This is an Existing Conditions Plan drawing file (EXISTING_CONDITIONS_PLAN.dwg) associated with the McIntosh Park Wetland Construction project for the City of Plant City, Florida. The project encompasses the construction and restoration of wetlands across a 363-acre park located at 775 East Knights Griffin Road in Hillsborough County. Major work includes excavation and restoration of multiple wetland cells, on-site stacking of excavated soils to create a 50-foot hill shaped like Florida, installation of reclaimed water piping infrastructure with SCADA-controlled discharge valves, and native wetland vegetation planting. Bid alternates include unpaved and handicap-accessible paved parking lots, pre-fabricated restroom and pavilion facilities, boardwalk construction, septic system, and water well installation. A pre-proposal meeting is scheduled for September 10, 2026 at 10:30 a.m., with bids due September 24, 2026 at 2:00 p.m. Questions must be submitted by September 14, 2026. Substantial completion is required within 540 calendar days of the Notice to Proceed, with final completion within 30 days thereafter.
The contract is fixed-price with 5% retainage, and the City will award to the lowest responsive and responsible bidder. Bids remain valid for 90 days from submittal. Local preference of up to one percent discount or $2,500 (whichever is less) applies to qualifying bidders. The project is partially funded through a State of Florida Department of Environmental Protection Grant Agreement No. LPA0038, and all work must comply with grant terms and conditions. Contractors must maintain General Contractor and Underground Utility and Excavation Contractor licenses, self-perform a minimum of 30 percent of total project cost, and provide 24/7 site security using DEFEND 360 cameras with real-time monitoring. Qualifying experience requirements include three projects involving excavation of 300,000 cubic yards or greater within Florida, three projects involving wastewater or reuse collection systems, and two projects involving wetland planting and boardwalk construction. Liquidated damages range from $1,015 to $10,203 per day plus 0.00005 of amounts exceeding $20 million. Insurance requirements include Workers' Compensation, Commercial General Liability ($500,000/$1,000,000 aggregate), Commercial Automobile Liability ($500,000), and Railroad Protective Liability ($5,000,000/$10,000,000 aggregate).
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .