M&P_ALLOWANCE_Line_Items.docx

DOCX document 18 KB Posted

Attached to
McIntosh Park Wetland Construction
Solicitation number
26-048UO-IFB
Issued by
Hillsborough County, Florida

About this file

M&P_ALLOWANCE_Line_Items.docx Summary

This document is a line item allowance schedule prepared by the City of Plant City, Florida for the McIntosh Park Wetland Construction project (IFB 26-048UO-IFB). The file details itemized costs and allowances for various construction components of the 363-acre McIntosh Preserve project, including wetland excavation and restoration, soil stacking, reclaimed water piping infrastructure, and native vegetation planting. The schedule also encompasses bid alternates for optional recreational amenities such as unpaved and paved parking lots, restroom and pavilion facilities, boardwalk construction, septic systems, and water well installation. Bids are due September 24, 2026 at 2:00 p.m., with a pre-proposal meeting scheduled for September 10, 2026 at 10:30 a.m. The project is located at 775 East Knights Griffin Road in Hillsborough County, and substantial completion is required within 540 calendar days of Notice to Proceed, with final completion within 30 days thereafter.

The contract is fixed-price with 5% retainage, and the City will award to the lowest responsive and responsible bidder. The project is partially funded through a State of Florida Department of Environmental Protection Grant Agreement No. LPA0038, and all work must comply with grant terms and conditions. A local preference of up to one percent discount or $2,500 (whichever is less) applies to qualifying bidders. The contractor must self-perform a minimum of 30 percent of total project cost and maintain appropriate licensing. Liquidated damages range from $1,015 to $10,203 per day plus 0.00005 of amounts exceeding $20 million. Insurance requirements include Workers' Compensation, Commercial General Liability ($500,000 per occurrence/$1,000,000 aggregate), Commercial Automobile Liability ($500,000), and Railroad Protective Liability ($5,000,000 per occurrence/$10,000,000 aggregate). Bids must be submitted electronically via the City's OpenGov portal and remain valid for 90 days from submittal.

View the file

Other files

File Type Posted
McIntosh_Park_Wetland_Construction_(Addendum_#10_Revision).pdf PDF
McIntosh_Park_Wetland_Construction_(Addendum_#8_Revision).pdf PDF
PCFR_Open_Burn_Permit.docx DOCX document
Question#94_WHEELSTOP_DETAIL.pdf PDF
Question#78_ReferenceDetail.docx DOCX document
Question_51_UpdatedTable.pdf PDF
Question_52_UpdatedTable.pdf PDF
CSX_Permit_CSX022389_-_dated_Sept_13,_2023.pdf PDF
Environmental_Resource_Permit_no.43044733.002_-_May_24,_2024.pdf PDF
Environmental_Resource_Permit_no._43044733.003_-_December_27,_2025.pdf PDF
Hillsborough_County_EPC_review_no.79173_-_February_12,_2025.pdf PDF
Hillsborough_County_EPC_-_review_no.69805_-September_30,_2025.pdf PDF
Army_Corps_permit_SAJ-2024-04226(SP-CM)_-_December_19_2025.pdf PDF
MCINTOSH_PARK_INTEGRATED_WATER_MANAGMENT_PHASE_II.dst —
MCINTOSH_PARK_INTEGRATED_WATER_MANAGEMENT_PLAN_60%_WETLAND_DESIGN.txt TXT text file
x-survey_base.dwg DWG drawing
additonal_Lidar_contours_Exp.dwg DWG drawing
DCS.ctb —
silt_fence_and_turbidity_barriers_detailsce8ff31f.png PNG image
silt_fence_and_turbidity_barriers_detailsb2baa412.png PNG image
silt_fence_and_turbidity_barriers_details3702a52e.png PNG image
2013RevisedDesignerManual_-_Part2_2152afa2d9.png PNG image
dewberry-master_template_22x34.dwt —
PR22579_McIntosh_Preserve_Evaluation_Update.pdf PDF
FDOT_DITCH_BOTTOM_INLET.pdf PDF
E-58-39.pdf PDF
E-58-39_e-SHEET.pdf PDF
HIL2020_468223.sid SID file
WETLAND_IMPACT_MAP.dwg DWG drawing
WETLAND_DELINEATION_MAP.dwg DWG drawing
SURVEY_CONTROL_SHEET.DWG DWG drawing
STANDARD_DETAILS.dwg DWG drawing
PLANTING_PLAN.dwg DWG drawing
OVERALL_SITE_PLAN.dwg DWG drawing
KEY_SHEET.dwg DWG drawing
GRADING_AND_DRAINAGE_PLANS.dwg DWG drawing
GENERAL_NOTES_AND_LEGEND.dwg DWG drawing
EXISTING_CONDITIONS_PLAN.dwg DWG drawing
COVER_SHEET.dwg DWG drawing
wetland-solutions-color.png PNG image
Plant_City_Logo.jpg JPG image
OP2017_NC_468524_24.sid SID file
OP2017_NC_468523_24.sid SID file
OP2017_NC_468224_24.sid SID file
OP2017_NC_468223_24.sid SID file
McIntosh_Preserve_Logo.jpg JPG image
HIL2020_468524.sid SID file
HIL2020_468523.sid SID file
HIL2020_468224.sid SID file
DewberryLogo_RGB.jpg JPG image
Show 40 more

Latest 50 of 131 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. TESTING ALLOWANCE

1. Method of Measurement: The quantity to be paid for under this Section shall be based on the actual fees paid to qualified testing companies for all materials sampling and testing required for the project, plus an overhead allowance not to exceed ten percent (10%) of the actual testing cost.

2. Basis of Payment: The amount to be paid under this allowance shall be the actual fees paid to testing companies for materials sampling and testing and shall be in accordance with the current standards and as prescribed under the specifications for testing. The testing shall include sampling, transportation to the State approved laboratory facilities, sample preparation and testing and reporting on the values determined under the laboratory testing. The Contractor will be responsible to pay for all failed tests and for subsequent retesting to meet quality and standard conditions. Whenever nonconformance is detected or determined by the CITY as a result of the tests, the Contractor shall bear the full cost of additional tests which are ordered by the CITY to ascertain that subsequent conformance is obtained with the contract documents. Includes all tests required in the plans, technical specifications, permit requirements, and by governing agencies with jurisdiction over this project.

B. PERMITTING ALLOWANCE

1. Method of Measurement: The quantity to be paid for under this Section shall be the actual fees incurred by the Contractor, plus an overhead allowance not to exceed ten percent (10%) of the actual permitting cost.

2. Basis of Payment: The amount to be paid under this allowance shall be the permit fees charged by the approving agencies for permits required for the performance of the work and that are required to be obtained by the contractor. The contractor shall be required to provide proof of the permit fees incurred before money associated with this allowance will be paid. The CITY reserves the right to award any, all, or none of the money associated with this allowance.

C. EVENTS AND SECURITY CAMERA Allowance

1. Method of Measurement: The quantity to be paid for under this Section shall be the actual fees incurred by the Contractor, plus an overhead allowance not to exceed ten percent (10%) of the actual cost.

2. Basis of Payment: Eligible work under this allowance includes, but is not limited to, CITY‑directed preparations, setup, and support for groundbreaking ceremonies, grand opening ceremonies, and the installation and operation of temporary security cameras per the attached specification to monitor the construction site during the project. The CITY must provide written authorization approving both the scope of work and the associated fee under this pay item prior to any work being performed. Payment will be issued upon submission of verifiable costs and supporting documentation, and upon acceptance of the completed work by the CITY.

City of Plant City Utilities

File details come from the government source that posted it. Updated .