AMD 0008 SF30 FINAL.pdf
PDF 147 KB Posted
- Solicitation number
- SPE602-20-R-0704
- Issued by
-
Defense Logistics Agency Energy
About this file
This amendment modifies a solicitation for bulk petroleum products for the Rocky Mountain, West Coast, and Offshore regions. Key details include:
-
The solicitation number is SPE602-20-R-0704 and covers fuel procurement for various bases through September 2021, with delivery from award date through September 2020 and a 30-day carryover period. Delivery methods include tanker, barge, truck, and pipeline on both FOB origin and destination terms.
-
Amendments update contract clauses, add new clauses on small business subcontracting, restricted materials, and cybersecurity. Notes address manufacturing discontinuations, supply chain documentation retention, and potential post-award product verification testing.
-
The pre-proposal conference was on January 22, 2020 at Fort Belvoir, Virginia. Questions should be directed to the listed contacts. Offers are due through the Bulk OET system by February 12, 2020 at 3PM. Award will be made for the period through September 2021.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60220R0704
X
2020 JAN 10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM PRODUCT
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
JUNE 17, 2020
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Rocky Mountain / West Coast / Offshore
SPE602-20-R-0704
Amendment 0008
The changes set forth herein are incorporated into Solicitation SPE602-20-R-0704. A conformed copy of the solicitation is attached for your convenience.
Section I - Contract Clauses
1. FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUES OR
EXECUTIVE ORDERS – COMMERCIAL ITEMS (MAR 2020) is hereby updated replacing OCT 2019.
Sub clauses #25 and #26 are hereby added as follows:
(25) 52.219-32 ORDERS ISSUED DIRECTLY UNDER SMALL BUSINESS RESERVES (MAR 2020)(15 U.S.C.644(r)). (unchecked)
(26) 52.219-33 NONMANUFACTURER RULE (MAR 2020(15 U.S.C.637(a)(17)). (checked)
2. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998), FAR/DFAR internet addresses links are hereby updated as follows:
A. Federal Acquisition Regulation (FAR) https://www.ecfr.gov/cgi-bin/text-idx?SID=ca5c29d9c34840a6bea620fe03a6fb6d&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl Volume 1 and 2, Chapter 1.
B. Department of Defense Federal Acquisition Regulation Supplement (DFARS) https://www.ecfr.gov/cgi-bin/text-idx?SID=ca5c29d9c34840a6bea620fe03a6fb6d&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl Volume 3, Chapter 2.
3. DFARS 252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)- BASIC. (DEC 2019) is hereby updated replacing MAY 2019.
4. DFARS 252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS AND
TUNGSTEN (DEC 2019) is hereby updated replacing APRIL 2019.
5. DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEC 2019) is hereby updated replacing OCT 2016.
6. PROCUREMENT NOTE C02 MANUFACTURING PHASE-OUT OR DISCONTINUATION OF
PRODUCTION, DIMINISHING SOURCES, AND OBSOLETE MATERIALS OR COMPONENTS (DEC
2016) is hereby added. Text contained as follows: The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components.
The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without https://www.ecfr.gov/cgi-bin/text-%20%20%20%20idx?SID=ca5c29d9c34840a6bea620fe03a6fb6d&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl https://www.ecfr.gov/cgi-bin/text-%20%20%20%20idx?SID=ca5c29d9c34840a6bea620fe03a6fb6d&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=ca5c29d9c34840a6bea620fe03a6fb6d&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=ca5c29d9c34840a6bea620fe03a6fb6d&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl
Amendment 0008 the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government- Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
7. PROCUREMENT NOTE C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY
DOCUMENTATION (JUN 2020) is hereby updated replacing SEPT 2016. Text contained as follows:
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements. (2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer’s batch identification for the item(s), such as date codes, lot codes, or serial numbers. (3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- Avoidance-Program/)). (4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
8. PROCUREMENT NOTE E05 PRODUCT VERFICATION TESTING (JUN 2018) contract text was inadvertently incomplete. Full text has been entered into Amendment 0008 conformed copy and is contained as follows: (1) Product verification testing (PVT) may be invoked at contract award or after contract award. If PVT is invoked at contract award, the contract will explicitly state this testing requirement and a QALI will be generated. If PVT is invoked after contract award, a QALI will be created and the DCMA quality assurance representative (QAR) will notify the contractor that testing will be performed. The PVT testing will be performed at a Government-designated testing laboratory. (a) The contractor shall not ship or deliver any material unless directed to do so in writing by the contracting officer or until notified of acceptable PVT results. (b) PVT results will be provided in 20 working days after receipt at the Government testing facility, unless otherwise specified in writing by the Government. (2) The http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/) http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/)
Amendment 0008
QAR will select a random sample from the contractor’s production lot. Selected PVT samples are to be shipped by the contractor with a copy of the Department of Defense DD Form 250 and the completed DD Form 1222. The packaging will be marked “Product Verification Test Samples, Contract number, lot/item number." (3) Test results will indicate one of the following: (a) Samples that pass testing and are not destroyed during evaluation will be returned to the contractor at the Government's expense and will be included as part of the total contract quantity. The contractor and Government may agree to dispose of samples not destroyed when the cost of the item does not justify the shipping expense. Samples that pass testing and are not returned to the contractor will be considered part of the contract quantity for payment and delivery. The contractor will deliver the remaining lot quantity minus sample units. (b) If samples fail testing, such failure will result in rejection of the entire contract lot from which the samples were taken. At the Government’s discretion, parts failing any test criteria may be retained and not be returned to the contractor.
Section K – Representations, Certifications and Statements
9. FAR 52.219-7 NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE (DEVIATION 2019-O0003)(JAN
2019) is hereby removed.
10. FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (MAR 2020)(DEVIATION 2020-O0008) is hereby updated replacing Jan 2019 (deviation 2019-O0003).
Section M – Evaluation Factors for Award
11. FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014) (a) FACTOR 1: TECHNICAL ACCEPTABILITY SUBFACTOR (3) Inspection and Acceptance, Section E is revised as follows:
(i) Offer meets all inspection requirements outlined in Section E provisions
(ii) Offeror certifies that it has a Quality Control Plan (QCP) on file with DLA Energy that is no more than 24 months old or provides an outline, not to exceed two pages in length of a proposed QCP describing the offeror’s current inspection system and quality assurance procedures, with references to the corresponding requirements in provisions E1 and/or E1.21.
| AMD 0008 SF30 FINAL |
| AMD 0008 draft June 17 |
File details come from the government source that posted it. Updated .