Environmental_Resource_Permit_no._43044733.003_-_December_27,_2025.pdf
PDF 142 KB Posted
- Attached to
- McIntosh Park Wetland Construction
- Solicitation number
- 26-048UO-IFB
- Issued by
- Hillsborough County, Florida
About this file
This is an Environmental Resource Permit (ERP) approval document issued by the Southwest Florida Water Management District (SWFWMD) to the City of Plant City for the McIntosh Park Elements project located in Hillsborough County, Florida. The permit authorizes construction of a 2.45-acre stormwater management system serving a city park project that includes a new entrance drive, parking areas, restroom facilities, boardwalk, and associated infrastructure. The project will feature two new wet detention ponds totaling 0.35 acres that will provide treatment and attenuation for runoff from the project area. The permit was issued on December 27, 2025, with an expiration date of December 27, 2030. The approved construction plans were received by the District on October 28, 2025. Construction must comply with all approved drawings, plans, and specifications, and the permittee must notify the District at least 48 hours prior to beginning construction activities. The permit requires completion of all stormwater management system aspects, including grading, planting, and discharge control facilities, prior to beneficial occupancy or use of the development.
The permit includes specific conditions requiring retention of a registered design professional to conduct on-site observations and assist with as-built certification, inspection of the permitted project every three years once converted to operation and maintenance phase, and proper abandonment of existing wells, septic tanks, and fuel storage tanks. The permittee must provide as-built drawings and certification within 30 days of project completion and submit inspection reports to the District using specified forms within 30 days of any inspection or system failure. District staff must be notified in advance of any construction dewatering activities, and all off-site discharges during construction must occur only through authorized permit facilities. The permit does not authorize adverse impacts to state-listed species, and compliance with fish and wildlife regulations remains the responsibility of the owner or applicant. Administrative hearing rights exist within 21 days of receipt of written notice, and judicial review may be sought in the Fifth District Court of Appeal within 30 days of agency action.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2379 Broad Street, Brooksville, Florida 34604-6899
(352) 796-7211 or 1-800-423-1476 (FL only)
SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only)
On the Internet at: WaterMatters.org
Tampa Service Office 7601 Highway 301 North Tampa, Florida 33637-6759
(813) 985-7481 or 1-800-836-0797 (FL only)
Bartow Service Office 170 Century Boulevard Bartow, Florida 33830-7700
(863) 534-1448 or 1-800-492-7862 (FL only)
An Equal
Opportunity
Employer
City of Plant City
Attn: Lynn Spivey
December 27, 2025
Sarasota Service Office
78 Sarasota Center Boulevard Sarasota, Florida 34240-9770
(941) 377-3722 or 1-800-320-3503 (FL only)
1500 Victoria St.
Plant City, FL 33563
Subject: Notice of Intended Agency Action - Approval
ERP Individual Construction
Project Name: McIntosh Park Elements
App ID/Permit No:
County: Hillsborough
917417 / 43044733.003
S05/T28S/R22E, S08/T28S/R22E, S04/T28S/R22E, S09/T28S/R22E
Sec/Twp/Rge:
Dear Permittee(s):
The Southwest Florida Water Management District (District) has completed its review of the application for
Environmental Resource Permit. Based upon a review of the information you have submitted, the District hereby gives notice of its intended approval of the application.
The File of Record associated with this application can be viewed at http://www18.swfwmd.state.fl.us/erp/erp/search/ERPSearch.aspx and is also available for inspection Monday through Friday, except for District holidays, from 8:00 a.m. through 5:00 p.m. at the District's Tampa Service
Office, 7601 U.S. Highway 301 North, Tampa, Florida 33637.
cc: Jeffrey D. PeQueen, P.E.
Alba Mas, P.E., Dewberry
Robert E. McDaniel, P.E.
Manager
Environmental Resource Permit Bureau
Regulation Division
If you have any questions or concerns regarding the application or any other information, please contact the Environmental Resource Permit Bureau in the Tampa Service Office.
Sincerely, 2379 Broad Street, Brooksville, Florida 34604-6899
(352) 796-7211 or 1-800-423-1476 (FL only)
SUNCOM 628-4150 TDD only 1-800-231-6103 (FL only)
On the Internet at: WaterMatters.org
An Equal
Opportunity
Employer
Bartow Service Office 170 Century Boulevard Bartow, Florida 33830-7700
(863) 534-1448 or 1-800-492-7862 (FL only)
Sarasota Service Office
78 Sarasota Center Boulevard Sarasota, Florida 34240-9770
(941) 377-3722 or 1-800-320-3503 (FL only)
Tampa Service Office 7601 Highway 301 North Tampa, Florida 33637-6759
(813) 985-7481 or 1-800-836-0797 (FL only)
December 27, 2025
City of Plant City
Attn: Lynn Spivey 1500 Victoria St.
Plant City, FL 33563
Subject: Notice of Agency Action - Approval
ERP Individual Construction
Project Name: McIntosh Park Elements
App ID/Permit No:
County:
917417 / 43044733.003
Hillsborough
Sec/Twp/Rge: S05/T28S/R22E, S08/T28S/R22E, S04/T28S/R22E, S09/T28S/R22E
Dear Permittee(s):
The Southwest Florida Water Management District (District) is in receipt of your application for the Environmental Resource Permit. Based upon a review of the information you submitted, the application is approved.
Please refer to the attached Notice of Rights to determine any legal rights you may have concerning the District's agency action on the permit application described in this letter.
If approved construction plans are part of the permit, construction must be in accordance with these plans.
These drawings are available for viewing or downloading through the District's Application and Permit Search Tools located at www.WaterMatters.org/permits.
The District's action in this matter only becomes closed to future legal challenges from members of the public if such persons have been properly notified of the District's action and no person objects to the District's action within the prescribed period of time following the notification. The District does not publish notices of agency action. If you wish to limit the time within which a person who does not receive actual written notice from the District may request an administrative hearing regarding this action, you are strongly encouraged to publish, at your own expense, a notice of agency action in the legal advertisement section of a newspaper of general circulation in the county or counties where the activity will occur. Publishing notice of agency action will close the window for filing a petition for hearing. Legal requirements and instructions for publishing notices of agency action, as well as a noticing form that can be used, are available from the District's website at www.WaterMatters.org/permits/noticing. If you publish notice of agency action, a copy of the affidavit of publication provided by the newspaper should be sent to the District's Tampa Service Office for retention in this permit's File of Record.
Page 2 App ID/Permit No:917417 / 43044733.003 December 27, 2025
If you have any questions or concerns regarding your permit or any other information, please contact the
Environmental Resource Permit Bureau in the Tampa Service Office.
Sincerely, Robert E. McDaniel, P.E.
Manager
Environmental Resource Permit Bureau
Regulation Division
Approved Permit w/Conditions AttachedEnclosures:
As-Built Certification and Request for Conversion to Operation Phase
Notice of Authorization to Commence Construction
Notice of Rights cc: Jeffrey D. PeQueen, P.E.
Alba Mas, P.E., Dewberry https://www.swfwmd.state.fl.us/sites/default/files/medias/documents/62-330_310_1_-_As-Built_Certification%5B1%5D_0.pdf
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT
ENVIRONMENTAL RESOURCE
PERMIT NO. 43044733.003
EXPIRATION DATE: December 27, 2030 PERMIT ISSUE DATE: December 27, 2025
This permit is issued under the provisions of Chapter 373, Florida Statutes, (F.S.), and the Rules contained in
Chapter 62-330, Florida Administrative Code, (F.A.C.). The permit authorizes the Permittee to proceed with the construction of a surface water management system in accordance with the information outlined herein and shown by the application, approved drawings, plans, specifications, and other documents, attached hereto and kept on file at the Southwest Florida Water Management District (District). All construction, operation and maintenance of the surface water management system authorized by this permit shall occur in compliance with
Florida Statutes and Administrative Code and the conditions of this permit.
INDIVIDUAL CONSTRUCTION
PROJECT NAME: McIntosh Park Elements
City of Plant CityGRANTED TO:
Attn: Lynn Spivey
1500 Victoria St.
Plant City, FL 33563
N/AOTHER PERMITTEES:
ABSTRACT: This permit authorization is for the construction of a stormwater management system serving a
2.45-acre city park project. The proposed activities include the construction of a new entrance drive, parking areas, restroom facilities, boardwalk, and associated infrastructure. Two (2) new wet detention ponds will provide treatment and attenuation for runoff from the project area. The project is located southwest of the intersection of
State Road 39 and Knights Griffin Road, in Hillsborough County.
City of Plant CityOP. & MAIN. ENTITY:
OTHER OP. & MAIN. ENTITY: N/A
COUNTY: Hillsborough
S05/T28S/R22E, S08/T28S/R22E, S04/T28S/R22E, S09/T28S/R22ESEC/TWP/RGE:
TOTAL ACRES OWNED
OR UNDER CONTROL:
PROJECT SIZE:
LAND USE:
DATE APPLICATION FILED:
AMENDED DATE:
Government
May 06, 2025
2.45 Acres
365.45
N/A
I. Water Quantity/Quality
POND No. Area Acres @ Top of Bank Treatment Type
Pond 100 0.24 WET DETENTION SYSTEMS
Pond 200 0.11 WET DETENTION SYSTEMS
Total: 0.35
Water Quantity/Quality Comments:
The proposed ponds provide treatment for runoff from the site via wet detention. The system provides attenuation of the post-development 25-year, 24-hour peak discharge rate to the pre-development 25-year, 24-hour peak discharge rate. The plans and calculations reflect the North American Vertical Datum of 1988
(NAVD 88).
A mixing zone is not required.
A variance is not required.
Encroachment
(Acre-Feet of fill)
Compensation
(Acre-Feet of excavation)
Compensation
Type Encroachment
Result* (feet)
Equivalent Excavation 0.00 5.57 N/A
Floodplain Comment:
Onsite floodplain elevations have been established by site-specific stormwater modeling under ERP No.
43044733.002. Encroachment into the 100-year floodplain has been demonstrated to have no adverse impacts on offsite locations by the construction of equivalent excavation in dedicated areas. Under ERP
No.43044733.002, 566 acre-feet of encroachment was authorized, and the construction of the stormwater management system provides 750 acre-feet of equivalent excavation. Thus, 184 acre-feet of compensation is available. The proposed project will result in 5.57 acre-feet of floodplain encroachment, leaving an excess of
178.4 acre-feet of compensation.
*Depth of change in flood stage (level) over existing receiving water stage resulting from floodplain encroachment caused by a project that claims Minimal Impact type of compensation.
II. 100-Year Floodplain
III. Environmental Considerations
No wetlands or other surface waters exist within the project area.
Specific Conditions
1. If the ownership of the project area covered by the subject permit is divided, with someone other than the
Permittee becoming the owner of part of the project area, this permit may be terminated, unless the terms of the permit are modified by the District or the permit is transferred pursuant to Rule 40D-1.6105, F.A.C. In such situations, each land owner shall obtain a permit (which may be a modification of this permit) for the land owned by that person. This condition shall not apply to the division and sale of lots or units in residential subdivisions or condominiums.
2. The Permittee shall retain the design professional registered or licensed in Florida, to conduct on-site observations of construction and assist with the as-built certification requirements of this project. The Permittee shall inform the District in writing of the name, address and phone number of the design professional so employed. This information shall be submitted prior to construction.
3. This permit also constitutes a grant of water quality certification under Section 401 of the Clean Water Act, 33
U.S.C. Section 1341. Pursuant to Rule 62-330.062, F.A.C. issuance of the individual or conceptual approval permit under this chapter shall constitute certification of compliance with water quality standards.
4. If limestone bedrock is encountered during construction of the stormwater management system, the District must be notified and construction in the affected area shall cease.
5. The Permittee shall notify the District of any sinkhole development in the stormwater management system within
48 hours of discovery and must submit a detailed sinkhole evaluation and repair plan for approval by the District within 30 days of discovery.
6. The Permitted Plan Set for this project includes: the set received by the District on October 28, 2025.
7. The operation and maintenance entity shall provide for the inspection of the permitted project after conversion of the permit to the operation and maintenance phase. For systems utilizing wet detention the inspections shall be performed once every three (3) years after operation is authorized and once every three (3) years thereafter.
Within 30 days of completion of the inspection, or after any failure of a stormwater management system or deviation from the permit, an inspection report shall be submitted to the Agency using Forms 62-330.311(1), “Operation and Maintenance
Inspection Certification”, and 62-330.311(3), “Inspection Checklist”. In the event of any failure of a stormwater management system or deviation from the permit, the inspection report shall describe the remedial actions taken to resolve the failure or deviation.
8. District staff must be notified in advance of any proposed construction dewatering. If the dewatering activity is likely to result in offsite discharge or sediment transport into wetlands or surface waters, a written dewatering plan must either have been submitted and approved with the permit application or submitted to the District as a permit prior to the dewatering event as a permit modification. A water use permit may be required prior to any use exceeding the thresholds in Chapter 40D-2, F.A.C.
9. Off-site discharges during construction and development shall be made only through the facilities authorized by this permit. Water discharged from the project shall be through structures having a mechanism suitable for regulating upstream stages. Stages may be subject to operating schedules satisfactory to the District.
10. The permittee shall complete construction of all aspects of the stormwater management system, including wetland compensation (grading, mulching, planting), water quality treatment features, and discharge control facilities prior to beneficial occupancy or use of the development being served by this system.
11. The following shall be properly abandoned and/or removed in accordance with the applicable regulations:
a. Any existing wells in the path of construction shall be properly plugged and abandoned by a licensed well contractor.
b. Any existing septic tanks on site shall be abandoned at the beginning of construction.
c. Any existing fuel storage tanks and fuel pumps shall be removed at the beginning of construction.
12. All stormwater management systems shall be operated to conserve water in order to maintain environmental quality and resource protection; to increase the efficiency of transport, application and use; to decrease waste; to minimize unnatural runoff from the property and to minimize dewatering of offsite property.
13. Each phase or independent portion of the permitted system must be completed in accordance with the permitted plans and permit conditions prior to the occupation of the site or operation of site infrastructure located within the area served by that portion or phase of the system. Each phase or independent portion of the system must be completed in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of that phase or portion of the system to a local government or other responsible entity.
14. This permit is valid only for the specific processes, operations and designs indicated on the approved drawings or exhibits submitted in support of the permit application. Any substantial deviation from the approved drawings, exhibits, specifications or permit conditions, including construction within the total land area but outside the approved project area(s), may constitute grounds for revocation or enforcement action by the District, unless a modification has been applied for and approved. Examples of substantial deviations include excavation of ponds, ditches or sump areas deeper than shown on the approved plans.
15. This permit does not authorize the Permittee to cause any adverse impact to or "take" of state listed species and other regulated species of fish and wildlife. Compliance with state laws regulating the take of fish and wildlife is the responsibility of the owner or applicant associated with this project. Please refer to Chapter 68A-27 of the Florida
Administrative Code for definitions of "take" and a list of fish and wildlife species. If listed species are observed onsite, FWC staff are available to provide decision support information or assist in obtaining the appropriate FWC permits. Most marine endangered and threatened species are statutorily protected and a "take" permit cannot be issued. Requests for further information or review can be sent to FWCConservationPlanningServices@MyFWC.com.
GENERAL CONDITIONS
1. The general conditions attached hereto as Exhibit "A” are hereby incorporated into this permit by reference and the Permittee shall comply with them.
Robert E. McDaniel, P.E.
Authorized Signature mailto:FWCConservationPlanningServices@MyFWC.com mailto:FWCConservationPlanningServices@MyFWC.com mailto:FWCConservationPlanningServices@MyFWC.com mailto:FWCConservationPlanningServices@MyFWC.com mailto:FWCConservationPlanningServices@MyFWC.com
EXHIBIT A
GENERAL CONDITIONS:
1 The following general conditions are binding on all individual permits issued under this chapter, except where the conditions are not applicable to the authorized activity, or where the conditions must be modified to accommodate, project-specific conditions.
a. All activities shall be implemented following the plans, specifications and performance criteria approved by this permit. Any deviations must be authorized in a permit modification in accordance with Rule 62-330.315, F.A.C., or the permit may be revoked and the permittee may be subject to enforcement action.
b. A complete copy of this permit shall be kept at the work site of the permitted activity during the construction phase, and shall be available for review at the work site upon request by the Agency staff. The permittee shall require the contractor to review the complete permit prior to beginning construction.
c. Activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards. Performance-based erosion and sediment control best management practices shall be installed immediately prior to, and be maintained during and after construction as needed, to prevent adverse impacts to the water resources and adjacent lands. Such practices shall be in accordance with the State of Florida
Erosion and Sediment Control Designer and Reviewer Manual (Florida Department of Environmental Protection and
Florida Department of Transportation, July 2013), and the Florida Stormwater Erosion and Sedimentation Control
Inspector’s Manual (Florida Department of Environmental Protection, Division of Environmental Assessment and
Restoration, Tallahassee, Florida, October 2018), which are both incorporated by reference in subparagraph
62-330.350(1)(c), F.A.C., unless a project-specific erosion and sediment control plan is approved or other water quality control measures are required as part of the permit.
d. At least 48 hours prior to beginning the authorized activities, the permittee shall submit to the Agency a fully executed Form 62-330.350(1), “Construction Commencement Notice,”[effective date], incorporated by reference herein (<http://www.flrules.org/Gateway/reference.asp?No=Ref-02505> ), indicating the expected start and completion dates. A copy of this form may be obtained from the Agency, as described in subsection 62-330.010(5),F.A.C. However, for activities involving more than one acre of construction that also require a NPDES stormwater construction general permit, submittal of the Notice of Intent to Use
Generic Permit for Stormwater Discharge from Large and Small Construction Activities, DEP Form 62-
621.300(4)(b), shall also serve as notice of commencement of construction under this chapter and, in such a case, submittal of Form 62-330.350(1) is not required.
e. Unless the permit is transferred under Rule 62-330.340, F.A.C., or transferred to an operating entity under
Rule 62-330.310, F.A.C., the permittee is liable to comply with the plans, terms and conditions of the permit for the life of the project or activity.
f. Within 30 days after completing construction of the entire project, or any independent portion of the project, the permittee shall provide the following to the Agency, as applicable:
1. For an individual, private single-family residential dwelling unit, duplex, triplex, or quadruplex -
"Construction Completion and Inspection Certification for Activities Associated with a Private
Single-Family Dwelling Unit” [Form 62-330.310(3)]; or
2. For all other activities - As-Built drawings with “As-Built Certification and Request for Conversion to
Operation Phase” [Form 62-330.310(1)].
3. If available, an Agency website that fulfills this certification requirement may be used in lieu of the form .
g. If the final operation and maintenance entity is a third party:
1. Prior to sales of any lot or unit served by the activity and within one year of permit issuance, or within 30 days of as- built certification, whichever comes first, the permittee shall submit, as applicable, a copy of the operation and maintenance documents (see sections 12.3 thru 12.3.4 of Volume I) as filed with the
Department of State, Division of Corporations and a copy of any easement, plat, or deed restriction needed to operate or maintain the project, as recorded with the Clerk of the Court in the County in which the activity is located.
2. Within 30 days of submittal of the as- built certification, the permittee shall submit “Request for Transfer of Environmental Resource Permit to the Perpetual Operation and Maintenance Entity”
[Form 62-330.310 (2)] to transfer the permit to the operation and maintenance entity, along with the documentation requested in the form. If available, an Agency website that fulfills this transfer requirement may be used in lieu of the form.
h. The permittee shall notify the Agency in writing of changes required by any other regulatory agency that require changes to the permitted activity, and any required modification of this permit must be obtained prior to implementing the changes.
i. This permit does not:
1. Convey to the permittee any property rights or privileges, or any other rights or privileges other than those specified herein or in Chapter 62-330, F.A.C.;
2. Convey to the permittee or create in the permittee any interest in real property;
3. Relieve the permittee from the need to obtain and comply with any other required federal, state, and local authorization, law, rule, or ordinance; or
4. Authorize any entrance upon or work on property that is not owned, held in easement, or controlled by the permittee.
j. Prior to conducting any activities on state-owned submerged lands or other lands of the state, title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund, the permittee must receive all necessary approvals and authorizations under Chapters 253 and 258, F.S. Written authorization that requires formal execution by the Board of Trustees of the Internal Improvement Trust Fund shall not be considered received until it has been fully executed.
k. The permittee shall hold and save the Agency harmless from any and all damages, claims, or liabilities that may arise by reason of the construction, alteration, operation, maintenance, removal, abandonment or use of any project authorized by the permit.
l. The permittee shall notify the Agency in writing:
1. Immediately if any previously submitted information is discovered to be inaccurate; and
2. Within 30 days of any conveyance or division of ownership or control of the property or the system, other than conveyance via a long-term lease, and the new owner shall request transfer of the permit in accordance with Rule 62-330.340, F.A.C. This does not apply to the sale of lots or units in residential or commercial subdivisions or condominiums where the stormwater management system has been completed and converted to the operation phase.
m. Upon reasonable notice to the permittee, Agency staff with proper identification shall have permission to enter, inspect, sample and test the project or activities to ensure conformity with the plans and specifications authorized in the permit.
n. If any prehistoric or historic artifacts, such as pottery or ceramics, stone tools or metal implements, dugout canoes, or any other physical remains that could be associated with Native American cultures, or early colonial or American settlement are encountered at any time within the project site area, work involving subsurface disturbance in the immediate vicinity of such discoveries shall cease. The permittee or other designee shall contact the Florida Department of State, Division of Historical Resources, Compliance and
Review Section, at (850) 245-6333 or (800) 847-7278, as well as the appropriate permitting agency office.
Such subsurface work shall not resume without verbal or written authorization from the Division of Historical
Resources. If unmarked human remains are encountered, all work shall stop immediately and notification shall be provided in accordance with Section 872.05, F.S. (2012).
o. Any delineation of the extent of a wetland or other surface water submitted as part of the permit application, including plans or other supporting documentation, shall not be considered binding unless a specific condition of this permit or a formal determination under Rule 62-330.201, F.A.C., provides otherwise.
p. The permittee shall provide routine maintenance of all components of the stormwater management system to remove trapped sediments and debris. Removed materials shall be disposed of in a landfill or other uplands in a manner that does not require a permit under Chapter 62-330, F.A.C., or cause violations of state water quality standards.
q. This permit is issued based on the applicant’s submitted information that reasonably demonstrates that adverse water resource-related impacts will not be caused by the completed permit activity. If any adverse impacts result, the Agency will require the permittee to eliminate the cause, obtain any necessary permit modification, and take any necessary corrective actions to resolve the adverse impacts.
r. A Recorded Notice of Environmental Resource Permit may be recorded in the county public records in accordance with Rule 62-330.090(7), F.A.C. Such notice is not an encumbrance upon the property.
2. In addition to those general conditions in subsection (1) above, the Agency shall impose any additional project-specific special conditions necessary to assure the permitted activities will not be harmful to the water resources, as set forth in Rules 62-330.301 and 62-330.302, F.A.C., Volumes I and II, as applicable, and the rules incorporated by reference in this chapter.
SOUTHWEST FLORIDA
NOTICE OF
WATER MANAGEMENT DISTRICT
AUTHORIZATION
TO COMMENCE CONSTRUCTION
McIntosh Park Elements
PROJECT NAME
PROJECT TYPE
COUNTY
Hillsborough
Government
S05/T28S/R22E...
See Permit for additional STR listings
THIS NOTICE SHOULD BE CONSPICUOUSLY
DISPLAYED AT THE SITE OF THE WORK
Issuing Authority
December 27, 2025DATE ISSUED:
917417 / 43044733.003APPLICATION ID/PERMIT NO:
PERMITTEE
SEC(S)/TWP(S)/RGE(S)
City of Plant City
Robert E. McDaniel, P.E.
Notice of Rights
ADMINISTRATIVE HEARING
1. You or any person whose substantial interests are or may be affected by the District's intended or proposed action may request an administrative hearing on that action by filing a written petition in accordance with
Sections 120.569 and 120.57, Florida Statutes (F.S.), Uniform Rules of Procedure Chapter 28-106, Florida
Administrative Code (F.A.C.) and District Rule 40D-1.1010, F.A.C. Unless otherwise provided by law, a petition for administrative hearing must be filed with (received by) the District within 21 days of receipt of written notice of agency action. "Written notice" means either actual written notice, or newspaper publication of notice, that the
District has taken or intends to take agency action. "Receipt of written notice" is deemed to be the fifth day after the date on which actual notice is deposited in the United States mail, if notice is mailed to you, or the date that actual notice is issued, if sent to you by electronic mail or delivered to you, or the date that notice is published in a newspaper, for those persons to whom the District does not provide actual notice.
2. Pursuant to Subsection 373.427(2)(c), F.S., for notices of intended or proposed agency action on a consolidated application for an environmental resource permit and use of state-owned submerged lands concurrently reviewed by the District, a petition for administrative hearing must be filed with (received by) the
District within 14 days of receipt of written notice.
3. Pursuant to Rule 62-532.430, F.A.C., for notices of intent to deny a well construction permit, a petition for administrative hearing must be filed with (received by) the District within 30 days of receipt of written notice of intent to deny.
4. Any person who receives written notice of an agency decision and who fails to file a written request for a hearing within 21 days of receipt or other period as required by law waives the right to request a hearing on such matters.
5. Mediation pursuant to Section 120.573, F.S., to settle an administrative dispute regarding District intended or proposed action is not available prior to the filing of a petition for hearing.
6. A request or petition for administrative hearing must comply with the requirements set forth in Chapter 28-106, F.A.C. A request or petition for a hearing must: (1) explain how the substantial interests of each person requesting the hearing will be affected by the District's intended action or proposed action, (2) state all material facts disputed by the person requesting the hearing or state that there are no material facts in dispute, and (3) otherwise comply with Rules 28-106.201 and 28-106.301, F.A.C. Chapter 28-106, F.A.C. can be viewed at www.flrules.org or at the District's website at www.WaterMatters.org/permits/rules.
7. A petition for administrative hearing is deemed filed upon receipt of the complete petition by the District Agency
Clerk at the District's Tampa Service Office during normal business hours, which are 8:00 a.m. to 5:00 p.m., Monday through Friday, excluding District holidays. Filings with the District Agency Clerk may be made by mail, hand-delivery or facsimile transfer (fax). The District does not accept petitions for administrative hearing by electronic mail. Mailed filings must be addressed to, and hand-delivered filings must be delivered to, the Agency
Clerk, Southwest Florida Water Management District, 7601 Highway 301 North,Tampa,FL 33637-6759. Faxed filings must be transmitted to the District Agency Clerk at (813) 367-9788. Any petition not received during normal business hours shall be filed as of 8:00 a.m. on the next business day. The District's acceptance of faxed petitions for filing is subject to certain conditions set forth in the District's Statement of Agency Organization and Operation, available for viewing at www.WaterMatters.org/about.
JUDICIAL REVIEW
1. Pursuant to Sections 120.60(3) and 120.68, F.S., a party who is adversely affected by District action may seek judicial review of the District's action. Judicial review shall be sought in the Fifth District Court of Appeal or in the appellate district where a party resides or as otherwise provided by law.
2. All proceedings shall be instituted by filing an original notice of appeal with the District Agency Clerk within 30 days after the rendition of the order being appealed, and a copy of the notice of appeal, accompanied by any filing fees prescribed by law, with the clerk of the court, in accordance with Rules 9. 110 and 9.190 of the Florida