Attachment J.2 - PWS DDHU Site Specific 7_6_2021.docx

DOCX document 80 KB Posted

Attached to
Distribution and Warehousing Services DLA Distribution Hill AFB, Utah Federal contract opportunity
Solicitation number
SP3300-21-R-5005
Issued by
Defense Logistics Agency Distribution

About this file

This document provides details regarding a pre-solicitation notice for distribution and warehousing services at DLA Distribution Hill Air Force Base in Utah. The scope of work includes management, personnel, supervision, material, tools, equipment, transportation, and other services to meet requirements. The incumbent contractor is Amentum Services, Inc. under Contract SP3300-17-D-5001 expiring April 30, 2022. The requirement is for an Indefinite Delivery Indefinite Quantity contract with a five-year period of performance from February 1, 2022 through January 31, 2027 including a three-month transition period. The solicitation number is SP3300-21-R-5005 with an estimated issuance date of July 30, 2021. The NAICS code is 493110 with a size standard of $30 million. The Defense Logistics Agency Distribution is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehousing Services DLA Distribution Hill AFB, Utah, newest first.
File Type Posted
Attachment 1 - J.29 Staffing Matrix 8_31_2021.xlsx XLSX spreadsheet
Attachment 4 - J.6 CDRLs.pdf PDF
Attachment 3 - Questions from Industry and Government Responses 8_31_2021.pdf PDF
Attachment 4 - Questions from Industry and Government Responses 8_26_2021.pdf PDF
Attachment 1 - J.1 Performance Work Statement PWS 8_26_2021.docx DOCX document
SP3300-21-R-5005_0003_SF30.pdf PDF
Attachment 2 - J.2 PWS DDHU Site Specific 8_18_2021.docx DOCX document
Attachment 3 - J.3 WD 2015-5483 Rev 14.pdf PDF
Attachment 8 - Questions from Industry and Government Responses 8_18_2021.pdf PDF
Attachment 6 - SP330021R5005 0002 8_18_2021.pdf PDF
Attachment 5 - J.29 - Staffing Matrix 8_18_2021.xlsx XLSX spreadsheet
Attachment 4 - J.23 TE 5.2 8_18_2021.xlsx XLSX spreadsheet
Attachment 1 - J.1 Performance Work Statement PWS 8_18_2021.docx DOCX document
SP3300-21-R-5005_0002_SF30.pdf PDF
DDHU Teleconference- SIte Tour Attendee Roster.pdf PDF
DDHU PPC Brief 8.11.21 FINAL UPDATED POST PPC.pptx PPTX presentation
SP3300-21-R-5005_0001_SF30.pdf PDF
Attachment 1 - SP330021R5005 0001 8_9_21.pdf PDF
Attachment J.30 - Proposed Training Hours.xlsx XLSX spreadsheet
Attachment J.26 - TE 5.6 Local Delivery and Pickup Points.xlsx XLSX spreadsheet
Attachment J.23 - TE 5.2 Projected Workload 7_6_2021.xlsx XLSX spreadsheet
Attachment J.21 - TE 5.0 APLs 7_6_2021.doc DOC document
Attachment J.16 - TE 4.1 Contractor Training.docx DOCX document
Attachment J.13 - TE 3.4 Government MHE and Misc.XLSX XLSX spreadsheet
Attachment J.5 - CLIN X006 Labor Rate Table.xlsx XLSX spreadsheet
Attachment J.1 - Performance Work Statement PWS 7_6_2021.docx DOCX document
Notice Supplement 1 - DDHU Preproposal Teleconference -Site Visit Instructions (7-28-21).pdf PDF
Attachment J.33 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment J.28 - TE 6.1 Government Forms.docx DOCX document
Attachment J.19 - TE 4.5 Other Equipment and PM Tasks.xls XLS spreadsheet
Attachment J.12 - TE 3.3 Government Data Systems 7_6_2021.docx DOCX document
Attachment J.7 - TE 1.1 Contractor Personnel Security.docx DOCX document
Attachment J.6 - CDRLs.pdf PDF
Attachment J.34 - Past Performance Questionnaire.docx DOCX document
Attachment J.32 - Small Business Participation Commitment Document Template 5_5_21.docx DOCX document
Attachment J.29 - Staffing Matrix 7_6_2021.xlsx XLSX spreadsheet
Attachment J.27 - TE 5.9 DSS Program Loading Data.docx DOCX document
Attachment J.25 - TE 5.5 Type Physical Inventory Code (TPIC) Matrix.docx DOCX document
Attachment J.14 - TE 3.5 GE Misc Equipment and PM Task Hours.xls XLS spreadsheet
Attachment J.11 - TE 3.2 Government Training.docx DOCX document
Attachment J.10 - TE 3.1 Government Facilities (GF).docx DOCX document
Attachment J.8 - TE 1.2 CAC Procedures.docx DOCX document
Attachment J.3 - WD 2015-5483 Rev 12.pdf PDF
Attachment J.31 - DDHU Training Calendar Feb thru Apr 2022.xlsx XLSX spreadsheet
Attachment J.24 - TE 5.4 Transshipment of Hazardous Assets.docx DOCX document
Attachment J.22 - TE 5.1 DDHU Historical Workload Update Jan 2021.docx DOCX document
Attachment J.20 - TE 4.6 Contractor Equipment List - July 2020.xlsx XLSX spreadsheet
Attachment J.18 - TE 4.3 MHE PM Tasks.xls XLS spreadsheet
Attachment J.17 - TE 4.2 Gov Operated Equipment for Contractor Maintenance.xlsx XLSX spreadsheet
Attachment J.15 - TE 3.8 Environmental Storage Control.docx DOCX document
Show all 50

Distribution and Warehousing Services DLA Distribution Hill AFB, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.2

SP3300-21-R-5005

Section C-1AF General Conditions And Requirements

A. This supplement to the PWS details the requirements associated with warehouse and distribution operations performed at the Distribution Center located at DLA Distribution Hill, UT.

B. In addition to the requirements identified in Attachment J.1, Section C, the Contractor shall perform all of the requirements in Attachment J.2, Section C-AF, site-specific requirements. The requirements described in Attachment J.2, Section C-AF are those required by the Hill Air Force Base (HAFB) Hill, UT.

C-1.1AF Scope of Work

A. DLA Distribution Hill, UT is located at HAFB, UT and collocated with Ogden Air Logistics Center (OO-ALC or host installation) in a complex. The Depot is situated 30 miles north of Salt Lake City, 9 miles south of Ogden, and 15 miles east of the Great Salt Lake. The airport is approximately 35 miles southwest of DLA Distribution Hill, UT. For functions included in this PWS, DLA Distribution Hill, UT encompasses 1.488 million square feet of covered storage and operational space and 1.054 million square feet of open storage space.

B. From its in-stock inventory of nearly seven (7) billion dollars, DLA Distribution Hill, UT provides wholesale distribution support for the OO-ALC, other tenants, and worldwide customers. DLA Distribution Hill, UT provides distribution and delivery services to support the overhaul and repair efforts of HAFB Depot-level maintenance. DLA Distribution Hill, UT supports the 388th Fighter Wing, Field Training Detachment, RAPIDS, Utah National Guard, Air National Guard, and the Utah Test Range (UTTR). Another major customer is The US Army Medical Materiel Agency (USAMMA). Worldwide customers include all the Armed Forces as well as foreign military services.

C-1.2.2.1AF Additional Holidays

IAW Wage Determination 2015-5483, Revision 10, dated 12/29/2019, Good Friday is an observed Holiday under this contract. Upon coordination with the COR, Contractor employees shall substitute this holiday for another day off with pay IAW this PWS and the work schedule communicated to the employees involved as operations will continue on Good Friday.

C-1.2.3AF Duty Hours and Access to the Host Installation

A. The Contractor shall provide staffing for business hours and on-call response (see paragraph C-5.1.5.1, Attachment J-1 PWS, On-Call Response Roster) for twenty-four (24) hours a day, seven (7) days a week support to meet the requirements in the PWS. Historically, DLA Distribution Hill has processed workload from 0000-2400 hours Monday through Sunday. Approximately 72 percent of the monthly issue workload is IPG1 and IPG2 (high priority). Three percent of the monthly high priority requisitions are received during the weekend (1 percent on Sunday and 2 percent on Saturday). The Contractor shall provide staffing as necessary during the hours and on the days deemed necessary by the Contractor to meet all APLs in TE 5.0. The Contractor may be required to establish or increase level of effort for a 2nd and/or 3rd shift operations to meet processing the workload in TE 5.2, Projected Workload and throughout performance to meet accelerated customer requirements.

B. The Government workforce at DLA Distribution Hill Utah normal business hours are 0700-1530 hours (7:00 am – 3:30 pm) Mountain Standard Time weekdays.

C. The host installation is currently accessible as provided in the table below. It should be noted that changes to Gate hours can occur without prior notification.

Gate
Location
Days/Hours of Operation
Roy
Exit 338 off I-15
Monday – Sunday 0000 – 2400
South
Exit 331 off I-15
Monday – Sunday 0000 – 2400
Southwest
Exit 334 off I-15
Monday – Friday 0500 – 1800
West
Exit 335 off I-15
Monday – Friday 0500 – 1800

D. Commercial carriers must enter through the Roy Gate as addressed in the Transportation Facilities Guide (TFG). Arms, Ammunition and Explosives (AA&E) and some hazardous material (HAZMAT) must enter through the Roy Gate.

E. A DoD Common Access Card (CAC) is required for entrance to the host installation. All visitors must register through the Visitor Control Centers at the South or West gates. The West Gate Visitor Control Center is open 0700 – 1500 Monday through Friday (closed weekends and holidays). The South Gate Visitor Center is open 0700 – 1800 Monday through Friday and on Reserve weekends (closed weekends and holidays).

F. The DLA Distribution Hill, UT region is in an earthquake zone and has a history of severe winter storms. The host installation is responsible for announcing delays or closures due to weather related emergencies. These announcements can be heard or seen on local radio or television stations.

SECTION C-3AF GOVERNMENT PROPERTY, EQUIPMENT, SYSTEMS, TRAINING AND SUPPORT SERVICES C-3.1.1AF Government Facilities

The facilities and open storage areas listed in TE 3.1, Government Facilities (GF), are currently used in the performance of the DLA Distribution Hill, UT warehouse and distribution operations and are being provided for use in the performance of the contract requirements.

C-3.4.4AF Fuels

Fuel services will consist of gasoline, natural gas, Compressed Natural Gas (CNG), propane gas, Liquefied Petroleum Gas (LPG), and diesel fuel for the operation of all Government provided vehicles/equipment that use these types of fuel and are exclusively associated with the performance of the DLA Distribution Hill, UT mission. Gasoline and diesel fuels are located on base at Building 924. Mobile gas/diesel service is also available. CNG is available at Building 1139. LPG tanks are refilled every other week to Building 850A or if refilling is required prior to scheduled delivery (see Section 4.5.15AF below).

SECTION C-4AF CONTRACTOR REQUIREMENTS

C-4.1AF Government Facilities The Contractor is not responsible for maintenance of GF as required under FAR Part 52.245-1(f)(1)(ix), Maintenance, except to replace the light bulbs in the Exit and Emergency Lighting signs and procuring and replacing light/fluorescent lamps ten (10) feet and under in the section or work centers they occupy IAW Base Civil Engineer Facility Manager’s Handbook OALC-HAFB. (Located in Technical Library) The Contractor shall test the Exit and Emergency Lighting signs monthly and change the light bulbs prior to requesting maintenance. The Contractor shall keep a monthly log documenting the dates the testing was completed and the results and provide to the KO or designee when requested. The Contractor shall prepare work orders documenting needed repairs to GF and submit to the KO or designee for any repair, maintenance and/or replacement of GF. The Government may or may not elect to facilitate repairs. The Contractor shall provide access to Contractor operated GF during non-duty hours, as needed, to permit the Government to perform facility maintenance and repair. The KO or designee will coordinate required access with the Contractor.

C-4.2 Government Equipment A. The Contractor shall use the conveyor delivery system, which HAFB owns and maintains and shall be utilized for deliveries by DLA Distribution Hill, UT to the AF maintenance activities. The conveyor delivery system is used for transporting small, solid objects where convenience and speed in a local environment is useful. When the conveyor system is down, the Contractor shall use an alternate method of local delivery.

B. The Contractor shall also use the Automated Storage Module (ASM) in Building 849. The ASM is an HK Systems, Inc. mini-load Automated Storage/Retrieval System which is utilized for bin storage. It serves as a material to operator system. The system has 18 operator stations plus associated conveyor.

C. For the conveyor delivery system and ASM the Contractor shall maintain a log of all downtime that impacts completion of contract requirements and provide to the KO or designee upon request. The log shall include date, time, duration and resolution of the downtime.

D. The Contractor shall provide maintenance for the conveyor delivery system and the inserter/extractor robots of the ASM only.

E. The Air Force may deliver maintenance returns on HAFB owned trailers or trays. The Contractor may use these trailers and trays to process the material. Once material is stowed or shipped, the Contractor shall return the trailers and trays to the Air Force.

C-4.4AF Equipment Maintenance A. The Contractor shall perform all electrical work for MHS maintenance including repairs of all existing electrical applications (e.g., roller lines, battery chargers, conveyer, etc.) IAW the National Electrical Code (NEC). The Contractor shall ensure maintenance personnel obtain the appropriate Utah State Journeyman Electrical license to include inspection of electrical work or repair as the authority having jurisdiction to ensure compliance to but not limited to the following:

· NEC 90.4 Enforcement

· NEC 100 Definitions Authority having Jurisdiction (AHJ)

· AF Instruction 32-2001 attachment 15, Electrical Requirements

· Hill AFB Facilities handbook section 11.11.

· AFI 32-2001, Fire Protection Operations and Fire Prevention Program

· OSHA 1926.431, Maintenance of Equipment

· Utah State Rule R614-5-2-H1-7, Material Handling and Storage – Conveyors - Electrical

· NFPA 70 – NEC

· NFPA 70B – Recommended Practice for Electrical Equipment Maintenance

· NFPA 77 – Recommended Practice on Static Electricity

· NFPA 79 – Electrical Standard for Industrial Machinery

C-4.4.4AF Calibration and Certification The Contractor shall perform calibration and certification tests according to the Original Equipment Manufacturer (OEM) specifications and OSHA standards, for equipment that has the function of providing an accurate measurement against a known standard. This includes certification test for all Jib Cranes listed in Attachment J.18, TE 3.4 Government MHE and Equipment Miscellaneous. The Contractor shall maintain records on completed calibration, to include results, and shall make available to the KO or designee for review on request.

C-4.5 Support Services The Contractor shall perform the following for support services identified in Section C-3.4 in Attachment J.1 and Section C-3AF for Government Support Services, and all other support services not provided by the Government necessary to perform the requirements of this contract.

C-4.5.14 Custodial Services The Contractor shall ensure that the areas in and around the facilities the Contractor occupies/works out of are litter free halfway to the adjoining facility; to an appropriate physical barrier such as a fence, sidewalk, street; or 75 feet out from the facility IAW FM Handbook, whichever comes first, IAW Base Civil Engineer Facility Manager’s Handbook OALC-HAFB and AFI 32-2001, Fire Protection Operations and Fire Prevention Program. (Located in Technical Library)

C-4.5.15AF Fuels The Contractor shall coordinate all gasoline, LPG, CNG, and diesel requirements through the KO or designee and shall ensure all employees operate vehicles/equipment in a manner to conserve these fuels. The Contractor shall place empty LPG tanks on the dock of Building 850A for weekly refilling. The Contractor shall contact the KO or designee if LPG tanks need refilling prior to the next scheduled delivery. The Contractor shall be responsible for all costs and/or delays incurred as a result of the failure to place empty LPG tanks on the docks or adequately fuel the vehicles/equipment.

SECTION C-5AF SPECIFIC TASKS

C-5.1.3.3AF Integrated Logistics Supply System (ILS-S)

A. The Contractor shall use ILS-S and maintain user-controlled elements of ILS-S in a manner that protects the integrity of the data IAW AFPD 23-1, United States Air Force (USAF) Materiel Management.

B. Due to the integral nature of ILS-S in DLA Distribution Hill, UT operations, it is expected that periodic unscheduled downtime and slow response time will cause work disruption in performing the requirements of this contract. The Contractor shall take prudent steps to minimize any lost productivity associated with ILS-S downtime. The Contractor shall notify the KO or designee immediately when unscheduled downtime of ILS-S has a negative impact on the Contractor’s ability to perform IAW the requirements of this contract. Unscheduled downtime is approximately one percent per year.

C-5.2AF Receiving

A. When there is a back order requirement and a receipt is inducted in DSS, an Issue From Receiving (IFR) is automatically generated for local delivery to the appropriate customer. This process includes the Contractor preparing the material for issue from the receiving floor and stowing any excess quantity above the IFR requirement. The Contractor shall stow un-issued material IAW paragraph C-5.3.1, Stow of Receipts. DSS-MIS captures the receipt workload in MIS Element 11020, Unstowed Receipts.

B. DLA Aviation procures material that is temporarily out of stock in DSS using a Government Purchase Card (GPC). These purchases are shipped to central receiving for receipt processing. The receipt documentation and the PMR should include a Local Stock Number (LSN). The Contractor shall induct this material using the LSN and IAW paragraph C-5.2.4.4, Product Receipt Evaluation. Once the receipt is inducted, an Issue From Receiving (IFR) is automatically generated for local delivery to the appropriate customer.

C. At times, the Air Force customer may drop off materials/assets outside of DLA Distribution warehouses. The Contractor shall process those assets as a Found On Base IAW paragraph C-5.2.4.2, Non-Procurement Receipts.

D. The Contractor shall pick up material from on-base maintenance/SSC return areas. Maintenance/SSC returns can be delivered to any of the Contractor packaging areas accompanied by documentation, which includes D6 Turn-in stuffer (example provided in TE 6.1, Government Forms), DD Form 1348-1A, and AF Form 2005. If delivered, the Contractor shall offload all conveyances arriving from maintenance. The Contractor shall process (i.e. receipt inducted) all returns from maintenance no later than 1400 hours the next business day with a 90%on-time rate.

C-5.2.5.14AF Non-Accountable Material

A. Non-accountable material includes but is not limited to Government office supply deliveries and personal belongings from military members returning from deployments. It may also include ILS-S Direct Turnover material (See paragraph 5.7.1.5AF, ILS-S Direct Turnovers. The ILS-S Direct Turnover material may not be addressed as below. Non-accountable material is generally addressed as follows:

Mark For:Organization
Attention:Name of recipient, phone extension

Address Building Hill AFB, UT NON-ACCOUNTABLE ONLY, DO NOT POST (or will be marked for Dear John Bay)

B. The Contractor shall establish and maintain a method for auditable tracking of material movement and reporting at all times, such as an excel spreadsheet. Tracking data shall include but is not limited to:

· NSN

· Document number

· Location

· Condition

· Quantity

· Weight

· Date/time received

· Serial number (if applicable)

· Date issued

· Issued to

C. Non-accountable material is located in a secured cage in building 849, where the material is staged. The Contractor shall contact the customer for pickup of non-accountable material. If the customer requests shipment of the non-accountable material, the material shall be shipped IAW paragraph C-5.5.4, Transshipments.

C-5.2.5.15AF Depack/Decanning Support

A. The Contractor shall depack/decan all wheels and brakes received after induction in DSS IAW paragraph C-5.2.4, Product Receipt Evaluation. Depack of all “F” condition assets (excluding wheels and brakes) is done by the Government. The receipt documentation identifies ownership. The Contractor shall provide the labor hours and material costs expended for depacks to the KO or designee IAW CDRL A005, ION Reporting.

B. If the wheel is over assembled (tire on wheel) the Contractor shall induct in DSS using the wheel NSN. The Contractor shall submit an SDR to the owner/IM requesting disassembly of the tire from the wheel. Normally the disposition will result in an MRO to issue the assembly to the appropriate maintenance shop.

C-5.2.5.6 AF Receiving Depot Maintenance Interservice Support Agreement (DMISA) Material

A. DMISA material may be identified by either Receipt documentation, PMR, or the receipt restriction screen.

1. If receipt documentation identifies DMISA material, documentation may include: the RIC of NRP, owner/purpose code 5, pseudo RIC 5NN, and/or project code 3BB. DMISA material documentation may also include the RIC of B14 or B16, owner/purpose code 1, and pseudo RIC 1AA.The Contractor shall process the receipt IAW Section C-5.2, Receiving. If the PRM and receipt documentation do not match, the Contractor shall initiate an SDR and induct the receipt in CC “K.” The Contractor shall complete Disposition Instructions once received IAW paragraph C-5.2.4.1, Supply Discrepancy Reports (SDR).

2. When the Contractor inducts a receipt and the receipt restriction screen states “HILL POSSIBLE DMISA ITEM ‘RIC’; FURTHER RESEARCH REQUIRED,” the Contractor shall conduct further research using the Air Force provided spreadsheet of NSNs. The Contractor shall receive DMISA receipts IAW DLAD 4151.16, Joint Depot Maintenance Program.

B. DMISA material is segregated for storage and shall not inter-mingle the same NSN material with different owner/IM RICs. The Contractor shall verify the lot number field to ensure it includes the correct RIC and the word DMISA.

C-5.2.5.7AF First Articles

A. A First Article is a preproduction model, initial production sample, test sample, first lot, pilot lot, or pilot models. First Articles arrive with a DD Form 250 that is stamped “First Article” and are addressed to the First Article Point of Contact (POC).

B. The Contractor shall transship First Articles IAW paragraph C-5.5.4 Transshipments.

C. Once the lab has completed testing, the material may be returned as a New Procurement and processed IAW paragraph C-5.2.4 Product Receipt Evaluation or as a transshipment request and processed IAW paragraph C-5.5.4, Transshipments.

C-5.2.5.8AF Receiving Product Quality Deficiency Report (PQDR) Material

A. Receipt documentation and PMR include a PQDR exhibit or have PQDR stamped on the 1348 to identify material as PQDR. The Contractor shall process PQDR material IAW paragraph C-5.2.4, Product Receipt Evaluation.

B. The Contractor shall identify the receipt as a condition code “Q” and receipt through DSS assigning the appropriate type storage code for stow and recording control number in the DSS location lot number field as an interim solution until DSS is updated to allow a standalone field expressly for CC Q exhibits. The Contractor shall ensure that all other normal receipt documentation is processed in DSS to include the SF 364 with the PQDR Report Control Number and Discrepancy Report Unique Identifier (DRUI) number.

C. When PQDR documentation does not include the DRUI, the Contractor shall induct in CC “K” and initiate an SDR. Once the Disposition Instructions are received, the Contractor shall change the CC to “Q”.

D. The Contractor shall stow “Q” condition material in segregated locations by DRUI for classified or unclassified material.

SECTION C-5.3 WAREHOUSING

C-5.3.8.1AF Issue of PQDR Material

The Contractor shall manually generate MROs using the DSS On-Line MRO Processing Option (SMOK) screen IAW paragraph C-5.3.8.1, Processing Issue Release Orders, paragraph D. This manual process allows selection of the specified items. The Contractor shall complete a DD Form 1348-1A and complete the pick and issue process. PMI will create the issue document (DD Form 1348-1A) for ILS-S exhibits and forward to the Contractor for exhibit shipment. The Contractor shall fax the DD Form 1348-1A to the specialized storage warehouse.

C-5.3.11.4 Hazardous Material (HAZMAT) Disposals

Contractor shall not dispose of any material sent to Bldg 915 without approval from the 75th. The Contractor shall email the 75th weekly, with a list of products that that have been sent to Bldg 915. The Contractor shall receive disposition instructions from the 75th, ie, Lab tested for the possibility of extending the shelf life, or DRMO disposal. The Contractor shall send a monthly list of assets of shelf-life material about to expire to the 75th LRS for review. This will prevent good material that can be extended from being sent to DRMO

SECTION C-5.5 TRANSPORTATION

C-5.5.5.1AF Load/Off-Load Support

The Contractor shall perform load/off-load support of HAFB-owned equipment, such as vehicles, jet engines, etc. at any Open Storage Lot. The Contractor shall report the labor hours and/or material costs associated with the loads/off-loads performed to the KO or designee using report format in CDRL A005, ION Reporting, only when the support is not a transshipment or a DSS/ILS-S receipt action. The Contractor shall not enter the material the Contractor only provided support to load/off-load in DSS as this material is not entered on the storage activity’s accountable records. In the event the customer requests the Contractor to transport the material from the load/off-load location, the Contractor shall process that transportation support as a transshipment in DSS.

C-5.5.6.6AF Aircraft Engines

A. The Contractor shall perform both off-base issue and traffic management functions for aircraft engines and related equipment IAW TO 00-25-254-1, Comprehensive Engine Management System Engine Configuration, Status and Time Compliance Technical Order Reporting Procedures.

B. For off-base issues, the Contractor shall:

1. Receive a DD Form 1149 from the originating organization’s Engine Manager requesting shipment.

2. Process the aircraft engine in DSS as an off-base transshipment (see C-5.5.4, Transshipments)

3. Schedule transportation and ensure the conveyance is an air ride trailer.

4. Load, block and brace

C-5.5.6.7AF Medical Assembly and Shelter Repair

A. Medical Assembly and Shelter Repair is a function performed by Government employees. This material consists of assemblies such as but not limited to Medical Equipment, International Standards Organization (ISO) Tactical Shelters, Military Vans (MILVANS)/SEAVANS, and other support items assembled on pallets. Medical Assembly and Shelter Repair material is assembled and staged in Building 1160 for shipment by Government employees. The Contractor does not have to physically receive or pick the material. Medical Assembly and Shelter Repair personnel complete a systemic pick action of the end item in DSS.

B. Each end item assembly generally contains a mix of non-hazardous and/or hazardous material. If the end item includes hazardous material, Medical Assembly and Shelter Repair personnel will certify all hazardous Medical Assembly and Shelter Repair shipments IAW Department of Transportation (DOT) and DoD requirements and provide to the Contractor all packing/packaging certification and documents for Medical Assembly and Shelter Repair assemblies containing hazardous material. However, the Contractor shall provide hazardous packing and certification for Medical Assembly and Shelter Repair upon request by the KO or designee. Government employees package non-hazardous material within medical chests, tri-walls and wood containers in the assembly. Configurations may also include fully packed and sealed MILVANS and/or ISO containers. Non-hospital end item assemblies generally consist of fewer than 8 pallets of material, while hospital end item assemblies may be much larger.

C. The Contractor shall perform traffic management support to ship Medical Assembly and Shelter Repair end item assemblies. The Contractor will receive a call forward message containing the shipping requirements for the completed Medical Assembly and Shelter Repair end item assembly. The Contractor shall load transportation exception data into DSS from the call forward message and provide transportation functions IAW paragraph C-5.5.2, Traffic Management, to ship the material at building 1160 to meet the RDD. This message will precede the MRO, which will be generated in DSS when the Medical Assembly and Shelter Repair end item assembly is completed and ready for shipment. The same day the assembly is shipped, the Contractor shall provide the transportation information to the Medical Assembly and Shelter Repair POC. A single call forward message may consist of multiple end item assemblies. The following information is provided in the call forward message to facilitate the Contractor's transportation requirements:

· SHIP TO DODAAC:

· SHIP TO ADDRESS:

· MARK FOR:

· UNIT UIC:

· REQUIRED DELIVERY DATE (RDD):

· PROJECT CODE:

· UNIT POC:

· UNIT POC PHONE NUMBER:

· MODE OF TRANSPORTATION (IF IDENTIFIED):

· PHONE NUMBER:

D. The Contractor shall provide load support, to include blocking and bracing, of Medical Assembly and Shelter Repair material upon request by the KO or designee.

SECTION C-5.6 PACKAGING

C-5.6.1AF Preservation, Packaging, Packing and Marking (PPP&M)

The Contractor shall perform F35 PPP&M workload, however no defined requirements, or workload is available at this time. PPP&M for F35 assets shall be performed using the PPP&M WMS workorder process identified in Attachment J.1, C-5.6 Packaging and may include crate fabrication for F35 DLRs.

C-5.6.2AF Container Reclamation

A. The Contractor shall pick up from the HAFB maintenance activities and tenants on the host installation, all depacked and reusable fast-pack, standard pack, cases, LLRCs and SPI containers. The Contractor shall inspect, offload all reusable containers, and segregate according to the appropriate reclamation areas.

B. Fiberboard container reclamation services are performed under a separate contract with Utah Industry for the Blind (UIB). The Contractor shall pick up fiberboard containers and deliver them to the appropriate reclamation area for all reusable fiberboard containers (Building 850, Bay D). Upon UIB completing the reclamation services for fiberboard containers, the Contractor will be notified and shall pick up reclaim fiberboard containers, enter them into the tracking system for reclamation, and store them in the Contractor’s reclaimed container area (see paragraph C-5.6.2 Container Reclamation).

C. The Contractor shall input all material found during the reclamation process to DSS and/or ILS-S accountable records IAW Section C-5.2, Receiving.

C-5.6.4AF Specialized Container Fabrication Support

The Contractor shall coordinate SPI container delivery date and time with the customer. Contractor shall not store containers after fabrication is completed.

SECTION C-5.7 SITE SPECIFIC FUNCTIONS

C-5.7.1AF Distribution Operations using Integrated Logistics Supply System (ILS-S)

DLA Distribution Hill, UT receives material for storage and distribution transported by a variety of commercial and Government carriers in support of predominately on-base Air Force customers. The Contractor shall use ILS-S to receive, store, inventory and issue material for DoDAACs FB2027/FE2027. The Contractor shall consolidate Evidential Matter daily of the documents supporting receipts; condition code changes; off-base shipments; issues; signature receipt from customers; unit of issue changes and NSN changes. The Air Force ILS-S POC will pick up the documentation from the previous day’s work each morning for imaging of the Evidential Matter.

C-5.7.1.1AF ILS-S Receiving

A. The Contractor shall accomplish ILS-S receipt processing IAW the following:

· Air Force Instruction (AFI) 23-101, Air Force Materiel Management

· MIL-STD 1411, Department of Defense Standard Practice, Inspection and Maintenance of Compressed Gas Cylinders

· MIL-STD 101, Color Code for Pipelines and for Compressed Gas Cylinders

B. The Contractor shall input receipt data into ILS-S by checking, recording and extracting information from receipt documentation. The Contractor shall post receipts of material to the correct records in ILS-S and reverse and re-post a receipt if the receipt is originally posted incorrectly.

C. The Contractor shall clear all ILS-S “rejects” within one working day. For ILS-S receipts, the Contractor shall complete a AFMC Form 183 for each customer refusal, warehouse refusal (ILS-S denial), and receiving input error. The Contractor shall retain a hard copy and submit the original as Evidential Matter IAW DLA Distribution 8180.01, DLA Distribution Evidential Matter Scanning Instructions.

D. The Contractor shall perform KCC on ILS-S material IAW C-5.2.4, Product Receipt Evaluation.

E. ILS-S Direct Turnovers: In the ILS-S warehouse, the Contractor shall receive a direct turnover, which are items delivered to the ILS-S bay that are unable to be processed into the ILS-S system, or a “Mark For.” The Contractor shall transfer this material to the secured cage in building 849 (See paragraph C-5.2.5.14AF, Non-Accountable Material). The Contractor shall prepare and submit to the KO or designee a separate monthly workload report (See CDRL A031; ILS-S Direct Turnover Report) for each receipt of non-accountable material.

C-5.7.1.2AF ILS-S Due Out Releases (DOR)

DORs occur when material arriving has a requisition already loaded in ILS-S for the issue. Once the material is receipted in ILS-S and immediate issue is generated. This permits the item to be prepared and shipped without being stowed. The Contractor shall prepare the material for issue/delivery IAW the RDD. If the issue quantity is less than the receipt quantity, the Contractor shall stow the remaining quantity.

C-5.7.1.3AF ILS-S Shelf-Life Inspections (Cyclic Inspections)

A. The AF Portal lists all ILS-S shelf-life to be inspected and is updated each quarter. The Contractor shall register for CAC access to the Portal at: https://www.my.af.mil/gcss-af/USAF/ep/globa1Tab.do?channe1Pageld=s6925EC134A3DOFB5E044080020E329A9&command=org.

B. Once registered in the AF Portal, the Contractor shall go to the “Post-Post Reports” link under “ILS-S Reports” and pull the “NGV401 Shelf-Life List” within the first seven (7) days of each new quarter. The Contractor shall complete shelf-life inspections by the end of each quarter The Contractor shall dispose of expired items and redistribute/dispose of excess items IAW AFMAN 23-110, USAF Supply Manual, Volume 7, Part 3, and inspect ILS-S material IAW DoD 4140.27-M, Shelf-Life Management Manual, Chapter 2, as follows:

1. TYPE I (non-extendable) Shelf-Life Items shall not be tested, inspected, or extended in storage but shall be disposed of upon their expiration dates.

2. TYPE II (extendable) Shelf-Life Items

· Determine whether a firm or future stock level requirement still exists for the item.

· Use AFMAN 23-110, USAF Supply Manual, Volume 1, Part 1, Chapter 3, and the test procedures established at the Depot to test and maintain both wholesale and retail items in CC A unless the cost to test will exceed the total value of the material to be tested.

· Test 15 to 45 calendar days prior to expiration or sufficiently far enough in advance that the test results will be available prior to the expiration date of the item; items may have their shelf-life extended beyond the assigned storage period after successfully completing inspection, testing, or restorative action (see AFMAN 23-110, USAF Supply Manual, Volume 7, Part 3, Chapter 1, paragraph 1.10, ILS-S Policies, for more information on steps to be taken as a result of the inspection or test results).

· Request testing through stock control of an item.

· Annotate extension information on AF Form 2032.

· Update the Hazardous Material Management System (HMMS) with Shelf-Life extension information.

B. The Contractor shall rotate stock upon receipt of like NSNs. If an item with an expired shelf- life date is found, the Contractor shall immediately accomplish a complete review of all inventories on hand for that NSN.

C-5.7.1.4AF Local Delivery Issues From ILS-S

A. ILS-S issues include, but are not limited to, support for the tenant organizations located on or around the host installation, with current distances being up to four miles. In some cases the customer chooses to pick up the material from the ILS-S warehouse location. The Contractor will be notified by the customer if they prefer to pick-up the material and the Contractor shall stage the material for pick-up. The Contractor shall coordinate required signatures for ILS-S deliveries. If personnel are not available to sign for ILS-S deliveries, the Contractor shall leave a date and time-stamped notice at the delivery point. This notice shall identify the material (NSN, material description, KCC), the requesting organization (and POC, if known), the date, time, and location of the unsuccessful attempt to deliver the material, and information regarding how the material can be picked up by the requisitioner (e.g., telephone number, Contractor POC, operating hours). The Contractor shall make Local Delivery documents available for delivery or pick up by the AF for their internal tracking requirements.

B. The Contractor shall process ILS-S materials as follows:

1. For ILS-S requisitions, the Contractor shall ship 85% of the material in one day or less from the time of the receipt of the requisition to the time of material shipment. The Contractor shall ship 100% of the material within 2 days or less from the time of the receipt of the requisition to the time of material shipment. A random sampling of ILS-S requisitions in a given calendar month compared against the shipping documentation will be used to verify this requirement is being met.

2. For ILS-S MICAPs, the Contractor shall deliver the MICAP material as soon as possible but NLT one hour. If the Contractor cannot deliver MICAP material within one hour, the Contractor shall document the circumstances preventing the timely delivery and provide to the KO or designee as it happens.

3. For ILS-S MROs (DPC 1 and 2) the Contractor shall deliver 85% of the material in one hour or less from the time of the receipt of the MRO to the time the material is delivered. The Contractor shall deliver 100% of the material within 4 hours or less from the time of the receipt of the MRO to the time the material is delivered. A random sampling of ILS-S requisitions in a given calendar month compared against the local delivery documentation will be used to verify this requirement is being met.

4. For ILS-S MROs (DPC 3 and 4) the Contractor shall deliver 85% of the material in 4 hours or less from the time of the receipt of the MRO to the time the material is delivered. The Contractor shall deliver 100% of the material within 8 hours or less from the time of the receipt of the MRO to the time the material is delivered. A random sampling of ILS-S requisitions in a given calendar month compared against the local delivery documentation will be used to verify this requirement is being met.

5. For ILS-S MROs (DPC 5 and 6) the Contractor shall deliver 85% of the material in 24 hours or less from the time of the receipt of the MRO to the time the material is delivered. The Contractor shall deliver 100% of the material within 36 hours or less from the time of the receipt of the MRO to the time the material is delivered. A random sampling of ILS-S requisitions in a given calendar month compared against the local delivery documentation will be used to verify this requirement is being met.

C. Local Delivery Priority Codes for ILS-S are found in columns 60-61 of the DD Form 1348-1A.

C-5.7.1.5AF ILS-S Inventories

A. The Contractor shall complete an annual wall-to-wall inventory on all stocked balances. The Contractor shall complete a yearly inventory schedule IAW CDRL A032, ILS-S Inventory Schedule. Contractor’s inventory schedule will be performed from start of each Fiscal Year to the end of each Fiscal Year.

B. The Contractor shall send an inventory request to the Base Support Section at Phoenix Management, Inc. (PMI) the day before the inventory is scheduled to be performed. The Contractor shall freeze the specified location(s) at Close of Business (COB) the day the request is received and complete within two (2) working days of request receipt.

C. The Contractor shall perform the 1st physical inventory, which includes verifying the NSNs, on-hand quantity, unit of issue, and CC and entering the results into ILS-S. Once the 1st count is entered into ILS-S for all inventories, ILS-S systemically performs Post-Count Validations as follows:

1. For Uncontrolled Items:

· If the 1st physical count matches the ILS-S accountable record, the inventory is closed in ILS-S.

· If the 1st physical count does not match the ILS-S accountable record, but the adjustment is less than the designated auto adjust level in value, the inventory is closed in ILS-S.

· If the 1st physical count does not match the ILS-S accountable record and the adjustment would be greater than the designated auto adjust level in value, ILS-S generates a 2nd count requirement.

2. For Controlled Items:

· If the 1st physical count does not match ILS-S accountable records, ILS-S will generate a 2nd physical count requirement.

· Perform 2nd physical count requirements generated by ILS-S. A different

· Contractor individual shall perform the 2nd physical count.

D. Once the count is entered into ILS-S, ILS-S systemically performs a Post-Count Validation and generates an Inventory Evaluation Research List (IERL) for all of the following:

1. For Uncontrolled Items:

· If the 2nd physical count does not match the ILS-S accountable record, but the adjustment is less than $1,000 in value, the inventory is closed.

· If the 2nd physical count does not match the ILS-S accountable record, but the adjustment is more than $1,000 in value, an additional research discrepancy is produced.

2. For Controlled Items:

If the 2nd physical count does not match the ILS-S accountable record, further research will be conducted as follows:

· Sensitive items (for example, drugs or precious metals) when any discrepancy occurs, regardless of the dollar value.

· Classified items, regardless of the dollar value.

· Hand tools or other pilferable items with a unit cost over $100 or a total cost over $500.

· Unclassified items assigned Control Item Inventory Code (CIIC) 7.

· Any discrepancy that suggests fraud, theft, or negligence.

· Arms ammunition mandatory for all personal arms, whether or not the person responsible for the weapons is willing to pay for it.

· Repetitive losses when the dollar value of the adjustment equals or exceeds the projected costs of the investigation report.

· Discrepancies for any item worth more than $50,000.

· Research requested by the KO or designee.

E. The Contractor shall perform special inventories including, but not limited to, insufficient balances, warehouse refusals, and other requirements.

C-5.7.2AF Support to Shop Service Center (SSC) Operations (Delivery Response Time (DRT))

A. The SSC is operated by DLA Aviation. The material is considered retail support. The inventory in the SSC is on the same WMS record as the wholesale material. The Contractor is only responsible for performing the stock material replenishments, returns and MRO issues as portrayed below. The inventory accuracy is measured taking all transactions with a Document ID of D8A/D9A (Gain or Loss) and adjustment quantity greater than or equal to zero. Inventory Accuracy within wholesale and retail are currently measured as one since they have the same site IDs within DSS. Inventory Accuracy measures only items within the DSS system.

B. The Contractor shall perform SSC stock material replenishment by either:

1. Rewarehousing picks from wholesale inventory that are manifested and delivered to SSC storage locations

2. Processing as a Direct Turn Over (DTO) if from other sources that are manifested and delivered to the SSC drop points.

C. The Contractor shall issue material to the SSC IAW DLA Distribution SOP 4540.026, Local Delivery Process for Air Logistics Centers (ALC). The Contractor shall use the local delivery priority code as the basis for determining the Delivery Response Time (DRT) and to meet the DRT APL IAW TE 5.0, APLs.

D. The Contractor shall process SSC stock returns as rewarehousing stows.

E. The workload associated with the Contractor’s support to the operations is identified in TE 5.2, Projected Workload. The SSC Replenishment Rate is defined in DLAM 4140.08-V1 DLA Retail Supply Chain Materiel Management Procedures: Air Force (AF) Supply, Storage and Distribution (see Technical Library).

C-5.7.3AF Support for the F-35 Platform Support The F-35 (Lightning II) Joint Program Office (JPO) selected Defense Logistics Agency (DLA) to be the North American Warehousing Product Support Provider (PSP). To support this effort, DLA Distribution will be required to receive, store and issue repair parts and consumables in support of the F-35 program. The Contractor shall execute the receipt, store, and issue material in sustainment support of F-35 Repair and Maintenance material. The Contractor shall process F-35 material in the Original Equipment Manufacturer’s (OEM) Information Technology (IT) logistics systems. The Contractor shall submit a monthly report NLT the 5th workday of each month for the previous month’s F-35 workload to the KO and designee IAW (See CDRL A033).

C-5.7.3.1 Receiving Functions The Contractor shall:

1. Perform visual and physical examination, identification and receipt of a wide variety of serviceable and unserviceable F-35 material and parts.

2. Process IAW, Section C-5.2.5.8 for any Radioactive Material received.

3. Prepare a discrepancy report in the OEM SAP IAW trained processes and procedures.

4. Reconcile receipts against accompanying documentation and shall accomplish a Kind, Count, and Condition (KCC) visual inspection and verify that the packaging, marking, and unit pack are appropriate to the level of packaging as specified in the contract or in the OEM SAP IAW trained processes and procedures.

5. Process the inbound receipt of material within one (1) business day, 100% of the time. Any material that DLA, in its sole discretion, deems to have a discrepancy will be excluded from this requirement and not factored into the calculation of the RPT.

C-5.7.3.2 Stow Functions The Contractor shall:

1. Complete the receipt process by stowing the material in the OEM SAP IAW trained processes and procedures.

2. Process IAW Section C-5.3.4.4 for any storage of Radioactive Material.

C-5.7.3.3 Warehousing Functions The Contractor shall;

1. Maintain warehouse locations for the F-35 material IAW, Section C-5.3.2, General Warehousing/Storage Requirements.

2. Include the warehouse space used to store the F-35 material in the Storage Space Management Reporting requirement.

C-5.7.3.4 Inventory The Contractor shall maintain the accountable record for all material in storage in support of customer requirements and readiness. The Contractor shall monitor physical inventories, location surveys, and perform research and reconciliations to correct accountable record imbalances and prevent potential denials. The Contractor shall also identify repetitive processing errors and help resolve problems in supply system work processes. The Contractor shall perform:

1. 100% physical inventory annually on each F-35 Part Number (P/N) in storage using best inventory practices such as but not limited to:

a) Remove all material and lay out so all labels are facing up to validate all material is the correct P/N is being counted;

b) For larger quantity counts, conduct counts using a batch process, e.g. quantities of 10s, 20s, etc.

2. Corrective Actions or inventory counts for any Government performed Floor to book (F2B) counts resulting from count mismatches.

3. Conduct all causative research requirements and perform physical inventory adjustments following the OEM SAP processes and procedures.

4. Perform denial research on all potential denials.

5. Maintain a 98% Inventory Accuracy Rate for the F-35 P/N in storage. Inventory Accuracy is defined as having the physical inventory (part number, serial number, quantity, condition, and storage location) match the information in the WMS.

C-5.7.3.5 Issue Functions The Contractor shall issue material for all on and off base transactions. The Contractor shall coordinate workload, expedite high priority issues, schedule deliveries and issue the correct material in the correct quantity and CC so the material and supplies ordered are received by the customer where and when they are needed. The Contractor shall perform:

1. Stock selection by selecting the correct P/N, quantity, CC and unit of issue as specified on the issue document.

2. Shipment preparation functions for off-base shipments. Off-base shipments will be processed IAW Section C-5.3.9, Trans-shipments.

3. Local Delivery preparation functions IAW Section C-5.3.10, Local Delivery. The Contractor will support the Ogden Air Logistics Centers (ALC) with local delivery of F-35 material. The frequency of delivery will be influenced by ALC operations and program needs.

4. The Issue Response Time (IRT), which is based on the time from receipt of a requisition by DLA until the requisition is filled and offered to the carrier for shipment. The IRT only applies to material physically at the DLA warehouse. The Contractor shall fill requisitions for F-35 material IAW the following:

Issue Response Time (IRT)

Priority
Percent of Requisitions Filled
Days to Fill
IRT Group
95%
1
Group 1
100%
2
Group 2
2
100%
2
Group 3

C-5.7.4 AF F-35 Traffic Management Functions

A. The F-35 (Lightning II) Joint Program Office (JPO) selected Defense Logistics Agency (DLA) to be the Global Transportation Product Support Provider (PSP). To support this effort, DLA Distribution will be required to provide Traffic Management Functions in support of the F-35 program. Projected F-35 Transportation workload located in TE 5.2 The Government will provide training to the Contractor on VSM processes and procedures. The Contractor shall submit a monthly report NLT the 5th workday of each month for the previous month’s F-35 workload to the KO and designee IAW (See CDRL A033).

B. All F-35 Traffic Management Functions work will be performed in a defined, dedicated, office space provided by the Government. Traffic Management Functions shall be performed at DDHU for a cohesive working group. The Contractor shall provide Traffic Management Functions as a hub for global shipping of F-35 material in support of requirements for Material Availability (MA), US forces, partner nations, foreign military sales, and other program considerations.

C. The Contractor shall perform traffic management functions to support shipments of F-35 material for the Prime Vendors Lockheed Martin and Pratt & Whitney. Prime Vendor material will be shipped from their storage facilities in Ft. Worth, TX, or Oklahoma City, OK respectively, any other location that the Prime Vendors store F-35 material, or from F35 units retrograding material back to maintenance activities. The Contractor shall book these shipments using VSM, IAW the DLA Distribution Vendor Shipment Module (VSM) Vendor User’s Guide. The Contractor shall provide all VSM booking for Prime Vendor shipments. It is anticipated most shipments shall be processed during the business hours of Monday – Friday 0600-1730, and Saturday 0600-1430. Contractor shall maintain a capability to process emergency shipments 24 hours a day, seven (7) days a week. UPS and DHL pick up scheduling shall be provided to assist Lockheed’s Ft. Worth location. The Contractor shall provide monthly reports IAW CDRL A0034.

D. VSM booking process: (Standard Shipments): The Contractor will receive a DD Form 1149 via email from the Prime Vendor with all required information for the Contractor to perform required traffic management functions. The Contractor shall enter the DD 1149 information into a Manual Purchase Order (MPO) in VSM. Once the MPO is entered, VSM will select a carrier that will pick-up materiel at the Prime Vendor storage facility. VSM will generate the appropriate shipping documents for the type of shipment (may include MSL, CBL, Manifests and/or other documents). The Contractor shall email those shipping documents to the Prime Vendor, who will use them to ship the materiel. For non-emergency shipments, the Contractor has 24 business hours from the time the DD1149 email arrives from the prime vendor to complete VSM booking and email the shipping documents to Prime Vendor. The Contractor shall provide quality control functions on Prime Vendors entering their shipments into VSM via the MPO process. The Contractor shall ensure the correct TAC and project codes were used. The Contractor shall provide the Prime Vendors with any assistance required, which can include customs clearance, pushing a 219, reviewing the CBL, clearing any shipments that exceptioned out, etc.

E. UPS and DHL pick up scheduling: If VSM selects UPS or DHL to pick-up materiel from the Prime Vendor Lockheed Martin, Ft. Worth facility, the Contractor shall call the Prime Vendor’s local UPS or DHL facility, and schedule shipment pick-up at the time specified by the Prime Vendor. The Prime Vendor will provide the desired pick-up times to the Contractor.

F. Vendor Shipment Module (VSM) Support (Heavy Weight Shipments): Additional requirements for heavy weight shipments: The Contractor shall be required to acquire quotes from at least three (3) carriers participating in the GHS contract and shall award to the best value carrier. The Contractor shall process the shipment in VSM as a truck shipment. The Contractor shall process a CBL with the price set by the best value carrier.

G. Vendor Shipment Module (VSM) Support (Emergency Shipments): For emergency shipments, the Contractor shall receive notification from the Prime Vendors by a dedicated phone number and via-e-mail. The Contractor shall process emergency shipments in VSM as soon as the Prime Vendor notifies them via e-mail and phone. The Contractor shall process them until completed, to include emailing the Prime Vendor the shipping documents.