SURVEY_CONTROL_SHEET.DWG
DWG drawing 17 MB Posted
- Attached to
- McIntosh Park Wetland Construction
- Solicitation number
- 26-048UO-IFB
- Issued by
- Hillsborough County, Florida
About this file
This is a survey control sheet drawing file (SURVEY_CONTROL_SHEET.DWG) related to the McIntosh Park Wetland Construction project being procured by the City of Plant City, Florida under Invitation for Bid (IFB) 26-048UO-IFB. The project encompasses the construction and restoration of wetlands across a 363-acre site located at 775 East Knights Griffin Road in Hillsborough County, including excavation of wetland cells, on-site stacking of excavated soils to create a 50-foot hill shaped like Florida, installation of reclaimed water piping infrastructure with SCADA-controlled discharge valves, and native wetland vegetation planting. Bid alternates include unpaved and handicap-accessible paved parking lots, pre-fabricated restroom and pavilion facilities, boardwalk construction, septic system, and water well installation. A pre-proposal meeting is scheduled for September 10, 2026 at 10:30 a.m., with questions due by September 14, 2026. Sealed bids are due electronically via the City's OpenGov portal on September 24, 2026 at 2:00 p.m. Substantial completion is required within 540 calendar days of Notice to Proceed, with final completion within 30 days thereafter.
The contract is fixed-price with 5% retainage, and the City will award to the lowest responsive and responsible bidder. Bids remain valid for 90 days from submittal. The project is partially funded through the State of Florida Department of Environmental Protection Grant Agreement No. LPA0038, and all work must comply with grant terms and conditions. Local preference of up to one percent discount or $2,500 (whichever is less) applies to qualifying bidders. Contractors must self-perform a minimum of 30 percent of total project cost and maintain General Contractor and Underground Utility and Excavation Contractor licenses. Qualifying experience requirements include three projects involving excavation of 300,000 cubic yards or greater within Florida, three projects involving wastewater or reuse collection systems, and two projects involving wetland planting and boardwalk construction. Liquidated damages range from $1,015 to $10,203 per day plus 0.00005 of amounts exceeding $20 million. Insurance requirements include Workers' Compensation, Commercial General Liability ($500,000 per occurrence/$1,000,000 aggregate), Commercial Automobile Liability ($500,000), and Railroad Protective Liability ($5,000,000 per occurrence/$10,000,000 aggregate). Twenty-four-hour site security using DEFEND 360 cameras with real-time monitoring is mandatory.
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .