National Park Service_FONSI_20220314_508.pdf
PDF 563 KB Posted
- Attached to
- AK NPS DENA 10(49), Polychrome Area Improvements
- Solicitation number
- 69056722R000015
About this file
This solicitation is for construction services related to improvements in the Polychrome Area of Denali National Park and Preserve in Alaska. The National Park Service and Federal Highway Administration are seeking a contractor to construct a new bridge over the Pretty Rocks Landslide, undertake risk reduction measures at nearby landslide and rockfall areas, and construct retaining walls. Phase I will focus on the highest priority sites including excavation, bridge construction, and geohazard mitigation. Phase II will include additional retaining wall construction and rockfall risk reduction. The response deadline is July 15, 2022, with construction anticipated from 2022 through 2024. The solicitation is set aside for Alaska Native Corporation participation.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service U.S. Department of the Interior
Denali National Park and Preserve Interior Region 11 – Alaska
FINDING OF NO SIGNIFICANT IMPACT
POLYCHROME AREA IMPROVEMENTS
Recommended:
Brooke Merrell, Acting Superintendent Date Denali National Park and Preserve
Approved:
M. Sarah Creachbaum, Regional Director Date Interior Region 11 – Alaska, National Park Service
BROOKE MERRELL Digitally signed by BROOKE MERRELL Date: 2022.03.07 15:33:11 -09'00'
MARY CREACHBAUM Digitally signed by MARY CREACHBAUM Date: 2022.03.10 15:29:50 -09'00'
Denali National Park and Preserve Polychrome Area Improvements Finding of No Significant Impact
2022 Page 2
1 INTRODUCTION
In compliance with the National Environmental Policy Act (NEPA), the National Park Service (NPS) has prepared an Environmental Assessment (EA) in cooperation with the Federal Highway Administration (FHWA) to examine alternative actions and environmental impacts associated with proposed improvements to the Polychrome Area in Denali National Park and Preserve (DENA), Denali Borough, Alaska. The statements and conclusion reached in this Finding of No Significant Impact (FONSI) are based on the documentation and analysis provided in the EA (NPS 2022a), Errata (Appendix A), Response to Comments (Appendix B), and associated decision file. To the extent necessary, relevant sections of the EA are referenced below. Except as noted, references are provided in the EA.
Two alternatives were analyzed in the EA: 1) the No Action Alternative, under which the NPS will not undertake repairs and construction at the Pretty Rocks Landslide, Bear Cave Landslide, Perlite Landslide, and rockfall areas; and there will be no vehicle access through the Polychrome area to the 47 miles of road west of the landslide indefinitely; and 2) the Pretty Rocks Bridge and Polychrome Road Improvements alternative (the NPS preferred alternative), which will restore access through the Polychrome area by constructing a bridge over the Pretty Rocks Landslide (approximately Mile 45.4). This alternative will also involve undertaking risk reduction measures for the Perlite Landslide (approximately Mile 45.3) and rockfall hazards near the proposed bridge, constructing a retaining wall at the Bear Cave Landslide (approximately Mile 44.8), and undertaking risk reduction measures in surrounding rockfall areas.
The project description analyzed in the EA includes the greatest extent of probable actions and quantity estimates that will have the greatest possible impacts to allow for project design flexibility by the design-builder during implementation. The design-build contractor may reduce these impacts as the design progresses.
The NPS preferred alternative was selected after careful analysis of resource impacts, consultation with tribes and Alaska Native Claims Settlement Act Corporations (ANCSA), and review of stakeholder and public comments. The NPS will implement the selected alternative (proposed action/NPS preferred alternative) to restore reliable access to the Park Road west of the Pretty Rocks Landslide and reduce safety hazards in the Polychrome area.
This FONSI is available on the NPS Planning, Environment, and Public Comment (PEPC) website at:
http://parkplanning.nps.gov/polychrome.
2 SELECTED ALTERNATIVE AND RATIONALE FOR THE DECISION
2.1 SELECTED ALTERNATIVE
The NPS has selected the Pretty Rocks Bridge and Polychrome Road Improvements alternative (Alternative 2 [NPS 2022a, 12]) for implementation. This alternative will fulfill a critical need as outlined in the Polychrome Area Improvements EA (NPS 2022a, 3). The project was broken into two phases for budgetary and scheduling reasons, with Phase I addressing the highest priority sites.
2.1.1 Phase I
Excavation. Approximately 125,000 to 150,000 cubic yards of material will be excavated. Excavation of the rock will be accomplished with heavy equipment and blasting. Areas east of the landslide— http://parkplanning.nps.gov/polychrome
2022 Page 3 including the “rock knob” on the south side of the road and the slope on the north side of the road— will be excavated to provide space for bridge construction and equipment.
The slope above the west abutment will be excavated to provide space for construction of the bridge and to accommodate a slight road realignment for vehicles turning on and off the bridge. A portion of this excavation area (less than 1 acre) will be in designated wilderness. The excavation could include a bench cut into the rock partway down the rock face to serve as a rockfall catchment area.
The excavation could also include a road-level rockfall ditch. Periodic maintenance of the bench using heavy machinery would be needed, a small portion of which would be in wilderness.
Excavation may also require heavy equipment to drive up the vegetated slope from the western edge of the project area, which will require temporary access of motorized vehicles through designated wilderness. Measures will be implemented to protect the vegetation from damage by heavy machinery and tracked vehicles. If feasible, equipment may be placed for excavation by helicopter, eliminating the need to drive over vegetation in wilderness. Actions are intended to produce rough irregular rock faces that resemble the surrounding natural rock outcrops while maintaining the integrity of the finished rock cut face to minimize rockfall and rock instability.
Material Placement. After swell is accounted for, the volume of material that will need to be disposed of will be slightly larger than the volume that was excavated. Excavated material that is of sufficient quality for use in road maintenance will be trucked off site and stored in existing DENA material storage locations (such as the Toklat pit) for use on future projects. The majority of the excavated material will be disposed of on site on the slope below the road. Approximately 10 acres of that area will be in wilderness and 0.6 acre will be in streams or wetlands. Some vegetation toward the toe of the landslide will be covered by excavated material. Excavated material will consist of rock and soil similar to what currently exists at the site and will be expected to look similar to existing rock/soil at the landslide. Motorized equipment will be used to move material off the roadway and into the material placement area, which will require temporary use in wilderness.
Road Realignment. On the west side of the bridge, a short section of the road will be realigned slightly to create space for an appropriate turning radius for vehicles entering and exiting the bridge.
The realignment will also include shifting an additional section of road away from the eroding road edge. The realigned road corridor will be entirely outside of designated wilderness and the wilderness boundary will not shift with this realignment.
Retaining Walls. A retaining wall near the east abutment of the Pretty Rocks Bridge will be installed on the slope above the road to reduce the risk of rockfall from the excavated slope. A combination of earthwork, horizontal drains, and possibly a retaining wall will also be required to address the Perlite Landslide on the east side of the Pretty Rocks Landslide. These structures will be outside of wilderness.
Rockfall Risk Reduction. Rockfall areas above the road to the east and west of Pretty Rocks Landslide will be addressed using a combination of rock scaling (i.e., the removal of loose or potentially unstable rocks), installation of rock bolts or dowels, and/or the creation of rockfall ditches. Rock scaling will be designed to match existing surroundings and will be conducted by workers on ropes and performed by hand using prybars; no blasting will be necessary. Installation of rock bolts will include 1 -inch diameter bolts or dowels drilled into the surface and subsurface rock of the cliff face to secure hazardous rocks and will be designed to match surroundings by either staining the bolts or cutting them flush with the rock and grouting over them. Rock scaling and installation of rock bolts will occur in wilderness and will be repeated every 5 to 10 years, or as needed to reduce additional rockfall hazards.
Pretty Rocks Bridge Construction. A bridge will be installed spanning the Pretty Rocks Landslide site. The bridge will be approximately 400 feet long; will have an overall width of approximately 24
2022 Page 4 feet; and will be supported by two abutments, one on each end. Abutments will be steel pilings with ground anchors, which will be drilled or driven into the bedrock and fortified with concrete. The bridge will be one lane and traffic will stop at existing pullouts at either end, yielding to vehicles on the bridge.
A temporary platform will be constructed near the east abutment for use as a bridge assembly location. The platform will extend 150 feet from the south side of the road. The bridge components will be trucked to the site and stored at the temporary platform until assembly. A large crane will be used to assemble the bridge on site. Temporary platform construction will require some pile driving and concrete placement, with several dozen piles needed.
After bridge construction, the temporary platform will be removed, the staging areas will be recontoured, and the road will be restored to its historic road width where possible. Space will be preserved at both abutments for future maintenance needs.
The landscape of this area is changing due to climate change causing permafrost thaw. These changing conditions may affect the longevity of the design (approximately 50 years). Currently, the overall synergy between climate change and effects on the engineered solution is unknown and unpredictable. Additional maintenance projects to retrofit the bridge may be needed in response to climate change. If needed, future design considerations to address the possibility of thawing permafrost under the bridge abutments (such as the use of thermal siphons) will be researched and evaluated to ensure longevity.
Traffic. Road access through Polychrome is not anticipated during Phase I. For safety reasons, only construction traffic will be allowed in the Pretty Rocks area during most construction activities.
Incidental traffic may be facilitated as conditions permit. Visitor transportation will continue to be limited to Mile 43 of the Park Road and buses will turn around at the East Fork Bridge or the East Fork cabin site. Access to Kantishna inholdings will be primarily via air until the bridge is completed.
2.1.2 Phase II
Retaining Wall. At the Bear Cave Landslide area, Phase II will include excavation of materials and construction of a retaining wall on the south side of the Park Road. The retaining wall will be buried approximately 30 to 60 feet deep, run approximately 1,000 feet along the road to stabilize the road edge, and will potentially require several hundred piles. The north side of the Park Road will be temporarily widened to allow traffic to pass around the construction site. Road work will also include subsurface and surface drainage improvements. The retaining wall and road widening/improvements will not be in the wilderness area. After construction of the wall, the area on the north side of the road will be recovered and the road will be returned to the existing roadway centerline and width. Disturbed areas will be revegetated to match the surrounding area. The retaining wall will be minimally visible from the surrounding area, including from backcountry areas south of the road. Equipment and materials for Bear Cave work will be stored at existing staging areas in DENA.
Rockfall Risk Reduction. Rockfall areas above the road to the east and west of the Bear Cave Landslide will be addressed during Phase II using a combination of rock scaling, installation of rock bolts or dowels, and/or the creation of rockfall ditches. Rock scaling will be designed to match existing surroundings and will be conducted by workers on ropes and performed by hand using prybars; no blasting will be necessary. Installation of rock bolts will include 1-inch diameter bolts or dowels drilled into the surface and subsurface rock of the cliff face to secure hazardous rocks and will be designed to match surroundings by either staining the bolts or cutting them flush with the rock and grouting over them. Rock scaling and installation of rock bolts will occur in wilderness and will be repeated every 5 to 10 years, or as needed to reduce additional rockfall hazards.
2022 Page 5
Traffic. Road access through the Polychrome area is anticipated during Phase II. Visitor transportation to destination points west of Pretty Rocks and regular traffic to Kantishna inholdings will be allowed. There may be some traffic delays due to single-lane use or temporary restrictions at the project sites. There could also be scheduled nighttime road restrictions for work to occur.
Because rock scaling and bolting cannot occur in the dark due to safety concerns, road restrictions will be necessary during some daylight hours as well.
2.2 RATIONALE
The NPS selected the Pretty Rocks Bridge and Polychrome Road Improvements alternative for implementation because it best meets the purpose and need to restore access to the western portion of the Park Road beyond the Pretty Rocks Landslide and protect the safety of visitors and staff by reducing geohazard risks along the Polychrome section of the road (NPS 2022a, 3). There will be adverse impacts to DENA resources as a result of the construction activities; however, the NPS has determined these impacts are not significant. The project results in beneficial long-term safety impacts by providing reliable access to visitors, staff, and inholders.
2.3 MITIGATION AND MONITORING
Best management practices (BMPs) and mitigation measures will be used during implementation of the selected alternative to minimize, reduce, or eliminate impacts of project activities and to protect park resources and visitors. These practices and measures will be incorporated into the project implementation documents and plans. Resource protection measures that will be undertaken during project implementation are described in the EA (NPS 2022a, 22-23) and are summarized in Table 1.
The impact analyses in the “Environmental Consequences” section of the EA (NPS 2022a, 22-49) were performed assuming that these BMPs and mitigation measures will be implemented as part of the selected alternative (NPS 2022a, 22).
Table 1. Proposed Mitigation Measures
Resource Area Proposed Mitigation Measures
Socioeconomics Construction workers would be housed in DENA at previously disturbed locations.
Visual Resources The bridge would be designed to be nonreflective and in a neutral color to reduce contrast with surroundings.
The width of the bench cut along the west abutment excavation area would be minimized and have a rough texture.
The retaining walls at the east end of the bridge and Perlite Landslide would resemble natural materials and blend into the landscape, if possible.
Excavation and rock scaling would produce rough, irregular rock faces that resemble the surrounding natural rock.
Revegetation of disturbed areas would be implemented with plants salvaged from the project area and native seeds.
Shielding on construction lighting would be required to eliminate light trespass.
Visitor Use and Experience
Dust management measures would be employed.
2022 Page 6
Resource Area Proposed Mitigation Measures
Noise and Soundscape Broadband amplitude-adjusting backup alarms would be used on construction vehicles to reduce the noise intensity and audible distances.
Vibratory hammers would be used for pile driving, instead of impact hammers, whenever possible.
The driving surface of the bridge would be a closed metal deck topped with a high friction surface to reduce the noise of vehicles on the bridge.
Approach pavement would be included on both ends of the bridge to limit the noise of vehicles coming onto the bridge and driving over the bridge.
Wildlife If ground disturbing activities are conducted during the bird breeding and nesting season, measures would be implemented to avoid disturbance to active nests.
All construction activities would comply with the Migratory Bird Treaty Act and Executive Order 13186.
Construction would halt when certain wildlife are within limits established in the Code of Federal Regulations Section 13.920 to reduce disturbance.
Nest deterrents would be included in the bridge design.
Vehicles that encounter wildlife on the road or proposed bridge would be required to comply with NPS regulations, which give wildlife the right of way.
Wetlands and Vegetation
Dust management measures would be employed.
Revegetation of disturbed areas would be implemented with plants salvaged from the project area and native seeds.
Stormwater and erosion control best management practices would be implemented to protect wetlands and waters during construction, including vegetation buffers and erosion control fencing.
Measures would be implemented to protect the vegetation from damage by heavy machinery and tracked vehicles.
Construction vehicle and equipment inspection would be done prior to entering DENA to ensure invasive/nonnative plant species are not introduced.
Wetland areas within 100 feet of the project area would be flagged and avoided. A
0.01 acre wetland area above the road in the Phase I project area would be avoided.
Cultural Resources The above measures to reduce visual impacts would be implemented.
Mitigation for adverse effects would include creating a video of the book “Snapshots From the Past” and conducting at least 10 oral history interviews with road users.
Rock bolts would be designed to match surroundings by cutting them flush with the rock and either staining the bolts or grouting over them.
The road realignment on the west side of the proposed bridge would be consistent with the curvilinear design of the existing road.
The historic road width (16 to 24 feet) would be restored once construction is complete.
Wilderness Wilderness areas within 100 feet of the established project area would be identified and avoided.
Measures would be implemented to protect the wilderness areas from damage by heavy machinery and tracked vehicles.
The above measures to reduce visual impacts, as well as impacts to visitor experience, soundscape, wildlife, and vegetation in wilderness areas would be implemented
2022 Page 7
3 POTENTIALLY AFFECTED ENVIRONMENT AND DEGREE OF THE
EFFECTS
The selected alternative will not have a significant adverse impact on the human environment. This conclusion is based on the following examination of the relevant significance criteria defined in 40 CFR Section 1501.6. The NPS reviewed each of these criteria given the environmental impacts described in the EA (NPS 2022a, Chapter 3).
3.1 POTENTIALLY AFFECTED ENVIRONMENT
Endangered Species Act. In accordance with the Endangered Species Act of 1973, the NPS requested an official list of the federally threatened and endangered species and designated critical habitats that may occur in the Polychrome Area Improvements project area from the U.S. Fish and Wildlife Service (USFWS). On October 1, 2021, the USFWS provided a list that confirmed no federally listed species or designated critical habitats occur in the project area (NPS 2022a, Appendix B). Therefore, the selected alternative will not adversely affect any listed threatened or endangered species or critical habitat.
National Historic Preservation Act (NHPA). The cultural resources identified in the vicinity of the project area (NPS 2022a, 44 - 46) include portions of the Mount McKinley National Park Road Historic District (HEA-00517/ HEA-00429) and Cultural Landscape, the East Fork Patrol Cabin Site (HEA-00218) and Cultural Landscape; the East Fork Bridge; and a historic archeology site (HEA-00323) that consists of a collection of historic metal cans that may be associated with the building of the road. The Park Road Historic District and Cultural Landscape are listed on the National Register of Historic Places (National Register). The selected alternative will result in long-term changes to the historic character of the Polychrome section of road, which is considered an adverse effect per the NHPA and its implementing regulations (36 CFR Part 800). While this impact is adverse, the selected alternative will keep the road maintained and accessible to the public and enable continued access to rural viewscapes, which is the key historic association that makes the Park Road eligible for the National Register and will minimize long-term effects to the historic property. The NPS developed a Memorandum of Agreement with the Alaska State Historic Preservation Officer (SHPO) and consulting parties (NPS 2022b) to mitigate the adverse effects through the creation of a video based on the book “Snapshots From the Past” and through oral history interviews with road users. The selected alternative will not impact the East Fork Patrol Cabin Site and Cultural Landscape or the East Fork Bridge because they are not within the project area and the construction will not be visible from those sites. The historic archeology site (HEA-00323) will be documented prior to Phase II and periodic archeological monitoring and documentation may occur during construction. If cultural resources or items protected by the Native American Graves Protection and Repatriation Act are discovered during project implementation, all project-related activities in the vicinity of the discovery will be stopped and the park archaeologist will be notified immediately. In consultation with the State Historic Preservation Officer and other consulting parties, the NPS will determine a course of action per 36 CFR Part 800.13.
3.2 DEGREE OF EFFECTS
As described in the EA, (NPS 2022a, 22-49), the selected alternative has potential beneficial and adverse impacts—both short and long term—associated with geology, socioeconomics, visual resources, visitor use and experience, noise and soundscape, wildlife, wetlands and vegetation, 2022 Page 8 cultural resources, and wilderness. The are no wild and scenic rivers, ecologically critical areas, or floodplains in the project area (NPS 2022a, 11).
General construction measures and BMPs to proactively minimize environmental impacts and mitigation measures to further reduce impacts are described in the EA (NPS 2022a, 22-23). No significant impacts to resources that will require analysis in an environmental impact statement were identified.
The selected alternative does not establish a precedent for future actions with significant effects nor does it represent a decision in principle about a future consideration. All elements of the selected alternative are common management actions conducted at national parks.
In the context of determining significance, “controversial” refers to circumstances where a substantial dispute exists as to the environmental consequences of the proposed action and does not refer to the existence of opposition to a proposed action, the effect of which is relatively undisputed (43 CFR Part 46.30). Throughout the EA process, no environmental impacts associated with the selected alternative have been identified as controversial. The NPS conducted internal and external outreach and provided two public comment periods (October 2021 and January 2022) and a comment period for the NHPA Assessment of Effect (November through December 2021).
Comments were solicited from agencies, tribes, Alaska Native Claims Settlement Act (ANCSA) corporations, and the public. The NPS has not received substantive comments disputing the environmental consequences disclosed in the EA (NPS 2022a, 22-49).
As analyzed in the EA, the anticipated impacts to the human environment are not highly uncertain or unique and do not involve unknown risks. Resource conditions in the project area are well known and the anticipated impacts from implementing the selected alternative are understood based on NPS experience with similar projects, with a few exceptions described below.
The potential long-term impact to wildlife from noise as vehicles travel over the newly constructed steel bridge is unknown. Noise emanating from the bridge as vehicles drive across is projected to be relatively unchanged from current conditions. Because wildlife are already accustomed to the sound of vehicles driving along the Park Road, noise impacts from the bridge to wildlife species and their habitat are not expected to be significant. Therefore, the selected alternative is anticipated to have no long-term adverse effects on Migratory Bird Treaty Act (MBTA) and Bald and Golden Eagle Protection Act (BGEPA) protected avian species (NPS 2022a, 38). As described in the EA, it is unknown how many piles will be necessary and the final quantity of piles will affect the total duration of noise generation in the study area (NPS 2022a, 35). The specific timing, frequency, and duration of potential blasting and pile driving activities are not known at this time. However, BMPs and mitigation will be used to lessen disturbance to wildlife, reduce the indirect impact of noise on the visitor experience, and reduce noise introduced to the soundscape (NPS 2022a, 22). Therefore, the NPS finds that the selected alternative will not result in significant adverse impacts.
Geology. Bridge construction, excavation, rock scaling, and rock bolt installations at the Pretty Rocks Landslide site will permanently alter existing rock formations and modify the topography of slopes surrounding the roadbed (NPS 2022a, 27). Disposal of excavated rocky material on the lower portion of the Pretty Rocks Landslide will result in a permanent increase in the accumulated material on the slope, which may continue to migrate downslope on top of the active slide. Unstable slopes above the road will be excavated/modified to less steep conditions and loose rocks will be removed or secured, which will temporarily stabilize slopes and reduce rockfall. Similarly, the installation of retaining walls will slow down or delay localized erosion and landslide movement. However, construction of the bridge over the Pretty Rocks Landslide will allow the landslide to pass underneath and associated processes to continue unimpeded, indefinitely. Rock scaling, which may need to be repeated every 5 to 10 years for maintenance, will further reduce the risk of rockfall and
2022 Page 9 increase safety by removing rock and sediment (NPS 2022a, 27). Therefore, there will be an overall long-term beneficial impact to geology. The selected alternative will not result in significant adverse impacts on geology.
Socioeconomics. The existing condition includes restricted access west of Mile 43 due to the Pretty Rocks Landslide, which is adversely affecting the local, state, and regional economy due to reduced income generated by Kantishna businesses, and park concessioners. However, this impact exists regardless of which alternative is selected and the effects to socioeconomics will be short term under the selected alternative. General mitigation measures and BMPs are described in Section 3.1 of the EA (NPS 2022a, 22). This project will incorporate these mitigation measures and BMPs, including the identification of areas where construction workers will be housed. After completion of Phase I of the selected alternative, there will be a long-term beneficial impact to socioeconomics because reliable access to Kantishna and other popular visitor destinations west of the project area will be restored. Implementation of the selected alternative will not result in significant adverse impacts on socioeconomics.
Visual Resources. During construction, impacts to visual resources will be short term but adverse due to the inconsistency of construction activities in areas where the focus is generally on the natural landscapes rather than human development. The selected alternative will also have a long-term impact on visual resources in the project area and surrounding viewpoints (NPS 2022a, Appendix D, 16-20). The new bridge, bench cut, and retaining walls will introduce bold straight lines and smooth textures that contrast with the existing landscape; however, mitigation measures to blend features into the landscape will reduce contrast (NPS 2022a, 22 and 32). Material placed below the road will appear larger in size and extent than the existing landslide material on the slope, but similar in color.
Excavation and rock scaling will produce rough irregular rock faces that resemble the surrounding rock, and the retaining wall at Bear Cave will be partially buried and therefore minimally visible.
Mitigation measures and BMPs that will include design features to reduce contrast and blend the excavation area and rock scaling to the natural surroundings are described in Section 3.1 of the EA (NPS 2022a, 22 and 32). This project will incorporate these mitigation measures and BMPs by reference, and the implementation of the selected alternative will restore reliable access and enable visitors enjoyment of the views from the western 47 miles of the Park Road, resulting in a long-term beneficial impact. With the incorporation of mitigation measures and BMPs, the selected alternative will not result in significant adverse impacts on visual resources.
Visitor Use and Experience. The current road closure at Mile 43 impacts the roughly 234,000 visitors that typically access the areas west of Pretty Rocks Landslide each year. However, this restriction of access will occur regardless of which alternative is selected and will be short term under the selected alternative. Short-term impacts as a result of construction of the selected alternative will include increased noise, increased exposure to dust, increased views of construction activities, and decreased wildlife viewing opportunities, which may decrease visitor satisfaction.
General mitigation measures and BMPs are described in Section 3.1 of the EA (NPS 2022a, 22). This project will incorporate these mitigation measures and BMPs by reference, including dust management measures that will be employed during construction. Alterations to visual resources in the project area could either positively or negatively affect visitor experience, but mitigation measures to reduce long-term visual resource impacts will reduce visitor experience impacts as well.
After completion of Phase I, there will be a long-term beneficial impact to visitor experience because reliable access to the 47 miles of Park Road and popular visitor destinations west of the project area will be restored (NPS 2022a, 34). Based on incorporation of mitigation measures and BMPs, the selected alternative will not result in significant adverse impacts on visitor use and experience.
Noise and Soundscape. The selected alternative will generate short-term changes to the existing acoustic environment because construction vehicles, earth-moving equipment, and power tools will
2022 Page 10 generate noise during construction. General mitigation measures and BMPs are described in Section 3.1 of the EA (NPS 2022a, 22). This project will incorporate these mitigation measures and BMPs by reference (such as broadband amplitude-adjusting backup alarms on construction vehicles and the use of vibratory hammers for pile driving when practicable), which will reduce the short-term impacts associated with construction. Design features will mitigate and reduce the noise of vehicles on the bridge following construction, and noise levels in the park generated by use of the improved road are expected to return to conditions prior to the road closure in 2021 (NPS 2022a, 36). Through the use of mitigation measures and BMPs, selected alternative will not result in significant adverse impacts on noise and soundscape.
Wildlife. The selected alternative has the potential to impact a variety of wildlife species in and around the project area. Short-term adverse impacts will include displacement caused by increased human activity, dust, and construction noise (especially from drilling, pile driving, and blasting).
Mitigation measures and BMPs for wildlife are described in Section 3.1 of the EA (NPS 2022a, 23).
This project will incorporate these mitigation measures and BMPs by reference, limiting displacement and disturbance by temporarily ceasing construction activities if bears, moose, caribou, sheep, or wolves approach within established limits. The Pretty Rocks Landslide is in a historic golden eagle nesting territory that was occupied as recently as 2021 and construction activities could potentially result in loss of productivity or nest, which will be mitigated through a permit with the USFWS. There may also be short-term adverse impacts beyond the immediate project area as a result of increased construction traffic along the first 43 miles of the Park Road.
Long-term adverse impacts of the project will include localized habitat loss due to excavation and placement of excavated material on vegetation below the road. The potential need for periodic rock scaling activities (anticipated every 5 to 10 years) may create recurring disturbances to wildlife, especially Dall’s sheep, but may be less than the current maintenance activities. Overall, impacts to wildlife are anticipated to affect a few individuals in the project area; there are no anticipated adverse population-level impacts from the selected alternative (NPS 2022a, 37-39). By implementing mitigation measures and BMPs, the selected alternative will not result in significant adverse impacts on wildlife.
Wetlands and Vegetation. Wetlands in the project area will be avoided to the greatest extent practicable, but the selected alternative will directly and permanently impact up to 0.60 acre of low-to moderate-functioning wetlands and approximately 1,000 linear feet of low- to moderate-functioning streams (NPS 2022a, 42-43). Mitigation measures and BMPs for wetlands and vegetation are described in Section 3.1 of the EA (NPS 2022a, 23). This project will incorporate these mitigation measures and BMPs by reference, employing dust management measures; revegetating disturbed areas with plants salvaged from the project area and native seeds; using vegetation buffers and erosion control fencing; protecting vegetation from damage by heavy machinery; inspecting equipment for invasive/nonnative species; and flagging and avoiding wetland areas. Although the selected alternative will affect wetlands on the toe of the Pretty Rocks Landslide, it will not alter the eventual outcome of permanent wetland disturbance from landslide activity.
Up to 14 acres of vegetation will be permanently impacted from excavation and placement of material. The vegetation in the affected areas is commonly found throughout the park and is not endangered or protected so loss of this vegetation will not impact DENA’s ecosystem (NPS 2022a, 43). The area that will be disturbed by the temporary road widening in the Bear Cave Landslide area will be revegetated with plants salvaged from the project area and native seeds.
Because mitigation measures and BMPs will be implemented to reduce these impacts, the selected alternative will not result in significant adverse impacts on wetlands and vegetation.
Cultural Resources. The Park Road Historic District and Cultural Landscape are listed on the National Register and the reroute, excavation, change of the setting, and introduction of
2022 Page 11 incompatible elements in the selected alternative will result in long-term changes to the historic character of the Polychrome section of road, which is considered an adverse effect per the NHPA and its implementing regulations (36 CFR Part 800). Mitigation measures and BMPs are described in Section 3.1 of the EA (NPS 2022a, 23). This project will incorporate these mitigation measures and BMPs by reference to keep the road realignment on the west side of the Pretty Rocks bridge consistent with the curvilinear design of the existing road and restoring the historic road width (16 to 24 feet) once construction is complete. While this impact is adverse, the selected alternative will ensure that the road is maintained and accessible to the public and enable continued access to rural viewscapes, which is the key historic association that makes the Park Road eligible for the National Register and will minimize long-term effects to the historic property (NPS 2022a, 46). The NPS developed a Memorandum of Agreement with the Alaska SHPO and consulting parties to mitigate the adverse effects through the creation of a video based on the book “Snapshots From the Past” and through oral history interviews with road users (NPS 2022b). Through the use of mitigation measures, BMPs, and execution of the Memorandum of Agreement, the selected alternative will not result in significant adverse impacts on cultural resources.
Wilderness. The selected alternative will require the use of motorized vehicles and equipment in wilderness, as well as potential helicopter use in wilderness, which will cause short-term adverse impacts. The selected alternative will also include the permanent installation of rock bolts or dowels in wilderness, excavation in wilderness, the placement of excavated material in wilderness, and periodic use of motorized vehicles in wilderness for maintenance, which will have long-term adverse impacts to wilderness. These actions will degrade the untrammeled, undeveloped, and natural qualities of wilderness character and temporarily decrease opportunities for solitude; however, impacts will be reduced through mitigation measures and BMPs described in Section 3.1 of the EA (NPS 2022a, 22-23). This project will incorporate these mitigation measures and BMPs by reference.
Wilderness areas within 100 feet of the established project area will be identified and avoided to protect the wilderness areas from damage by heavy machinery and tracked vehicles. Mitigation measures and BMPs incorporated to reduce effects to visual impacts, visitor experience, soundscape, wildlife, and vegetation implemented will also minimize impacts to wilderness. Variations on actions to further minimize impacts to wilderness are described in Alternative 3 of the Wilderness Act Minimum Requirement Analysis (NPS 2022a, Appendix E, 24). In addition, the completed project will result in long-term beneficial impacts because it will restore access to the full extent of the Park Road, including access to opportunities for solitude or primitive and unconfined recreation (NPS 2022a, 49). With the use of the mitigation measures and BMPs, the selected alternative will not result in significant adverse impacts on wilderness.
3.3 EFFECTS ON PUBLIC HEALTH AND SAFETY
For safety reasons, only construction traffic will be allowed in the Pretty Rocks area during most construction activities (NPS 2022a, 17). Road access through the Polychrome area is not anticipated during Phase I because the construction area will be closed to the public; therefore, noise and dust will only be an impact to wildlife, vegetation, soundscape, and wilderness (including a few backcountry users). Visitor traffic will be allowed through the project area during Phase II with delays and temporary restrictions possible (NPS 2022a, 17). General mitigation measures and BMPs that this project will incorporate by reference are described in Section 3.1 of the EA (NPS 2022a, 22).
During Phase II, visitors will pass through the area; therefore, dust and noise will impact public visitors (NPS 2022a, 33). However, these impacts are short term and limited to a small period of time and space when visitors are passing through the area during construction. Following construction, users of the Park Road will have safer and reliable access through the Polychrome area. The selected alternative will result in a long-term beneficial impact on public health and safety by reducing
2022 Page 12 geohazards in the Polychrome Area. With the implementation of mitigation measures and incorporation of BMPs to reduce traffic congestion, slow speed, and dust management, construction activities will not adversely affect public health and safety.
3.4 EFFECTS THAT WOULD VIOLATE FEDERAL, STATE, TRIBAL, OR
LOCAL LAW PROTECTING THE ENVIRONMENT
The selected alternative does not violate any federal, state, or local environmental protection laws.
4 PUBLIC INVOLVEMENT AND AGENCY CONSULTATION
4.1 CIVIC ENGAGEMENT
Civic engagement was conducted during the fall of 2021 to inform the public about the Polychrome Area Improvements, hear public concerns, answer questions, solicit comments, and request input on the proposed project for preparation of the EA. A press release announcing public meetings and comment period was distributed by DENA on September 29, 2021, which initiated the 30-day public comment period on PEPC. On September 24, 2021, a postcard was mailed to post office box holders in Healy, Denali Park, and Cantwell, Alaska, informing them of the public meetings; flyers were also posted in post offices in the region and stakeholders were informed by press release.
Virtual public meetings were held on October 13 and 14, 2021, due to safety considerations surrounding the COVID-19 pandemic. These meetings included a presentation that described the background of the Pretty Rocks Landslide; geological hazards in the project area; the purpose and need for the project; a description of the two alternatives; and information about the EA process.
Meetings concluded with an invitation to the attendees to ask questions to NPS staff and submit comments on the EA process. A total of 108 people attended the public meeting on October 13 and 84 people attended the meeting on October 14. The NPS was also invited to and presented on the project at numerous other meetings (e.g., stakeholder groups, nonprofit organizations, and state and local governments) during the civic engagement period. Substantive comments raised during the civic engagement period were considered by the DENA in the development of the EA.
4.2 EA PUBLIC COMMENT PERIOD
The NPS released the Polychrome Area Improvements Environmental Assessment for public review from January 13, 2022 to February 13, 2022. The public review period was announced via postcard, press release, and advertised on the NPS PEPC website. Virtual public meetings were held on January 18 and 26, 2022. These meetings included a presentation that described the background of the Pretty Rocks Landslide; the purpose and need for the project; a description of the two alternatives; and information about the NEPA process. Meetings concluded with an invitation to the attendees to ask questions to the NPS staff and submit comments on the process. A total of 42 people attended the public meeting on January 18 and 34 people attended on January 26 (attendance numbers include project team members). Twenty-two submittals were received during the public comment period. Seventy-seven percent of the submittals (i.e., 17 submittals) were received from individuals or organizations in Alaska. In addition to the general public, the NPS received comments from the State of Alaska, one ANCSA corporation, businesses, inholders, and nongovernmental organizations. Comments were received on 18 topics, including alternatives, geologic resources, wildlife, subsistence, and socioeconomics. No substantive comments were received that resulted in
2022 Page 13 changes to the assessment of impacts or increases in the level of adverse impacts acknowledged in the EA.
4.3 AGENCY, TRIBAL, AND ANCSA CORPORATION CONSULTATION
Endangered Species Act, Section 7. In accordance with the Endangered Species Act of 1973, the NPS requested an official list of the federally threatened and endangered species and designated critical habitats that may occur in the Polychrome Area Improvements Project area from USFWS. On October 1, 2021, the USFWS provided a list and the NPS determined that no federally listed species or designated critical habitats occur in the project area. Due to this finding, no informal or formal ESA Section 7 consultation with USFWS is warranted for this project.
Migratory Bird Treaty Act and Bald and Golden Eagle Protection Act. Measures will be implemented to avoid disturbance to active nests and all construction activities will comply with the MBTA (16 U.S. Code Sections 703-712) and Executive Order 13186. In addition, the project will be conducted in accordance with the BGEPA (16 U.S. Code Section 668-668c) through the permitting process with USFWS. In March 2020, USFWS authorized a 2-year permit to the NPS for potential loss of productivity and nest loss from increased road maintenance activities at the Pretty Rocks Landslide during the 2020 and 2021 breeding seasons. In March 2022, the NPS received a 1-year extension for the 2022 breeding season, and later in 2022 the NPS will request a new permit for the 2023 and 2024 breeding seasons due to the continuing construction activities in the selected alternative.
National Historic Preservation Act, Section 106. In accordance with Section 106 of the NHPA, the NPS consulted with the SHPO and federally recognized tribes. In November 2021, the SHPO and 24 potential consulting parties received an NHPA Section 106 consultation letter informing them of the NHPA determination that the project will adversely affect historic properties and inviting tribes to comment on the determination as defined in 36 CFR Part 800.2(c)(2). The letter also invited tribes to participate as a consulting party on the agreement document to mitigate adverse effects. In addition, the public had 30 days to review the NHPA determination and submit comments to the NPS through the PEPC website from November 19, 2021 through December 19, 2021. No substantive comments were received; Tanana Chiefs Conference, Doyon Limited, Ahtna Incorporated, the Denali Borough, and the Denali Citizens Council responded with interest in participating in the development of the agreement document. The SHPO concurred with the adverse effect determination on December 9, 2021 and an agreement document was developed to determine mitigation actions, which will include oral history interviews and a video of the book “Snapshots From the Past.” A Memorandum of Agreement was finalized in February 2022 (NPS 2022b). While affects to historic properties are determined to be adverse under NHPA, these effects will be mitigated and are therefore not considered significant.
Tribal and ANCSA Corporation Consultation. The NPS consulted with 16 federally recognized tribes and ANCSA Native corporations, informing them of the proposed project and soliciting comments. Consultation was initiated by letters sent on July 7, 2021, with the exception of Doyon Limited, which was sent on August 10, 2021. The NPS also made follow-up phone calls to these tribes and ANCSA corporations in early August 2021 and during the development of the EA (NPS 2022a, Appendix B).
The NPS met with Doyon Limited on February 23, 2022 and will continue to consult with them throughout project implementation. If any additional information regarding ethnographic resources or traditional uses is provided, the NPS will work with the consulting parties to mitigate potential impacts to cultural resources, ethnographic resources, and traditional uses associated with any element of the project.
2022 Page 14
5 CONCLUSION
Based on the review of the facts and analyses provided in the EA (NPS 2022a) and associated decision file, the NPS has selected the Pretty Rocks Bridge and Polychrome Road Improvements alternative for implementation. The conclusion of no significant impact is based on the analysis compiled from a combination of scientific data and professional judgment from NPS staff and documented in the EA. The selected alternative will not have a significant effect on the human environment in accordance with Section 102(2)(c) of NEPA.
2022 Page 15
6 REFERENCES
NPS. 2006. Management Policies 2006. U.S. Department of the Interior, National Park Service, Washington, D.C.
NPS. 2022a. Denali National Park and Preserve, Polychrome Area Improvements Environmental Assessment. 2022. http://parkplanning.nps.gov/polychrome
NPS. 2022b. Memorandum of Agreement Between the National Park Service, Denali National Park and Preserve and the Alaska State Historic Preservation Officer Regarding the Polychrome Area Improvements Project and the East fork Area Improvements and Use Project, Denali National Park, February 18, 2022.
NPS. 2022c. Statement of Findings for Protection of Wetlands (Executive Order 11990), DENA Polychrome Area Improvements, Denali National Park and Preserve. 19p.
NPS. 2016. Procedural Manual 77-1: Wetland Protection. U.S. Department of the Interior, Washington D.C.
USACE. 2007. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Alaska Region (Version 2.0). ERDC/EL TR-07-24, Washington D.C.: Wetlands Regulatory Assistance Program.
USACE. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y-87-1, Washington D.C.: Wetlands Research Program.
http://parkplanning.nps.gov/projectHome.cfm?projectID=101706
2022 Page 16
APPENDIX A ERRATA INDICATING TEXT CHANGES TO THE
POLYCHROME AREA IMPROVEMENTS EA
Together with the FONSI and the EA, the following errata and responses to comments describe the NPS’s final decision for the Polychrome Area Improvements EA. The errata clarify and amend the EA in response to questions, comments, or concerns raised by the public and/or NPS staff during the development of this project. This new information is not substantial and does not lend the need of a new public comment period. Original text from the EA is included below to provide context and present changes. Removed text is shown in strikethroughs and new text is shown as underlined.
ERRATA
Corrections or revisions to an EA are in response to substantive comments received during the public comment period from January 13 through February 13, 2022.
This is the start of the file's text. The full file is on GovTribe.