9830-013P - TOKLAT RIVER BRIDGE NO. 1 - INSPECTION REPORT 2021.pdf

PDF 4 MB Posted

Attached to
AK NPS DENA 10(49), Polychrome Area Improvements
Solicitation number
69056722R000015
Issued by

About this file

This is a bridge inspection report for the Toklat River Bridge No. 1 located in Denali National Park and Preserve. The report provides details on the structure inventory, appraisal, condition ratings, load ratings, inspection photos and findings. Key details include the bridge number 9830013P0000000, four span concrete box girder design, 430 foot long structure carrying Denali Park Road over the Toklat River, last inspected on June 21, 2021, and recommendations for continued sheetpile installation along the downstream side of the west abutment and addressing erosion at abutment corners. Scour is noted as a critical feature requiring protection of exposed foundations.

View the file

Other files

File Type Posted
BidSum_OR DOT 18(1).pdf PDF
Amendment A004.pdf PDF
QA_10-31-2022.pdf PDF
Amendment A003.pdf PDF
QA_10-28-2022.pdf PDF
QA_10-20-2022.pdf PDF
Amendment A002.pdf PDF
QA_10-12-2022.pdf PDF
Amendment A001.pdf PDF
QA_10-11-2022.pdf PDF
QA_10-06-2022.pdf PDF
9830-010P - UPPER IGLOO CREEK - PLANS.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
Pages P-1 through P-4.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
RFP-69056722R000015.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 1-360.pdf PDF
AKNPSDENA_Preliminary_Plans.pdf PDF
9830-005P - SAVAGE RIVER BRIDGE - PLANS.pdf PDF
9830-007P - SANCTUARY RIVER BRIDGE - PLANS.pdf PDF
SWPPP Template.pdf PDF
9830-009P - LOWER IGLOO CREEK INSPECTION REPORT 2021.pdf PDF
9830-013P - TOKLAT RIVER BRIDGE NO. 1 - PLANS.pdf PDF
National Park Service_FONSI_20220314_508.pdf PDF
DENA Rating Trucks.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - PLANS.pdf PDF
PolychromeAreaImprovementsEA_20220113.pdf PDF
AKNPSDENA_Preliminary_Design Narrative.pdf PDF
AK NPS DENA 10(49) FHWA FONSI Final Signed.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - PLANS.pdf PDF
EXAMPLE PREVIOUS CONSTRUCTION PERMIT LOADS DENALI PARK ROAD.pdf PDF
Polychrome_Project Delivery Plan.pdf PDF
Polychrome_Project Delivery Plan_Appendices_J-L.pdf PDF
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - PLANS.pdf PDF
9830-012P - EAST FORK TOKLAT RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
MtMcKinley Road Cultrual Landscape Report 121418.pdf PDF
9830-009P - LOWER IGLOO CREEK PLANS.pdf PDF
GR 06-22-Geotechnical Modeling Report-FINAL-Rev1.pdf PDF
Load Rating - Blank Excel Template summary tables.xlsx XLSX spreadsheet
9830-014P - TOKLAT RIVER BRIDGE NO. 2 - INSPECTION REPORT 2021.pdf PDF
9830-008P - TEKLANIKA RIVER BRIDGE - INSPECTION REPORT 2021.pdf PDF
9830-010P - UPPER IGLOO CREEK - INSPECTION REPORT 2021.pdf PDF
9830-011P - GHIGLIONE BRIDGE - INSPECTION REPORT 2021.pdf PDF
GR 01-22 Polychrome Area Improvements - Geotechnical Data Report_pp 361-937.pdf PDF
Denali National Park Bridge Location Map and Key.pdf PDF
Polychrome_Project Delivery Plan_ Appendices_A-I.pdf PDF
AKNPSDENA_Preliminary_XSections.pdf PDF
9830-011P - GHIGLIONE BRIDGE - PLANS.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

TOKLAT RIVER BRIDGE NO. 1

DENALI PARK ROAD OVER TOKLAT RIVER

DENALI NATIONAL PARK & PRESERVE

LOOKING EAST TOWARD DENALI VISITOR CENTER

STRUCTURE NO. 9830-013P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/21/2021

SOUTH (UPSTREAM) PROFILE

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE LOAD RATING STRUCTURE NO. 9830-013P

TOKLAT RIVER BRIDGE NO. 1 INSPECTION DATE: 06/20/2021

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 25 23 42 38

HS 45 41 76 69

TYPE 3 59 54 98 89

TYPE 3S2 62 56 105 95

TYPE 3-3 66 60 110 100

DESIGN LOADING: 5 - HS 20

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

X ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 05/23/2016

LOAD RATING CONTROLLED BY: MOMENT CAPACITY OF CONCRETE DECK

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-013P

STRUCTURE IDENTIFICATION

(201) PARK: DENALI NATIONAL PARK & PRESERVE

(202) STRUCTURE NAME:..............TOKLAT RIVER BRIDGE NO. 1

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........9830-013 P

7 - ALASKA(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................NONE

(211) PROJECT NO(S):................... DENA 10(1)

(212) DRAWING NUMBERS:...........RG2444

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

020 - ALASKA

02290 YUKON-KOYUKUK

00000

1 6 1 00000 0

TOKLAT RIVER

DENALI PARK ROAD

9830013P0000000

53.33 MILES WEST OF AK ROUTE 3

(MP 237.3) ON DENALI PARK ROAD.

99.99 FT ( 99.99 M)

53.33 (KM PT: 16.25)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS

(43B) MAIN STR. TYPE:.................. 06 - BOX BEAM OR GIRDERS -

SINGLE OR SPREAD

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:..............119 FT ( 36.3 M)

(49) STRUCTURE LENGTH:........... 430. FT ( 131.1 M)

(216A) ABUTMENT #1 FDN:........... 4 - PILE BENT

(216B) ABUTMENT #2 FDN:........... 4 - PILE BENT

(217A) PREDOM. PIER FDN:.......... 4 - PILE BENT

(217B) SECOND. PIER FDN:.......... 4 - PILE BENT

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL:............ 0 - Other

(44B) APPR. STR. TYPE:.................... 00 - OTHER

(46) NO OF APPROACH SPANS:

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE:.. 1 - MONOLITHIC CONCRETE

(CONCURRENTLY PLACED WITH

STRUCTURAL DECK)

B) TYPE MEMBRANE:................. 0 - NONE

C) TYPE PROTECTION:.............. 0 - NONE

(218) IS SALT USED?.......................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................5 - HS 20 (41) LOAD RESTRICTION:.................. A - OPEN

(66) INVENTORY RATING:..............43 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 39

LOADS

(64) OPERATING RATING:..............66 TONS ( 59.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 06/21/2021 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9830-013P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 63° 31'07.40" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)

(17) LONGITUDE:............................150°01 '54.60" (52) DECK WIDTH:.......................... 31.5 FT ( 9.6 M)

(19) DETOUR LENGTH:.................. 199 MI ( 199 KM) (32) APPR. ROADWAY WIDTH:...... 28.0 FT ( 8.5 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 28.0 FT ( 8.5 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 0 0 FT ( 0 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 0 0 FT ( 0 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............300 (34) SKEW ANGLE:......................... 0 °

(30) YEAR OF ADT:......................... 2013 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................500 (47) TOTAL HORIZ. CLEARANCE:.. 24 FT ( 7.3 M)

(115) YEAR OF FUTURE ADT:........2033 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 1 8 FT ( 0.5 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 1 8 FT ( 0.5 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 33 FT ( 0.71 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO

PROTECT EXPOSED FOUNDATIONS

(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

(231) ADDITIONAL CONSIDERATIONS:

CALCIUM CHLORIDE IS USED ON BRIDGE APPROACHES.

(330) ADDITIONAL CONFIGURATION INFORMATION:

Span #1 - #4 - Length 93', 119', 119', & 94 5'; Type 206 (Conc Box Girder)

Inspector: Jordan Hensley Structure Number: 9830013P0000000

Inpsection Date: 06/21/2021 Facility Carried: DENALI PARK ROAD

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING WEST

PHOTO 4

Description NORTH (DOWNSTREAM) PROFILE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO 6

Description TYPICAL VIEW OF BRIDGE CURB AND RAIL, UPSTREAM SIDE SHOWN (PHOTO FROM 2019

INSPECTION)

Bridge Inspection Report

Pictures

PHOTO 7

Description TYPICAL LIGHT TRANSVERSE CRACKING OF THE DECK

PHOTO 8

Description TYPICAL TRANSVERSE CRACKING OF CURB, DOWNSTREAM CURB SHOWN

Bridge Inspection Report

Pictures

PHOTO 9

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, SPAN #1 LOOKING WEST

PHOTO 10

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, SPAN #2 LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 11

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, SPAN #3 LOOKING WEST

PHOTO 12

Description GENERAL UNDERSIDE VIEW OF SUPERSTRUCTURE, SPAN #4 LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 13

Description GENERAL VIEW OF EAST ABUTMENT

PHOTO 14

Description GENERAL VIEW OF EAST PIER, LOOKING EAST

Bridge Inspection Report

Pictures

PHOTO 15

Description GENERAL VIEW OF EAST PIER, LOOKING WEST

PHOTO 16

Description GENERAL VIEW OF CENTER PIER, LOOKING WEST (PHOTO FROM 2019 INSPECTION)

Bridge Inspection Report

Pictures

PHOTO 17

Description GENERAL VIEW OF CENTER PIER, LOOKING EAST (PHOTO FROM 2019 INSPECTION)

PHOTO 18

Description GENERAL VIEW OF WEST PIER, LOOKING WEST

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL VIEW OF THE WEST PIER LOOKING EAST

PHOTO 20

Description GENERAL VIEW OF WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 21

Description GENERAL VIEW OF SHEETPILING ON THE UPSTREAM SIDE BY THE EAST ABUTMENT

PHOTO 22

Description CLOSE-UP VIEW OF SHEETPILING UPSTREAM OF THE EAST ABUTMENT; NOTE, OVERTOPPING OF SHEETPILING

Bridge Inspection Report

Pictures

PHOTO 23

Description ANOTHER VIEW OF OVERTOPPING OF SHEETPILING UPSTREAM OF THE EAST

ABUTMENT

PHOTO 24

Description GENERAL VIEW OF SHEETPILING AT UPSTREAM CORNER OF WEST ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 25

Description GENERAL VIEW OF SHEETPILING AT WEST ABUTMENT; NOTE, SHEETPILING ENDS AT THE

DOWNSTREAM CORNER

PHOTO 26

Description GENERAL VIEW OF END OF SHEETPILING AT DOWNSTREAM CORNER OF WEST

ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 27

Description GENERAL VIEW OF RECOMMENDED LOCATION FOR CONTINUED SHEETPILING ALONG

DOWNSTREAM SIDE OF WEST ABUTMENT

PHOTO 28

Description ERODED EMBANKMENT PAST DOWNSTREAM CORNER OF WEST ABUTMENT, RECOMMENDED LOCATION FOR CONTINUED SHEETPILING

Bridge Inspection Report

Pictures

PHOTO 29

Description TYPICAL EROSION AT ABUTMENT CORNERS, UPSTREAM CORNER OF WEST ABUTMENT

SHOWN

PHOTO 30

Description EAST APPROACH

Bridge Inspection Report

Pictures

PHOTO 31

Description WEST APPROACH

PHOTO 32

Description SOUTH (UPSTREAM) CHANNEL

Bridge Inspection Report

Pictures

PHOTO 33

Description NORTH (DOWNSTREAM) CHANNEL

PHOTO 34

Description GENERAL VIEW OF EROSION OF BANK, DOWNSTREAM OF PIER #1

Bridge Inspection Report

Pictures

PHOTO 35

Description GENERAL VIEW OF EROSION OF BANK, DOWNSTREAM OF EAST PIER

PHOTO 36

Description EROSION OF BANK, CHANNEL SECTION DOWNSTREAM OF EAST PIER

File details come from the government source that posted it. Updated .