This is a project details image file related to the McIntosh Park Wetland Construction project issued by the City of Plant City, Florida under Invitation for Bid (IFB) 26-048UO-IFB. The image depicts technical specifications for silt fence and turbidity barriers, which are erosion control measures required for the 363-acre wetland excavation and restoration project. The project encompasses wetland construction across multiple cells, on-site stacking of excavated soils to create a 50-foot hill shaped like Florida, installation of reclaimed water piping infrastructure with SCADA-controlled discharge valves, and native wetland vegetation planting. A pre-proposal meeting is scheduled for September 10, 2026 at 10:30 a.m., with bids due September 24, 2026 at 2:00 p.m. The work is located at 775 East Knights Griffin Road in Hillsborough County. Substantial completion must be achieved within 540 calendar days of Notice to Proceed, with final completion required within 30 days thereafter.
The contract is fixed-price with a 5% retainage structure, and the City will award to the lowest responsive and responsible bidder. Local preference of up to one percent discount or $2,500 (whichever is less) applies to qualifying bidders. The project is partially funded through a State of Florida Department of Environmental Protection Grant Agreement No. LPA0038, with all work required to comply with grant terms and conditions. Contractors must self-perform a minimum of 30 percent of total project cost and maintain General Contractor and Underground Utility and Excavation Contractor licenses. Qualifying experience requirements include three projects involving excavation of 300,000 cubic yards or greater within Florida, three projects involving wastewater or reuse collection systems, and two projects involving wetland planting and boardwalk construction. Liquidated damages range from $1,015 to $10,203 per day. Questions are due September 14, 2026, and bids remain valid for 90 days from submittal.
View the file
Other files
Show 40 more
Latest 50 of 131 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .