This amendment modifies a solicitation for the AK NPS DENA 10(49) Polychrome Area Improvements project. The amendment revises subsections related to government-provided material stockpiles and an optional water source. Aggregate surface course and unprocessed aggregate are available at no charge from specified government stockpiles. Non-potable water is also available from a government source but may not be suitable for all applications. The amendment provides additional guidance on material sources, handling and storage, and disposal sites. Acceptable staging and storage areas are designated, and one lane of the road must remain open when construction is not active.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 10/12/2022 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056722R000015
9B. DATED (SEE ITEM 11)
08/03/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK NPS DENA 10(49), Polychrome Area Improvements
Amendment A002 is issued to revise the following:
SPECIAL CONTRACT REQUIREMENTS
Page E-11, Subsection 105.02(b), Government-provided material stockpile. Revises Subsection.
Page E-12, Subsection 105.02(d), Government Provided Optional Water Source. Revises Subsection.
ENCLOSURES: Pages E-11 through E-12
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
E-11 DIVISION 100
Special Contract Requirements PRELIMINARY DESIGN – FOR CMGC SOLICITATION Project: AK NPS DENA 10(49), Polychrome Area Improvements
Section 105. — CONTROL OF MATERIAL
04/02/21– FP-14
105.02 Material Sources. Amend as follows:
(a) Government-provided sources. Delete the text of this Subsection and substitute the following:
There are no Government-provided sources for this project.
(b) Government-provided material stockpile. Add the following:
There is no charge for using any of the following Government-provided material stockpiles.
(1) Aggregate surface course (1,000 cuyd) for use in constructing the final road surface may be obtained from Toklat Pit (MP 53.5). The aggregate surface course meets the material requirements outlined in Subsection 703.05.
(2) Unprocessed aggregate material is available at the following locations and may be used to assist with accessing the slide. The material volume may not be sufficient to be the only means of accessing the slide.
(a) MP 42 Denali Park Road (adjacent to the Ghiglione Bridge), 200 cuyd
(b) Teklanika Pit MP 27 Denali Park Road, 300 cuyd
(c) MP 5 Pit, estimated 3,000 cuyd
(c) Contractor-located sources. Delete the text of this Subsection and substitute the following:
The Contractor is responsible for Contractor-located material sources, including established commercial material sources. Use sources that fulfill the contract quantity and quality requirements. Determine the quantity, type of equipment, and work necessary to select and produce an acceptable material. Secure permits and clearances for use of the source and submit copies of the documents to the CO. Follow the environmental requirements of Subsection 107.10(d) and anticipate a minimum of 60 days for approvals for use of any contractor located site or source. Submit available historical data indicating acceptable material can be produced from the source. Perform quality control sampling and testing according to the approved Contractor Quality Control Plan in Section 153, aggregate source quality tests, and applicable Sampling, Testing, and Acceptance Requirements table included at the end of each Section. Allow the CO the opportunity to witness sampling and splitting of the test material.
Revised by Amendment A002
E-12 DIVISION 100
Special Contract Requirements PRELIMINARY DESIGN – FOR CMGC SOLICITATION Project: AK NPS DENA 10(49), Polychrome Area Improvements
Weed free certification. All material sources and materials incorporated into the work must be certified to be free from noxious weeds, invasive plants, and other deleterious materials by a federal, state or local public agency. Commercial certifications may be acceptable if materials have been certified through the North American Weed Free Forage Program standard or a similarly recognized certification process approved by the CO. Submit material certifications to the CO for approval at least 7 days before their use in the work.
Add the following:
(d) Government Provided Optional Water Source. There is no charge for obtaining water from this Government-provided source.
Non-potable water is available at Teklanika Pit. This water has not been tested and may not be suitable for concrete, grout, or similar applications.
105.04 Handling and Storing Material. Delete the text of the second paragraph and substitute the following:
Use only portions of Mile 5 Pit (MP 5.6 Denali Park Road), Teklanika Pit (MP 27.2 Denali Park Road) and the Denali Park Road between MP 44.6 and MP 45.8 (immediately east of Polychrome Overlook) outlined in the Plans for staging or storing of materials and for equipment parking. One lane of the road must remain open for emergency vehicle access when active construction is not ongoing. If both lanes are blocked during active construction, provide immediate access for emergency vehicles.
Mile 5 Pit and Teklanika Pit floor may be graded as needed. Existing material stockpiles may not be used for staging area improvements but may be relocated to another location within the pit that is accessible to heavy equipment.
Access to the existing material stockpiles must be maintained. The NPS will periodically access Mile 5 Pit and Teklanika Pit material stockpiles. The NPS will continue screening operations at Teklanika Pit, outside those areas identified for the contractor’s use.
The government provided staging and storage space may not be sufficient to address all needs, provide additional space as needed. Do not use private property for staging, storage, or disposal without written permission of the owner or lessee and prior to completion of the requirements of Subsection 107.10(d). Submit copies of agreements and documents and do not use property until approved by CO.
105.07 Disposal Sites. (Added Subsection).
Unsuitable and excess roadway excavation material may be disposed of in accordance with the Plans.
Revised by Amendment A002