SF330 - 36C77622R0007.pdf

Standard Form PDF 204 KB Posted

Attached to
C1DA--595-22-700 EHRM Infrastructure Upgrades Design Lebanon, PA VAMC
Solicitation number
36C77622R0007
Issued by

About this file

This pre-solicitation notice requests Standard Form 330 qualification packages from architecture and engineering firms for design services. Firms must submit their SF330 responses by December 23, 2021 for consideration. The selected firm will provide investigative and feasibility design, schematic design, design development, construction documents, specifications, cost estimates, and other deliverables for infrastructure upgrades to support a new electronic health record system at the Lebanon, Pennsylvania VA Medical Center. The project is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The design period of performance is 365 calendar days from notice to award. Construction period services will be optional line items exercised after construction award. The value for design is estimated between $20-50 million. Selection will follow a two-phase evaluation of SF330 qualifications and written responses from shortlisted firms.

View the file

Other versions and copies of SF 330

File Revision Posted Attached to
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
1-Standard Form 330 Part II.pdf.pdf Revision not stated Waters Avenue Force Main Replacement CEI Services
Standard_Form_330-21b_-_Architect-Engineering_Qualifications.pdf Revision not stated Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
SF330-21b.pdf Revision not stated PARAMARIBO: A&E Services, MSGR
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf Revision not stated Request for Lease Proposals (RLP) for Olympia, WA CBOC
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Subsurface Investigation & Testing
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Construction Engineering and Inspection (CEI) Services - CDBG-DR
1-Standard Form 330 Part II.pdf.pdf Revision not stated Misc. Professional Stormwater Services
SF-330 AE Qualifications.pdf Revision not stated IDIQ For Architect Engineer (A/E) Services for Central Office
Appendix-4-AE-Qualifications-SF-330-Forms.pdf Revision not stated Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A
HR001126RE008 Public Announcement Attachment 2 - SF 330.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF 330 Instructions.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF330 21AE FILLABLE.pdf Revision not stated DOC Architect and Engineering IDIQ
Attachment 1b - ArchitectEngineerQualifications (SF330-FAA 4400-37).docx Revision not stated Architecture and Engineering Services - MMAC
EXHIBIT M_SF330 - Architect-Engineer Qualifications.pdf Revision not stated Request for Lease Proposal (RLP): Las Vegas, NV Medical Facility
Attachment 5 - Standard Form 330 (SF330) - Architect-Engineer Qualifications.pdf Revision not stated FY 27 A-E IDIQ Solicitation
SF330-21a.pdf Revision not stated Architect & Engineering Services CFAC FY26 QA1
SF330-21a.pdf Revision not stated CC-623-250-001 BCCC Nursing Building Renovation and Addition
12-EXHIBIT L SF 330 Architect Engineer Qualifications.pdf Revision not stated Oklahoma City OK Fiscal Building Superseding Lease
Show all 20

Who attaches SF 330

State Files
Florida 97
Maryland 41
Pennsylvania 23
Washington 21
Texas 19

Other files

File Type Posted
36C77622R0007_2.docx DOCX document
PPQ - Lebanon EHRM Infrastructure.docx DOCX document
SOW - Lebanon EHRM Infrastructure Upgrades Design - Final 11-4-21.pdf PDF
36C77622R0007.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Presolicitation Notice

*=Required Field Presolicitation Notice

SUBJECT* 595-22-700 EHRM Infrastructure Upgrades Design Lebanon, PA VAMC

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE* 44131

SOLICITATION NUMBER* 36C77622R0007

RESPONSE DATE/TIME/ZONE 12-23-2021 2PM EASTERN TIME, NEW YORK,

USA

ARCHIVE 99 DAYS AFTER THE RESPONSE DATE

SET-ASIDE SDVOSBC

PRODUCT SERVICE CODE* C1DA

NAICS CODE* 541330

PLACE OF PERFORMANCE Lebanon VAMC

1700 S Lincoln Ave

Lebanon PA

POSTAL CODE 17042-7529

COUNTRY USA

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS Department of Veterans Affairs

Program Contracting Activity Central

6150 Oak Tree Blvd, Suite 300

Independence OH 44131

POINT OF CONTACT*

Contract Specialist

Jason Phillip

ADDITIONAL INFORMATION

AGENCY’S URL http://www.va.gov/

URL DESCRIPTION Department of Veterans Affairs Homepage

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

THIS IS NOT A REQUEST FOR PROPOSAL. THIS IS A REQUEST FOR STANDARD

FORM (SF)330'S, ARCHITECT-ENGINEER QUALIFICATION PACKAGES ONLY. ALL

INFORMATION NEEDED TO SUBMIT SF330 DOCUMENTS IS CONTAINED HEREIN.

NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN

HOLDER LIST WILL BE ISSUED. THE GOVERNMENT WILL NOT PAY, NOR

REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST.

THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A

RESULT OF THIS ANNOUNCEMENT.

The only attachments being provided at this time are the SOW and the PPQ.

1. GENERAL INFORMATION:

The Veterans Health Administration (VHA) Program Contracting Activity Central (PCAC) is seeking sources and intends to award a firm-fixed price design contract for Architect- Engineering (A-E) services for Project #595-22-700 EHRM Infrastructure Upgrades Design at the Lebanon VA Medical Center 1700 S Lincoln Ave., Lebanon, PA. 17042.

The A-E shall provide investigative and feasibility design services, schematic design drawings, design development drawings, construction documents, final bid documents, specifications, calculations, cost estimates, narratives, bidding support services, solicitation support services, and construction period services for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facilities infrastructure to allow for the new Electronic Health Record Modernization (EHRM) system.

The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers Statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation Part 36.6 “Architectural and Engineering Services,” VA Acquisition Regulation 836.6, and VA Acquisition Manual M836.6 Architect-Engineer Services. In accordance with FAR 36.209, “Construction Contracts with Architect-Engineer Firms,” no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative.

2. PROJECT INFORMATION

This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The NAICS Code for this procurement is 541330 “Engineering Services” and the annual small business size standard is $16.5M. A full design team is required to complete this project. The projected award date for the anticipated A-E contract is on or before April 18, 2022.

The anticipated period of performance for completion of design is 365 calendar days after notice of award. The FAR 52.236-22 Design Within Funding Limitation (APR 1984), for this project is $20M-$50M in accordance with the VAAR Magnitude of Construction.

3. SCOPE OF DESIGN

The scope of this project is to provide the following infrastructure improvements to the Lebanon VA Medical Center:

A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies, and user interviews to prepare drawings, specifications, and cost estimates for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable). Upgrade existing data center (electrical distribution, UPS, cable management, cabinet realignment, demo, raised flooring, finishes, HVAC distribution), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for WAN, hazardous material abatement. The AE shall hire a 3rd party commissioning agent to provide commissioning as required by the Whole Building Commissioning Process Manual including, but not limited to the following: “Grounding and bonding, structured cabling systems, Public Address & Mass Notification Systems, intercom & Program Systems, Security Emergency Call Systems, Duress Alarm Systems, Physical Access Control Systems, Access Control Systems, Security Access Detection Systems, Video Surveillance System require, Electronic Personal Protection System, and Fire Detection and Alarm Systems require 3rd party commissioning.” Project buildings include: 1, 2, 4, 5, 6, 7, 8, 9, 10, 17, 18, 19, 22, 23, 24, 34, 35, 36, 37, 99, 101, 102, 104, 106, 144, and site.

A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. Additionally, the AE shall include third party commissioning services as required by the Whole Building Commissioning Process Manual including, but not limited to the following: “Grounding and bonding, structured cabling systems, Public Address & Mass Notification Systems, intercom & Program Systems, Security Emergency Call Systems, Duress Alarm Systems, Physical Access Control Systems, Access Control Systems, Security Access Detection Systems, Video Surveillance System require, Electronic Personal Protection System, and Fire Detection and Alarm Systems.” . The AE shall develop a commissioning plan and provide as part of the construction solicitation. All Part Two Services are optional line items and will not be exercised at the time of award.

The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of Lebanon VA Medical Center record drawings and the EHRM infrastructure readiness assessment documents will be made available to the highest rated A/E firm; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design.

The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project.

The A-E shall be professionally licensed in any state in the United States. The A-E is responsible for all services to complete the deliverables listed in the Statement of Work (SOW) (See SOW - Lebanon EHRM Infrastructure - Final 11-4-21). The deliverables outlined in the SOW are inclusive of the following: Quality Assurance/Quality Control Plan, Basis of Design (10%), Schematic Design (35%), Design Development (65%), Construction Documents (95%), Final Bid Documents (100%), Solicitation Support Services, Commissioning Services, and Construction Period Services.

Please note that the 365-calendar-day period of performance for the design completion begins with the issuance of the Notice of Award (NOA) and that a Notice to Proceed (NTP) will not be issued for the completion of a design project. The construction period services will be option items that will be exercised after the award of the construction project. The period of performance for construction period services will match the period of performance for the construction project.

4. A-E SELECTION PROCESS:

Firms submitting SF330s in response to this announcement, not later than the closing date and time specified herein and in accordance with submission requirements, will be considered for initial selection evaluation. The selection process will be made using a two-phase process. Phase I consists of the initial evaluation of the provided SF330s and determination of the highest rated firms. A minimum of three of the highest rated firms will then be short listed and invited to continue with Phase II of the process. All firms not short listed will be notified at this time. Phase II consists of written responses for the short-listed firms and selection of the top ranked firm to receive the solicitation and conduct negotiations. The firms selected for the written responses will be notified by email of selection and provided further instructions as well as all the evaluation criteria requirements. After the written responses are received, the firms will be evaluated and the highest rated firm will be selected and sent the solicitation, and negotiations will follow.

A site visit will be authorized for the highest rated firm during the negotiation process.

Award selection will be made based on the results of the written responses and successful negotiation of rates and fees for the project, and not the SF330 qualifications from Phase I. If negotiations are not successful with the highest rated firm, they will continue with the next highest rated firm, and so on until award can be made.

Please note that during the evaluation of the written responses, the prior evaluation of the SF330s will not be taken into consideration as they shall be considered separate evaluations.

5. PHASE I SF330 SELECTION CRITERIA:

PLEASE NOTE THAT THE ORDER AND CONTENTS OF THE FACTORS HAVE

BEEN CHANGED FROM PREVIOUS REQUESTS FOR SF330s.

The following are listed in descending order of importance:

Primary Selection Criteria:

1. Specialized Experience: Specialized experience and technical competence in the design and construction period services provided for projects similar in size, scope, and complexity. Any projects provided in Section F should include EHRM projects or projects involving the following relevant elements: fiber optics; data cable; structured cabling; electrical distribution design; electrical upgrades;

uninterruptable power systems (UPS); electrical bonding; building management systems/building automation systems (BMS/BAS); IT room renovations, expansions, or relocations; reconfiguration of Data Centers or Server Rooms; or physical security upgrades. For each project, include the design start and end dates, construction start and end dates if applicable, the design amount, estimated or final construction amount, and specialized scope items to include critical path scheduling, fire protection, construction infection control protocols, energy conservation, sustainable design practices, and specialized building types requiring physical security measures. Also identify if any of the projects include Infrastructure upgrades, work in active hospitals, phasing, and/or new construction tying into existing facilities

Include no more than six Government and/or private experience projects. Any projects submitted that exceed the limit will not be considered during the evaluation. The evaluation will consider the management approach, coordination of disciplines and subcontractors, quality control procedures, prior experience of the prime firm and any key subcontractors working together on relevant projects, and familiarity with VA Design Guides/Manuals, Master Specifications, and other applicable standards. All projects provided in the SF330 must be completed by a firm, office, branch, or individual team member proposed to perform work under this contract.

The information provided in sections F and G of the SF330 will be used to evaluate this factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections.

2. Professional Qualifications: Professional qualifications necessary for satisfactory performance of required service. The design firm and A-E on staff representing the project or signing drawings in each discipline must be licensed to practice in any one of the United States of America. Provide Professional License numbers and/or proof of Licensure. The evaluation of resumes shall consider the specific experience and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full-time employees) of personnel proposed for assignment to the project. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located. In the Organizational Chart in Section D, identify the personnel proposed for all key positions and disciplines listed below. A resume is required for each of these team members. Resumes are limited to one page each and should cite project-specific experience and indicate proposed role in this contract.

Key positions and disciplines required for this project include, but are not limited to: Project Manager, Registered Communications Distribution Designer (RCDD), Electrical Engineer, Architect, Cost Estimator, Civil Engineer, Fire Protection Engineer, Industrial Hygienist, Mechanical Engineer, Quality Assurance, Structural Engineer, Commissioning Agent and Physical Security Specialist.

Offeror must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: “I [signatory authority], of [company name] certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10.”

The information provided in sections C through E of the SF330 will be used to evaluate this factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections.

3. Past Performance: Past performance on contracts with Government agencies and/or private industry in terms of cost control, quality of work, and compliance with performance schedules. The past performance will be evaluated for all projects provided in section F, to include a review of Contractor Performance Assessment Reporting System (CPARS) ratings. Provide performance reports for all projects submitted in section F and include the following information for each project: contract/task order number, project title, prime firm, start date, and completion date. Evaluations may also include additional performance-related information from the firm, customer inquiries, Government databases, publicly available sources, additional projects in CPARS, and other information available to the Government, including communications with points of contact in other criteria.

Evaluations will consider superior performance ratings on recently completed VA projects as well as the reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Also, consider, as appropriate, the record of significant claims against the firm because of improper or incomplete architectural and engineering services. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF330 must be completed by a firm, office, branch, or individual team member proposed to perform work under this contract.

The information for this factor shall be provided in Section H of the SF330. If there is no CPARS data available, Past Performance Questionnaires (PPQs) will be accepted. Please utilize the attached PPQ document. *PPQs should not be submitted by the evaluator to VHA PCAC directly. Completed PPQs must be incorporated into the SF330 submission. PPQs will be counted towards the page limitation for this submission.

4. Construction Period Services: Describe your team's approach to providing construction period services, to include professional field inspections during the construction period; review of construction submittals; support in answering requests for information (RFIs) during the construction period; support of construction contract changes to include drafting statements of work and cost estimates; attendance at weekly conference calls; providing minutes of meetings between the A-E, VA, and contractors; pre-final inspection site visits; generation of punch-list reports; and production of as-built documentation. List project examples to demonstrate the prime firm or any subcontractors' experience with construction period services.

The information for this factor shall be provided in Section H of the SF330.

5. Capacity: Capacity to accomplish work in the required time. The evaluation will consider the team's overall ability to meet the schedule of the project, as well as the available capacity of key disciplines to perform the work in the required time.

Please provide a table to demonstrate the available capacity of each of the Key Personnel identified in Sections D and E for the prime firm and all subcontractors.

At a minimum ensure that the table includes the following for each key team member: name, firm, role in project and percentage of available capacity to take on new work. Provide all projects awarded by the VA to the prime firm and all subcontractors during the previous 12 months (from the date of the SF330 submission). At a minimum, include the following for each project: project name, location, award date, completion percentage, and expected completion date, project name, location, award date, completion percentage, and expected completion date. Provide the full potential value of any current indefinite delivery contracts. The number of EHRM projects the prime firm and all subcontractors are currently working, and their completion percentages will be taken into consideration.

The information for this factor shall be provided in Section H of the SF330. Please ensure the capacity applies toward the team/personnel provided in the SF330.

6. Locality: Knowledge of the locality. May include the following, demonstrate and describe specific knowledge of certain local conditions or project site features, such as geological features, climatic conditions, local construction methods, or local laws and regulations.

• Soil conditions related to trenching or digging required

• Any prime firm or subcontractor experience at the VAMC and/or within the VISN, this should include the experience of both the prime and sub

• Knowledge of specific state or local codes, laws, or regulations

• Approach to addressing unique climate conditions

• Geological conditions such as seismic (if applicable)

The information for this factor shall be provided in Section H of the SF330. Note that the intent of this factor is to showcase a firm’s understanding of the site and locality, and not where the firm is located and how they would travel to the site.

Information related to the firm’s location shall be provided in section H, under Secondary Selection Criteria Factor 1 - Geographic Location.

Secondary Selection Criteria*:

Geographic Location: Location of the firm, as measured by the driving distance (miles) between the Offeror’s principal business location and the Lebanon VA Medical Center 1700 S Lincoln Ave., Lebanon, PA. 17042.

Determination of the mileage will be based on Google Maps (www.google.com/maps/dir/).

* The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of the SF330 evaluations. The secondary selection criterion will not be applied when determining a firm’s SF330 submission “Excellent,” “Good,” “Acceptable,” “Marginal,” or “Unacceptable.”

The information for this factor shall be provided in Section H of the SF330

6. PHASE II INTERVIEW PRESENTATIONS SELECTION CRITERIA:

In accordance with FAR 36.602-3(c), discussions will be conducted in the form of written responses. The selected firms will be invited to present their written responses to predetermined questions via email to the A-E Technical Evaluation Board. The instructions for the written responses will be provided to the selected firms only. Each selected firm will be evaluated based on their responses to the evaluation criteria. The highest-ranked firm will be selected based on their ratings from the written responses.

The previous ratings from the SF330 evaluations are not applicable during Phase II.

Below are the evaluation factors for the written responses and are of equal importance.

1. Proposed Management and Coordination Plan: Discuss confidence and approach to completing a project of this scale with an expedited period of performance. Explain quality control methods that will be used throughout each design phase and prior to each submission. Address construction period services quality control methods and plan used throughout the construction phase.

Describe strategy for control of estimated cost and solutions for anticipated problems that impact cost. Discuss proposed design team and their specific strengths and experience that make them the best fit for this project.

2. Approach to Project Challenges: Discuss approach to overcome geographical obstacles considering the amount of site visits needed for this specific project (address both design phase site visits as well as CPS visits). Review the SOW and supporting attachments and provide what you see as challenges and recommendations for addressing each of these challenges. Simply restating the requirements (copying and pasting from the SOW) is not considered to be a sufficient response for this factor. Information about this project’s challenges http://www.google.com/maps/dir/ should provide specific examples and a plan on how each challenge will be dealt with.

3. Proposed Approach to Design Development: Discuss plan to ensure specifications and drawings are well edited and complete, accurate, all inclusive, and in coordination with each other. Describe plans with this project to ensure VA requirements are kept current, and specified equipment will be TRM approved.

Discuss ability, familiarization, or experience with VA design guides and directives and their interpretations and application to this design. Discuss approach to evaluate existing site conditions and ensure new work will not conflict with existing work.

4. Expectations for VA – A-E Collaboration: Discuss what expectations the A-E firm would have from the VA for this project. Describe strategy for collaboration meetings throughout each phase and their significance to the overall end-product.

7. SUBMISSION CRITERIA/REQUIREMENTS:

The below information contains the instructions and format that shall be followed for the submission of the SF330 Statement of Qualifications:

• Submit ONE (1) SF330 Statement of Qualifications to Jason Phillip at jason.phillip@va.gov. This shall include Parts I and II and any applicable attachments.

• The SF330 submission is due by 2:00 PM ET ON December 23, 2021.

• The SF330 shall be submitted in one email and have a file size no larger than 5 MB. No hard copies will be accepted.

• The subject line of the email shall read: “SF330 Lebanon EHRM Infrastructure R0007”

• The submission must include the SF330, Architect/Engineer Qualifications (form is available on-line at http://www.cfm.va.gov/contract/ae.asp).

• The SF330 submission shall not exceed a total of FIFTY (50) pages. This includes CPARS and/or PPQs and any other relevant information. Any pages submitted by an offeror that exceed the limit will not be considered during the evaluation. Each page shall be in Arial or Times New Roman, size 12 font, single spaced. The title page, table of contents, and Part II of the SF330 Form will NOT count toward the page limitation.

• A PPQ from previous projects may be submitted for this project. If significant portions of a project have been completed since the previous PPQ was filled out, a new PPQ should be submitted to accurately assess the project. *Important Note: For this procurement, all PPQs should be completed by the evaluator and returned to the A-E firm. The submitting A-E firm must incorporate completed PPQs into the SF330 document. PPQs should not be submitted by the evaluator directly to VHA PCAC.

• Within the SF330 submissions, firms must provide a document that includes the following information (This document will not count towards the page limitation of the SF330):

mailto:jason.phillip@va.gov http://www.cfm.va.gov/contract/ae.asp

1) Cage Code; 2) Dun & Bradstreet Number; 3) Tax ID Number; 4) The E-mail address and Phone number of the Primary Point of Contact; 5) A copy of the firms Vet Biz Registry (https://vetbiz.va.gov/vip/).

• All questions shall be submitted to jason.phillip@va.gov with the subject line “Houston Question R0001”. The cutoff date for question submissions is 2:00 PM ET ON December 7, 2021. Questions will be answered through modification to the Pre-Sol Notice posted to Contract Opportunities https://sam.gov/content/opportunities

• NOTE: This procurement is 100% set-aside for Service-Disabled Veteran- Owned Small Business (SDVOSB) concerns. Offers received from other than SDVOSBs will not be considered. All SDVOSB must be listed as verified by the VA’s Center for Verification and Evaluation (CVE) (https://www.va.gov/osdbu/verification/index.asp). Offerors must be verified by CVE and visible in the Vendor Information Portal (VIP) database (https://vetbiz.va.gov/vip/) at the time of the SF330 Submission, Written Response Submission or Interview Presentation (as applicable), and at the time of Award. Failure to be BOTH visible and verified at these times will result in the offeror being deemed unacceptable and ineligible for award.

• All prime firms are required to meet the NAICS code requirement specified for this project. The Contracting Officer shall verify the NAICS Code in VIP and/or the System for Award Management (SAM). Failure to meet the NAICS code requirement may result in the rejection of the SF330 submission.

• All Joint Ventures must be CVE verified at time of the SF330 Submission, Written Response Submission or Interview Presentation (as applicable) and at the time of Award. They must also submit agreements that comply with 13CFR 125.15 prior to contract award.

• SF330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated.

All information must be included in the SF330 submission package.

• It is the offeror’s responsibility to check the Contract Opportunities website at https://sam.gov/content/opportunities for any revisions to this announcement prior to submission of SF330s.

See attached document: PPQ - Lebanon EHRM Infrastructure.

See attached document: SOW - Lebanon EHRM Infrastructure Upgrades Design - Final 11-

4-21.

End of Document https://vetbiz.va.gov/vip/ mailto:jason.phillip@va.gov https://sam.gov/content/opportunities https://www.va.gov/osdbu/verification/index.asp https://vetbiz.va.gov/vip/ https://sam.gov/content/opportunities

File details come from the government source that posted it. Updated .