

Description GENERAL VIEW OF WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 13

Description TYPICAL PEELING OF PAINT ON STEEL H-PILES, WEST ABUTMENT SHOWN

PHOTO 14

Description GNERAL VIEW OF MISSING RIPRAP PROTECTION AT WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 15

Description EROSION OF EMBANKMENT ON UPSTREAM SIDE OF WEST APPROACH

PHOTO 16

Description EROSION OF EMBANKMENT ON DOWNSTREAM SIDE OF WEST APPROACH

Bridge Inspection Report

Pictures

PHOTO 17

Description EAST APPROACH

PHOTO 18

Description WEST APPROACH

Bridge Inspection Report

Pictures

PHOTO 19

Description SOUTH (UPSTREAM) CHANNEL

PHOTO 20

Description NORTH (DOWNSTREAM) CHANNEL