Section_E-Specifications_(Group_2).pdf

PDF 181 KB Posted

Attached to
Countywide Mast Arms - Group 2
Solicitation number
23-0211-ITB-CP
Issued by
Pinellas County, Florida

About this file

This document is a Section E Supplemental Specifications file for Road and Street Construction, issued by Pinellas County, Florida, in conjunction with the Pinellas County Standard Technical Specifications and Florida Department of Transportation (FDOT) Standard Specifications. The document covers the Countywide Mast Arms – Group 2 project, which involves specific supplemental specifications for survey and layout, as well as clearing and grubbing activities within the county right-of-way. The specifications provide detailed instructions for contractors, including requirements for staking out right-of-way, protecting property corners, notifying property owners about item removal, and handling irrigation systems during construction.

The document outlines specific payment terms, noting that survey and construction layout work will be paid as a single Lump Sum (LS) quantity. Contractors are required to notify property owners 14 calendar days in advance of construction activities, remove conflicting items, and cap irrigation system pipes. The specifications emphasize the contractor's responsibilities for protecting and potentially restoring property corners, with any damage to be repaired by a Florida registered Professional Land Surveyor at no additional cost to the county. The project is associated with specific Project Identification Numbers (P.I.D. No. 004183A and related numbers) and focuses on intersection improvements, including modifications to meet ADA guidelines.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION E SUPPLEMENTAL SPECIFICATIONS

ROAD AND STREET CONSTRUCTION

P.I.D. No. 004183A (003876A, 004183C, 004183H, 004183I)

Countywide Mast Arms – Group 2

In Pinellas County, Florida

TO ACCOMPANY PINELLAS COUNTY STANDARD TECHNICAL SPECIFICATIONS FOR ROADWAY

AND RELATED CONSTRUCTION (APRIL 2022 EDITION), AND FLORIDA DEPARTMENT OF

TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE

CONSTRUCTION – DIVISIONS II AND III ONLY (JULY 2022):

SPECIAL PROVISIONS

Section 005-0701 of the Pinellas County Roadway Std. Tech. Specs. Survey and Layout The specification for Survey, Construction Layout shall be amended to include:

• The right of way shall be staked out with a stake or marker every 100 feet on both sides of the road.

• All property corners and section corners shall be protected through the contract period by the contractor, if a property corner is damaged, they will be restored by a Florida registered Professional Land Surveyor at no additional cost to the County.

PAY ITEM NO. 005-0701, SURVEY, Construction Layout the work specified under this Section must be one Lump Sum (LS) quantity.

Section 110 of the Pinellas County Road Std Tech. Specs. Clearing and Grubbing The specification for Clearing and Grubbing shall be amended with the following:

B. Items in County Right-of-Way:

The Contractor must notify in writing all property owners to remove any items (landscaping, signs, lighting, etc.) from the County Right-of-Way that owners wish to salvage a minimum of fourteen (14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. The contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County Right of Way. The price and payment for capping and removal of irrigation systems, and removal of other items must be included in the payment item of Clearing and Grubbing.

File details come from the government source that posted it. Updated .