About this file

This bridge inspection report documents the condition of the Sanctuary River Bridge located in Denali National Park and Preserve in Alaska. The three-span steel bridge was built in 1956 and carries the Denali Park Road over the Sanctuary River. The 199-foot long structure is in overall fair condition with some deterioration noted, including spalling and cracking of the concrete deck and expansion joints. The structural steel superstructure shows signs of corrosion and paint peeling. The substructure of pile bents and abutments is in good condition aside from minor cracking at the east abutment. The report recommends rehabilitation or reconstruction of the bridge deck and expansion joints within the next few years to address the noted deficiencies.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
Amendment A004.pdf PDF
QA_10-31-2022.pdf PDF
Amendment A003.pdf PDF
QA_10-28-2022.pdf PDF
QA_10-20-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-12-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-11-2022.pdf PDF
QA_10-06-2022.pdf PDF
9830-010P - UPPER IGLOO CREEK - PLANS.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
Pages P-1 through P-4.pdf PDF
RFP-69056722R000015.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 1-360.pdf PDF
AKNPSDENA_Preliminary_Plans.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - PLANS.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - PLANS.pdf PDF
SWPPP Template.pdf PDF
9830-009P - LOWER IGLOO CREEK INSPECTION REPORT 2021.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - PLANS.pdf PDF
National Park Service_FONSI_20220314_508.pdf PDF
DENA Rating Trucks.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - PLANS.pdf PDF
PolychromeAreaImprovementsEA_20220113.pdf PDF
AKNPSDENA_Preliminary_Design Narrative.pdf PDF
AK NPS DENA 10(49) FHWA FONSI Final Signed.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - PLANS.pdf PDF
EXAMPLE PREVIOUS CONSTRUCTION PERMIT LOADS DENALI PARK ROAD.pdf PDF
Polychrome_Project Delivery Plan.pdf PDF
Polychrome_Project Delivery Plan_Appendices_J-L.pdf PDF
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - PLANS.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
MtMcKinley Road Cultrual Landscape Report 121418.pdf PDF
9830-009P - LOWER IGLOO CREEK PLANS.pdf PDF
GR 06-22-Geotechnical Modeling Report-FINAL-Rev1.pdf PDF
Load Rating - Blank Excel Template summary tables.xlsx XLSX spreadsheet
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - INSPECTION REPORT 2021.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
9830-010P - UPPER IGLOO CREEK - INSPECTION REPORT 2021.pdf PDF
9830-011P - GHIGLIONE BRIDGE - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 361-937.pdf PDF
Denali National Park Bridge Location Map and Key.pdf PDF
Polychrome_Project Delivery Plan_ Appendices_A-I.pdf PDF
AKNPSDENA_Preliminary_XSections.pdf PDF
9830-011P - GHIGLIONE BRIDGE - PLANS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

SANCTUARY RIVER BRIDGE

DENALI PARK ROAD OVER SANCTUARY RIVER

DENALI NATIONAL PARK & PRESERVE

LOOKING BACK EAST TOWARD DENALI VISITOR CENTER

STRUCTURE NO. 9830-007P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/21/2021

SOUTH (UPSTREAM) PROFILE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE LOAD RATING STRUCTURE NO. 9830-007P

SANCTUARY RIVER BRIDGE INSPECTION DATE: 06/20/2021

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 24 22 40 36

HS 30 27 51 46

TYPE 3 28 25 47 43

TYPE 3S2 39 35 66 60

TYPE 3-3 46 42 78 71

DESIGN LOADING: 3 - HS 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 05/23/2016

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-007P

STRUCTURE IDENTIFICATION

(201) PARK: DENALI NATIONAL PARK & PRESERVE

(202) STRUCTURE NAME:..............SANCTUARY RIVER BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........9830-007 P

7 - ALASKA(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................PARK

(211) PROJECT NO(S):................... UNKNOWN

(212) DRAWING NUMBERS:

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

020 - ALASKA

02290 YUKON-KOYUKUK

00000

1 6 1 00000 0

SANCTUARY RIVER

DENALI PARK ROAD

9830007P0000000

22.96 MILES WEST OF AK ROUTE 3

(MILE POST 237.3) ON DENALI PARK

ROAD.

99.99 FT ( 99.99 M)

22.96 (KM PT: 7 )

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........3 - STEEL

(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR

GIRDER

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:..............65 FT ( 19.8 M)

(49) STRUCTURE LENGTH:........... 199. FT ( 60.7 M)

(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT

(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT

(217A) PREDOM. PIER FDN:.......... 4 - PILE BENT

(217B) SECOND. PIER FDN:.......... 4 - PILE BENT

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL:............ 0 - Other

(44B) APPR. STR. TYPE:.................... 00 - OTHER

(46) NO OF APPROACH SPANS:

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE:.. 1 - MONOLITHIC CONCRETE

(CONCURRENTLY PLACED WITH

STRUCTURAL DECK)

B) TYPE MEMBRANE:................. 0 - NONE

C) TYPE PROTECTION:.............. 0 - NONE

(218) IS SALT USED?.......................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................3 - HS 15 (41) LOAD RESTRICTION:.................. A - OPEN

(66) INVENTORY RATING:..............27 TONS ( 24.5 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............45.1 TONS ( 40.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 06/21/2021 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 5 - SCOUR INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: 09/01/1998 (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-007P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 63° 43'22 80" (51) CURB TO CURB WIDTH:............ 24.0 FT ( 7.3 M)

(17) LONGITUDE:............................149°28 '26 20" (52) DECK WIDTH:.......................... 28.5 FT ( 8.7 M)

(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 30.0 FT ( 9.1 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 24.0 FT ( 7.3 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 3 0 FT ( 0.9 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 3 0 FT ( 0.9 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1300 (34) SKEW ANGLE:......................... 30 °

(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1560 (47) TOTAL HORIZ. CLEARANCE:.. 24 FT ( 7.3 M)

(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 2 3 FT ( 0.7 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 2 3 FT ( 0.7 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 3 - CONCRETE/STEEL

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 25 FT ( 0.69 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................7 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 6 (113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF

FOOTING OR PILES

(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 0 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:

(75B) WORK DONE BY:.................. (

(76) IMPROVEMENT LENGTH:....... FT ( 0 M)

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

5/08, 5/12, & 5/18 -SNOOPER INSPECTION.

(231) ADDITIONAL CONSIDERATIONS:

CALCIUM CHLORIDE IS USED ON BRIDGE APPROACHES.

(330) ADDITIONAL CONFIGURATION INFORMATION:

SPAN #1 & #3 - LENGTH 64.7', SPAN #2 - LENGTH 65.2'

Inspector: Jordan Hensley Structure Number: 9830007P0000000

Inpsection Date: 06/21/2021 Facility Carried: DENALI PARK ROAD

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST

PHOTO 4

Description NORTH (DOWNSTREAM) PROFILE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW, LOOKING WEST

PHOTO 6

Description TYPICAL SPALLING ON THE TOP OF CONCRETE DECK, ABOVE WEST SPAN SHOWN

Bridge Inspection Report

Pictures

PHOTO 7

Description MINOR TRANSVERSE CRACKING OF DECK, EAST SPAN SHOWN

PHOTO 8

Description TYPICAL VIEW OF CURB AND RAIL, UPSTREAM SIDE SHOWN

Bridge Inspection Report

Pictures

PHOTO 9

Description GENERAL VIEW OF EXPANSION JOINT ABOVE EAST PIER; NOTE DAMAGE TO JOINT

PHOTO 10

Description CLOSE-UP OF DAMAGE TO EXPANSION JOINT ABOVE EAST ABUTMENT; NOTE, MISSING

JOINT FILLER AND SPALLING OF CONCRETE AROUND THE JOINT

Bridge Inspection Report

Pictures

PHOTO 11

Description GENERAL VIEW OF EXPANSION JOINT ABOVE WEST PIER; NOTE, DAMAGE TO JOINT

NEAR CENTER OF ROADWAY

PHOTO 12

Description CLOSE-UP OF DAMAGE TO EXPANSOIN JOINT ABOVE WEST PIER

Bridge Inspection Report

Pictures

PHOTO 13

Description TYPICAL PEELING OF PAINT AND RUSTING OF EXPOSED STEEL RAILING, DOWNSTREAM

RAILING SHOWN

PHOTO 14

Description TYPICAL SPALLING AROUND SCUPPERS, DOWNSTREAM SIDE NEAR MIDDLE SPAN

SHOWN

Bridge Inspection Report

Pictures

PHOTO 15

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, EAST SPAN LOOKING WEST

PHOTO 16

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, MIDDLE SPAN LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 17

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, WEST SPAN LOOKING EAST

PHOTO 18

Description GENERAL VIEW OF BOTTOM COVER PLATE, EAST SPAN LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL UNDERSIDE VIEW OF DECK, MIDDLE BAY OF MIDDLE SPAN

PHOTO 20

Description MINOR PEELING OF PAINT AND RUSTING OF STRUCTURAL STEEL, UPSTREAM GIRDER

OF EAST SPAN SHOWN

Bridge Inspection Report

Pictures

PHOTO 21

Description GENERAL VIEW OF EAST ABUTMENT

PHOTO 22

Description DIAGONAL CRACKING WITH RUST STAINING FROM CORNERS OF ABUTMENT BEARING

SEAT, UPSTREAM CORNER OF EAST ABUTMENT SHOWN

Bridge Inspection Report

Pictures

PHOTO 23

Description GENERAL VIEW OF WEST ABUTMENT

PHOTO 24

Description TYPICAL BEARING ASSEMBLY, DOWNSTREAM BEARING AT WEST ABUTMENT SHOWN

Bridge Inspection Report

Pictures

PHOTO 25

Description GENERAL VIEW OF EAST PIER LOOKING EAST

PHOTO 26

Description GENERAL VIEW OF EAST PIER LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 27

Description LOOSE JOINT BACKER ROD AT EAST PIER

PHOTO 28

Description GENERAL VIEW OF WEST PIER LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 29

Description EROSION AT NORTH (DOWNSTREAM) WINGWALL AT WEST APPROACH

PHOTO 30

Description EAST APPROACH

Bridge Inspection Report

Pictures

PHOTO 31

Description WEST APPROACH

PHOTO 32

Description UPSTREAM CHANNEL

Bridge Inspection Report

Pictures

PHOTO 33

Description DOWNSTREAM CHANNEL