This is an Invitation for Bid (IFB) document for the McIntosh Park Wetland Construction project issued by the City of Plant City, Florida, under IFB 26-048UO-IFB. The project encompasses the construction and restoration of wetlands across 363 acres at McIntosh Preserve, located at 775 East Knights Griffin Road in Hillsborough County. Primary work includes excavation and restoration of multiple wetland cells, on-site stacking of excavated soils to create a 50-foot hill shaped like Florida, installation of reclaimed water piping infrastructure with SCADA-controlled discharge valves, and native wetland vegetation planting. Bid alternates include unpaved and handicap-accessible paved parking lots, pre-fabricated restroom and pavilion facilities, boardwalk construction, septic system, and water well installation. A pre-proposal meeting is scheduled for September 10, 2026, at 10:30 a.m., with questions due by September 14, 2026. Bids are due electronically via the City's OpenGov portal on September 24, 2026, at 2:00 p.m. and must remain valid for 90 days from submittal. Substantial completion is required within 540 calendar days of Notice to Proceed, with final completion within 30 days thereafter. The City awards contracts to the lowest responsive and responsible bidder.

The project is partially funded through a State of Florida Department of Environmental Protection Grant Agreement No. LPA0038, and all work must comply with grant terms and conditions. A local preference of up to one percent discount or $2,500 (whichever is less) applies to qualifying bidders. The contract is fixed-price with 5% retainage. Contractors must self-perform a minimum of 30 percent of total project cost and maintain active General Contractor and Underground Utility and Excavation Contractor licenses. Qualifying experience requirements include three projects involving excavation of 300,000 cubic yards or greater within Florida, three projects involving wastewater or reuse collection systems, and two projects involving wetland planting and boardwalk construction. Insurance requirements include Workers' Compensation, Commercial General Liability ($500,000 per occurrence/$1,000,000 aggregate), Commercial Automobile Liability ($500,000), and Railroad Protective Liability ($5,000,000 per occurrence/$10,000,000 aggregate). The contractor must provide 24/7 site security using DEFEND 360 cameras with real-time monitoring and recorded footage accessible to the City. Liquidated damages range from $1,015 to $10,203 per day plus 0.00005 of amounts exceeding $20 million.

Other files

File Type Posted
McIntosh_Park_Wetland_Construction_(Addendum_#8_Revision).pdf PDF
Question#78_ReferenceDetail.docx DOCX document
Army_Corps_permit_SAJ-2024-04226(SP-CM)_-_December_19_2025.pdf PDF
CSX_Permit_CSX022389_-_dated_Sept_13,_2023.pdf PDF
Environmental_Resource_Permit_no._43044733.003_-_December_27,_2025.pdf PDF
Hillsborough_County_EPC_review_no.79173_-_February_12,_2025.pdf PDF
MCINTOSH_PARK_INTEGRATED_WATER_MANAGEMENT_PLAN_60%_WETLAND_DESIGN.txt TXT text file
DCS.ctb —
50183029_COVER_SHEET.dwg DWG drawing
E-58-39_e-SHEET.pdf PDF
GRADING_AND_DRAINAGE_PLANS.dwg DWG drawing
HIL2020_468523.sid SID file
McIntosh_Preserve_Logo.jpg JPG image
OP2017_NC_468524_24.sid SID file
OVERALL_SITE_PLAN.dwg DWG drawing
PR22579_McIntosh_Preserve_Evaluation_Update.pdf PDF
Plant_City_Logo.jpg JPG image
SURVEY_CONTROL_SHEET.DWG DWG drawing
Sitework.Paving_-_Surfacing.Cobble_Stone.Heringbone.jpg JPG image
Sitework.Planting.Grass.Short.jpg JPG image
Sitework.Planting.Gravel.Mixed.jpg JPG image
Sitework.Site_Improvements.Fences_-_GatesWood.Shadowbox-Trellis.cutout.jpg JPG image
silt_fence_and_turbidity_barriers_details3702a52e.png PNG image
wetland-solutions-color.png PNG image
x-LIDAR_COPY_final_design_Boardwalk.dwg DWG drawing
x-asbuilt_trails_modified.dwg DWG drawing
x-existing_trees.dwg DWG drawing
x-parcels.dwg DWG drawing
50183029_DETAILS.dwg DWG drawing
50183029_GRADING_AND_DRAINAGE_PLANS.dwg DWG drawing
FDOT_DITCH_BOTTOM_INLET.pdf PDF
HIL2020_468224.sid SID file
Concrete.Precast_Structural_Concrete.Smooth.jpg JPG image
HIL2023_468223.sid SID file
Sitework.Paving_-_Surfacing.Asphalt.1.jpg JPG image
Sitework.Paving_-_Surfacing.Asphalt.bump.jpg JPG image
Concrete.Cast-In-Place.Flat.Grey.1.jpg JPG image
HIL2023_468224.sid SID file
Hydrangea_Blue_Wave_01_mask.gif GIF image
Masonry.Stone.Fieldstone.Uncoarsed.Tight.jpg JPG image
Masonry.Unit_Masonry.Brick.Modular.Flemish_Cross.bump.jpg JPG image
McIntosh_Preserve_Tierra_Report_2025-03-11.pdf PDF
2026-08-19_McIntosh_Park_Wetland_Construction.pdf PDF
2020-06-03_-_LPA0038_-_Agreement_(executed_06.03.20)_(3).pdf PDF
053-2023_-_LPA0038_-_Amendment_2.pdf PDF
McIntosh_Park_100%_Wetland_Design_with_Electrical_061325.pdf PDF
Defend360_Digital-Owners-Manual_2025.pdf PDF
Safety_and_Site_Security.docx DOCX document
2020-05-13_McIntosh_Park_Integrated_Water_Master_Plan_(Q125).pdf PDF
2020-06-03_-_LPA0038_-_Agreement_(executed_06.03.20).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .