This bridge inspection report provides details on the Savage River Bridge structure in Denali National Park. The 108-page PDF document includes the bridge's inventory and appraisal data, load ratings, inspection photos, and notes on conditions. It identifies the prestressed concrete tee beam bridge's location over the Savage River on Denali Park Road, its 1983 construction date, 38-ton inventory rating, and need for rehabilitation/reconstruction. Notable defects from the June 2021 inspection include transverse cracking and spalling in the deck, as well as settlement, erosion, and exposed piles at the west abutment. Scour is also present at the west pier's downstream piles.

The related federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration for improvements to the Polychrome Area in Denali National Park. Solicitation 69056722R000015 provides the opportunity details but no other specifics on required products/services, pricing terms, response/award dates, or set-asides are included.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
Amendment A004.pdf PDF
QA_10-31-2022.pdf PDF
Amendment A003.pdf PDF
QA_10-28-2022.pdf PDF
QA_10-20-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-12-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-11-2022.pdf PDF
QA_10-06-2022.pdf PDF
9830-010P - UPPER IGLOO CREEK - PLANS.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
Pages P-1 through P-4.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
RFP-69056722R000015.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 1-360.pdf PDF
AKNPSDENA_Preliminary_Plans.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - PLANS.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - PLANS.pdf PDF
SWPPP Template.pdf PDF
9830-009P - LOWER IGLOO CREEK INSPECTION REPORT 2021.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - PLANS.pdf PDF
National Park Service_FONSI_20220314_508.pdf PDF
DENA Rating Trucks.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - PLANS.pdf PDF
PolychromeAreaImprovementsEA_20220113.pdf PDF
AKNPSDENA_Preliminary_Design Narrative.pdf PDF
AK NPS DENA 10(49) FHWA FONSI Final Signed.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - PLANS.pdf PDF
EXAMPLE PREVIOUS CONSTRUCTION PERMIT LOADS DENALI PARK ROAD.pdf PDF
Polychrome_Project Delivery Plan.pdf PDF
Polychrome_Project Delivery Plan_Appendices_J-L.pdf PDF
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - PLANS.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
MtMcKinley Road Cultrual Landscape Report 121418.pdf PDF
9830-009P - LOWER IGLOO CREEK PLANS.pdf PDF
GR 06-22-Geotechnical Modeling Report-FINAL-Rev1.pdf PDF
Load Rating - Blank Excel Template summary tables.xlsx XLSX spreadsheet
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - INSPECTION REPORT 2021.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
9830-010P - UPPER IGLOO CREEK - INSPECTION REPORT 2021.pdf PDF
9830-011P - GHIGLIONE BRIDGE - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 361-937.pdf PDF
Denali National Park Bridge Location Map and Key.pdf PDF
Polychrome_Project Delivery Plan_ Appendices_A-I.pdf PDF
AKNPSDENA_Preliminary_XSections.pdf PDF
9830-011P - GHIGLIONE BRIDGE - PLANS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

SAVAGE RIVER BRIDGE

DENALI PARK ROAD OVER SAVAGE RIVER

DENALI NATIONAL PARK & PRESERVE

LOOKING WEST

STRUCTURE NO. 9830-005P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/21/2021

SOUTH (UPSTREAM) PROFILE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE LOAD RATING STRUCTURE NO. 9830-005P

SAVAGE RIVER BRIDGE INSPECTION DATE: 06/20/2021

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 28 25 47 43

HS 45 41 77 70

TYPE 3 43 39 76 69

TYPE 3S2 50 45 83 75

TYPE 3-3 54 49 91 83

DESIGN LOADING: 5 - HS 20

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 05/23/2016

LOAD RATING CONTROLLED BY: SHEAR CAPACITY OF BEAMS

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-005P

STRUCTURE IDENTIFICATION

(201) PARK: DENALI NATIONAL PARK & PRESERVE

(202) STRUCTURE NAME:..............SAVAGE RIVER BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........9830-005 P

7 - ALASKA(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................PARK

(211) PROJECT NO(S):................... CR. N.P.1-A

(212) DRAWING NUMBERS:...........RG2344

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

020 - ALASKA

02290 YUKON-KOYUKUK

00000

1 6 1 00000 0

SAVAGE RIVER

DENALI PARK ROAD

9830005P0000000

14.89 MILES WEST OF AK ROUTE 3

(MILEPOST 237.3) ON DENALI PARK

ROAD.

99.99 FT ( 99.99 M)

14.89 (KM PT: 4.54 )

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........5 - PRESTRESSED CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 04 - TEE BEAM (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............105 FT ( 32 M)

(49) STRUCTURE LENGTH:........... 301. FT ( 91.7 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 2 - CONCRETE PRECAST PANELS

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................5 - HS 20 (41) LOAD RESTRICTION:.................. A - OPEN

(66) INVENTORY RATING:..............38 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 34.5

LOADS

(64) OPERATING RATING:..............61 TONS ( 55.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 06/21/2021 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-005P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 63° 44'20.10" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)

(17) LONGITUDE:............................149°17 '41 50" (52) DECK WIDTH:.......................... 31.5 FT ( 9.6 M)

(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 28.0 FT ( 8.5 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 24.0 FT ( 7.3 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 2 0 FT ( 0.6 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 2 0 FT ( 0.6 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1300 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1560 (47) TOTAL HORIZ. CLEARANCE:.. 24 FT ( 7.3 M)

(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 1 8 FT ( 0.5 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 1 8 FT ( 0.5 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 25 FT ( 0.69 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF

FOOTING OR PILES

(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227)

(75B) WORK DONE BY:.................. (228)

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229)

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1983-STRUCTURE REPLACED. 5/08, 5/12, & 5/17-SNOOPER INSPECTION.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

SPAN #1 & #3 - LENGTH 104.2', SPAN #2 - LENGTH 105.1'

Inspector: Jordan Hensley Structure Number: 9830005P0000000

Inpsection Date: 06/21/2021 Facility Carried: DENALI PARK ROAD

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING EAST TOWARD DENALI VISITOR CENTER

PHOTO 4

Description NORTH (DOWNSTREAM) PROFILE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO 6

Description TYPICAL VIEW OF CURB AND RAIL, UPSTREAM SIDE SHOWN

Bridge Inspection Report

Pictures

PHOTO 7

Description TYPICAL VIEW OF EXPANSION JOINTS, JOINT ABOVE WEST ABUTMENT SHOWN

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, EAST SPAN SHOWN LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 9

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, MIDDLE SPAN LOOKING WEST

PHOTO 10

Description GENERAL UNDERSIDE VIEW OF DECK, MIDDLE SPAN SHOWN

Bridge Inspection Report

Pictures

PHOTO 11

Description TRANSVERSE CRACKING IN WEARING SURFACE NEAR WEST ABUTMENT

PHOTO 12

Description SPALLING OF CONCRETE DIAPHRAGM IN BAY #5 OF EAST SPAN

Bridge Inspection Report

Pictures

PHOTO 13

Description GENERAL VIEW OF WEST ABUTMENT

PHOTO 14

Description EROSION AND FISSURE OF SLOPE AT WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 15

Description GENERAL VIEW OF SETTLEMENT AT WEST ABUTMENT

PHOTO 16

Description CLOSE-UP VIEW OF SETTLEMENT AT WEST ABUTMENT (APPROXIMATELY 7" BELOW CAP);

NOTE, EXPOSED STEEL PILE

Bridge Inspection Report

Pictures

PHOTO 17

Description GENERAL VIEW OF WEST PIER LOOKING WEST

PHOTO 18

Description EXPOSED STEEL H-PILES WITH FITTED JACKET AT WEST PIER

Bridge Inspection Report

Pictures

PHOTO 19

Description SCOUR AT DOWNSTREAM PILES OF WEST PIER

PHOTO 20

Description GENERAL VIEW OF EAST PIER LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 21

Description EXPOSED H-PILES WITH PROTECTIVE STEEL JACKETS AT EAST PIER, LOOKING

UPSTREAM

PHOTO 22

Description GENERAL VIEW OF EAST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 23

Description EAST APPROACH

PHOTO 24

Description WEST APPROACH

Bridge Inspection Report

Pictures

PHOTO 25

Description SPALLING OF UPSTREAM CONCRETE PARAPET AT EAST ABUTMENT

PHOTO 26

Description SPALLING OF UPSTREAM CONCRETE PARAPET NEAR WEST PIER

Bridge Inspection Report

Pictures

PHOTO 27

Description UPSTREAM CHANNEL

PHOTO 28

Description DOWNSTREAM CHANNEL