STAZMA_1.PDF

PDF 106 KB Posted

Attached to
Master Agreement AZ|CTR057595
Contract number
CTR057595
Issued by
Arizona

About this file

The document is an email exchange between Elizabeth Burgard from the Arizona Game and Fish Department and Brian Iserman of JE Fuller/Hydrology & Geomorphology, Inc., concerning a solicitation (BPM003384) for Hydrological Engineering Services. The communication involves price negotiations for a state contract, with JE Fuller having advanced to the final selection list for the procurement.

The solicitation requires JE Fuller to submit updated overhead rates, including a new Senior Programmer position and a special mileage rate for heavy-duty 4-wheel drive vehicles. Burgard requested Iserman to complete and return project multipliers documentation by June 29, 2021, at 5 PM, as part of the final stage of the contract evaluation process. The contract appears to be focused on hydrological engineering services, with the potential for future project work for the Arizona Game and Fish Department, though specific contract details, total value, and duration are not explicitly outlined in this document.

View the file

Other files

File Type Posted
BPM003384_-_Evaluation_SPO_Form_120_-_Procurement_Disclosure_Statement_narasin.pdf PDF
CERT-902318121.pdf PDF
CTR057595_YR5_Contract_Renewal_AZGFD_Signed.pdf PDF
CTR057595__JE_Fuller_Hydrological_Engineering_Services_-Insurance.pdf PDF
CTR057595__JE_Fuller_Hydrological_Engineering_Services_Executed_-_YR2.pdf PDF
Evaluation_Team_Meeting_Sign_in_Sheet.docx DOCX document
JE_Fuller_BAFO_Sheet_9-15-21-Signed.pdf PDF
JE_Fuller_Negotiations_Sheet_6-18-2021__6-21-21_Fuller.pdf PDF
Proposal_Score_Sheet_BPM003384.xlsx XLSX spreadsheet
ST21E9_1.PDF PDF
STAZMA_3.PDF PDF
hydro_evals_June_2021_gbleyl.pdf PDF
EXECUTIVE_SUMMARY_BPM003384.pdf PDF
Evaluation_for_Committee_Members_-drodriguez.pdf PDF
Guidelines_for_Evaluation_for_Committee_Members.pdf PDF
JEFuller_CORRECTED_O_A_for_BPM003384_signed.pdf PDF
JE_Fuller_AZ_Corp_Commision_report.docx DOCX document
STAZMA_2.PDF PDF
STAZMail_to_Unsucessfuls-_10-14-21_Solicitation_-_BPM003384__Hydro_Engineering_Services.pdf PDF
pds_drodriguez_pg2.jpeg JPEG file
pds_drodriguez_pg3.jpeg JPEG file
CTR057595_JE_Fuller_Hydrological_Engineering_Services-YR3.pdf PDF
Evaluation_Narrative_for_BPM003384_-_NS.pdf PDF
Proposal_Score_Sheet_BPM003384.xlsx_-_drodriguez.pdf PDF
Proposal_Score_Sheet_BPM003384_-_NS.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination.docx DOCX document
RFP_BPM003384_Hydro_Eng_Services_Award_Determination.pdf PDF
RFP_BPM003384_Hydro_Eng_Services_Award_Determination_signed.pdf PDF
STAZMA_4.PDF PDF
STAZMail_10-14-21-_NOA-_BPM003384__Hydro_Engineering_Services_-_JE_Fuller.pdf PDF
TO_JE_Fuller_BAFO_Sheet_9-15-21.xlsx XLSX spreadsheet
BPM003384_Due_Diligence_Check_List.pdf PDF
BPM003_2.PDF PDF
CERT-416374195.pdf PDF
Evaluation_Narrative_for_BPM003384_-NS.pdf PDF
Evaluation_Score_BPM003384.pdf PDF
Fuller_Certificate_-_AZ_G_F_5-1-21_to_5-1-22.pdf PDF
JEFuller-SOQ-BPM003384.pdf PDF
JE_Fuller_Negotiations_Sheet_8-10-21Fuller.xlsx XLSX spreadsheet
SAM_EntityInformation-JE_Fuller.pdf PDF
ST1A87_1.PDF PDF
STAZ_Mail_-_BPM003384_-_Evaluation_Committee_ENGSERVICES-_HYDRO.pdf PDF
pds_drodriguez_pg1.jpeg JPEG file
CTR057595_Renewal_Yr4.pdf PDF
JE_Fuller_Negotiations_Sheet_8-10-21Fuller.pdf PDF
Arizona_Game_and_Fish_Department_JE_Fuller_Hydrology___Geomorphology_25_GL_24_AU_WC_PROF_24__8-21-2025_1293635259.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6/21/2021 State of Arizona Mail - RE: JE Fuller: Solicitation BPM003384 Hydrological Engineering Services -Price Negotiations https://mail.google.com/mail/u/0?ik=0fa87e1f2a&view=pt&search=all&permthid=thread-a%3Ar2229780912360168071%7Cmsg-f%3A1702943165863… 1/2

Elizabeth Burgard <eburgard@azgfd.gov>

RE: JE Fuller: Solicitation BPM003384 Hydrological Engineering Services -Price Negotiations

1 message

Brian Iserman <brian@jefuller.com> Fri, Jun 18, 2021 at 2:52 PM To: Elizabeth Burgard <EBURGARD@azgfd.gov>

Hi Ms. Burgard:

Attached please find our updated overhead rates for this contract. I took the liberty to add one category, including Senior Programmer, which is a new position we hired last year to help support our work for the Arizona Game and Fish Department.

I also added a row for a special mileage rate for heavy duty 4-wheel drive vehicles.

Thanks, Brian

BRIAN ISERMAN | PE, CFM

JE Fuller/Hydrology & Geomorphology, Inc.

Hydrologist

8400 S Kyrene Rd, Suite 201 | Tempe, AZ 85284

Office: (480) 222-5713 | Mobile: (480) 316-4807 www.JEFuller.com -www.JEFullerdata.com

From: Elizabeth Burgard <EBURGARD@azgfd.gov>

Sent: Wednesday, June 16, 2021 4:54 PM

To: Brian Iserman <brian@jefuller.com>

Subject: JE Fuller: Solicitation BPM003384 Hydrological Engineering Services -Price Negotiations

Brian Iserman

JE Fuller Hydrology & Geomorphology Inc.

8400 S. Kyrene Road, Suite 201

Tempe, AZ 85284 brian@jefuller.com

Dear Mr. Iserman;

The Arizona Game and Fish Department has completed a final list regarding the evaluation of solicitation BPM003384 Hydrological Engineering Service.

Your firm has advanced to the final list. Thank you for your participation in the solicitation process. In order to begin conducting the price negotiations, attached is a request for project multipliers.

Please complete and sign the attached document and return it to me at eburgard@azgfd.gov. This documentation is requested to be received before 5 PM on Tuesday, June 29, 2021.

https://www.google.com/maps/search/8400+S+Kyrene+Rd,+Suite+201+%7C+Tempe,+AZ+85284+%0D%0A+Office:+(480?entry=gmail&source=g https://www.google.com/maps/search/8400+S+Kyrene+Rd,+Suite+201+%7C+Tempe,+AZ+85284+%0D%0A+Office:+(480?entry=gmail&source=g http://www.jefuller.com/ http://www.jefullerdata.com/ mailto:EBURGARD@azgfd.gov mailto:brian@jefuller.com https://www.google.com/maps/search/8400+S.+Kyrene+Road,+Suite+201+%0D%0A+Tempe,+AZ+85284?entry=gmail&source=g https://www.google.com/maps/search/8400+S.+Kyrene+Road,+Suite+201+%0D%0A+Tempe,+AZ+85284?entry=gmail&source=g mailto:brian@jefuller.com mailto:eburgard@azgfd.gov

6/21/2021 State of Arizona Mail - RE: JE Fuller: Solicitation BPM003384 Hydrological Engineering Services -Price Negotiations https://mail.google.com/mail/u/0?ik=0fa87e1f2a&view=pt&search=all&permthid=thread-a%3Ar2229780912360168071%7Cmsg-f%3A1702943165863… 2/2

Sincerely;

ELIZABETH BURGARD I PROCUREMENT SUPERVISOR

ARIZONA GAME AND FISH DEPARTMENT

OFFICE: 623.236.7459, FAX: 623.236.7327

EMAIL: eburgard@azgfd.gov

5000 West Carefree Highway, Phoenix, AZ 85086

Join our new Conservation Membership program and ensure a wildlife legacy for the future.

[EXTERNAL]

Negotiations Sheet 6-18-2021 JEF.pdf

183K mailto:eburgard@azgfd.gov https://www.google.com/maps/search/5000+West+Carefree+Highway,+Phoenix,+AZ+85086?entry=gmail&source=g https://www.azwildlifehero.com/support-us/become-a-member https://mail.google.com/mail/u/0?ui=2&ik=0fa87e1f2a&view=att&th=17a211c969fca227&attid=0.1&disp=attd&safe=1&zw

File details come from the government source that posted it. Updated .