This document is a geotechnical engineering report prepared by Tierra, Inc. for VHB, related to the Countywide Mast Arm Hardening and Intersection Improvements Project in Pinellas County, Florida. The report details a geotechnical study conducted for mast arm signal pole structures at the intersection of 54th Avenue N. and 62nd Street N. Tierra performed two Standard Penetration Test (SPT) borings to a depth of approximately 30 feet to evaluate subsurface conditions, with one test boring conducted near each proposed foundation location. The study involved soil sampling, laboratory testing, and provides geotechnical recommendations for the design of drilled shaft foundations for the mast arm signal pole structures.
The report reveals that the subsurface conditions consist of very loose to medium dense sandy soils from the ground surface to the boring termination depth. Groundwater was encountered at depths ranging from 5 to 6 feet below the existing ground surface. The document provides detailed soil parameters, including soil type, unit weight, and internal friction angle, and recommends designing the foundations based on saturated conditions. Tierra suggests using a weighted average of SPT N-values along the proposed shaft length and applying a 1.24 multiplier to the SPT N-values. The report also includes recommendations for shaft embedment, installation methods, and notes potential challenges such as concrete volume overruns and the need for temporary casing during shaft construction.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tierra, Inc.
7351 Temple Terrace Highway • Tampa, Florida 33637
Phone (813) 989-1354 • Fax (813) 989-1355
September 21, 2021
VHB
225 E. Robinson Street, Suite 300 Landmark Center Two Orlando, Florida 32801-4326
Attn: Joe Perri SE Reg. Transportation Technology/ITS Manager
RE: Report of Geotechnical Engineering Services
Mast Arm Signal Pole Structures Countywide Mast Arm Hardening and Intersection Improvements Project Intersection of 54th Street N. and 62nd Street N.
Pinellas County, Florida
PID: 004183C
Tierra Project No.: 6511-17-070-002
Mr. Perri:
Tierra, Inc. (Tierra) has performed a geotechnical study for the proposed mast arm signal pole structures associated with the above referenced project. This letter presents the findings of our field exploration, laboratory testing program and geotechnical recommendations for use in the design of the proposed mast arm signal pole structures. It is our understanding that the mast arm structure foundations will consist of drilled shafts.
Soil Borings
To evaluate the subsurface conditions, Tierra performed two (2) Standard Penetration Test (SPT) borings to a depth of approximately 30 feet below the existing ground surface. One (1) test boring was conducted in the vicinity of each proposed foundation location.
The SPT borings were located in the field by a representative of Tierra using design information provided by VHB and our hand-held, non-survey grade Global Positioning System (GPS) devices that have a manufacturer’s reported accuracy of ± 10 feet. The station, offset, and elevation of each boring location were estimated based on the GPS coordinates obtained in the field in conjunction with the project design files provided by VHB. Therefore, the boring locations and elevations should be considered approximate. If a more accurate determination of the boring locations and elevations is required, Tierra recommends the borings be survey-located by a professional land surveyor.
The SPT borings were performed with the use of a mechanical drill rig equipped with an automatic hammer using Bentonite Mud drilling procedures. The soil sampling was performed in general accordance with American Society for Testing and Materials (ASTM) test designation D- 1586. Due to the presence of existing utilities, the initial 6 feet of the SPT borings were advanced by manual auger to verify utility clearances. SPT N-values were then taken continuously to a depth of 10 feet and at intervals of 5 feet thereafter to the boring termination depths. Representative portions of these soil samples were sealed in glass jars, labeled and transferred to our laboratory for classification and analysis.
Report of Geotechnical Engineering Services Mast Arm Signal Pole Structures Countywide Mast Arm Hardening and Intersection Improvements Project Intersection of 54th Avenue N. and 62nd Street N.
Pinellas County, Florida
PID: 004183C
General Soil Conditions
Based on the results of the SPT borings, the subsurface conditions in the vicinity of the proposed mast arm signal pole locations consist of very loose to medium dense sandy soils from the existing ground surface to the boring termination depth.
Soil stratification was determined based on a review of the recovered soil samples, laboratory classification tests and interpretation of the field boring logs. Stratification lines represent approximate boundaries between soil layers of different engineering properties; however, actual transitions between layers may be gradual. In some cases, small variations in properties that were not considered pertinent to our engineering evaluation may have been abbreviated or omitted for clarity. The soil profiles represent the conditions encountered at the boring locations and variations in soil conditions should be anticipated. Specific details about subsurface conditions and materials encountered at the test locations can be obtained from the Report of Core Borings sheet in the Attachments.
The groundwater level was encountered within the borings at depths ranging from approximately 5 to 6 feet below the existing ground surface. The encountered groundwater levels are illustrated adjacent to the soil profiles on the Report of Core Borings sheet provided in the Attachments. It should be noted that groundwater levels tend to fluctuate during periods of prolonged drought and extended rainfall and may be affected by man-made influences. In addition, a seasonal affect will also occur in which higher groundwater levels are normally recorded in rainy seasons.
General Recommendations
Soil Parameters for Design of Mast Arm Signal Pole Structure Foundations
It is our understanding that the design of the proposed mast arm signal pole foundations will be performed by VHB utilizing the approved FDOT Mathcad program. The FDOT Mathcad program models the subsurface as a uniform soil type with consistent strength properties. However, the results of the borings indicate variable soil properties throughout the boring depths.
Recommended soil parameters for design of the mast arm signal pole foundations are provided in the Recommended Soil Parameters for Mast Arm Signal Pole Foundations table in the Attachments. These parameters include soil type, soil unit weight and internal friction angle. It is recommended that the foundations be designed based on saturated conditions, i.e. the groundwater table at the ground surface.
The current FDOT methodology for mast arm signal pole foundations reduces the torsional resistance factor (omega, ω) for sandy soils when the average SPT N-value of the sandy soils along the shaft is less than 15. Tierra recommends that the designer utilize a weighted average along the proposed shaft length within the portion of the sandy soils to determine the average SPT N-value. This may require iterations until the shaft meets the torsional resistance requirement. The SPT borings were performed with an automatic hammer. We recommend a
1.24 multiplier be applied to the SPT N-value (for example, if the average SPT N-value from the boring profile is 8, a value of 10 should be used in the analysis). Recommended average
Countywide Mast Arm Hardening and Intersection Improvements Project Intersection of 54th Avenue N. and 62nd Street N.
Pinellas County, Florida
PID: 004183C
equivalent SPT N-values for the design of each mast arm signal pole foundation are provided in the Recommended Average N-Value for Mathcad Spreadsheet tables in the Attachments.
Shaft Embedment/Length
If the proposed structure foundations are to be installed within berms or embankments with side slopes steeper than 4H:1V, the foundation designer should include the portion of the shaft with less than 2.5D (D=shaft diameter) horizontal soil cover (face-of-shaft to face-of-slope) in the unsupported length, and design the portion of the shaft with more than 2.5D horizontal soil cover as though founded in level ground.
The foundations should not be tipped/embedded within one (1) shaft diameter above very loose soils with SPT N-values of 2 or less to reduce the risk of excessive settlement of the shaft and the potential for instability of the shaft bottom during construction. In the event that the shaft tip elevation is determined to be within one (1) shaft diameter above very loose soils (SPT N-value of 2 or less) based on the design calculations, the shaft should be extended below the very loose soils into denser underlying materials.
It is recommended that Tierra be provided the design shaft tip elevations for review prior to the final plans submittal.
Shaft Installation
The proposed mast arm signal pole structure foundations will consist of drilled shafts and should be installed in accordance with the FDOT and Pinellas County Specifications.
Concrete volume overruns may occur during the shaft installation process due to the loose conditions of the sandy soils encountered within the borings.
Temporary casing methods for shaft installation beyond what is required in the FDOT Specifications may be required in order to prevent the collapse of sandy soils and/or groundwater intrusion during shaft construction.
Report Limitations
Our services have been performed, our findings obtained and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices at the time of this report. Tierra is not responsible for the conclusions, opinions or recommendations made by others based on this data.
The scope of the exploration was intended to evaluate soil conditions within the influence zone of the proposed mast arm signal pole structure foundations. The analyses and recommendations submitted in this report are based upon the data obtained from the soil borings performed at the locations indicated. If any subsoil variations become evident during the course of this project, a re-evaluation of the recommendations contained in this report will be necessary after we have had an opportunity to observe the characteristics of the condition
Countywide Mast Arm Hardening and Intersection Improvements Project Intersection of 54th Avenue N. and 62nd Street N.
Pinellas County, Florida
PID: 004183C
encountered. The applicability of the report should also be reviewed in the event significant changes occur in the design, nature or location of the proposed structures.
The scope of our services did not include any environmental assessment or investigation for the presence or absence of hazardous or toxic materials in the soil, groundwater, or surface water within or beyond the site studied. Any statements in this report regarding odors, staining of soils, or other unusual conditions observed are strictly for the information of VHB and their client. This report was prepared for the exclusive use of VHB and their client for evaluating the design of the project as it relates to the geotechnical aspects discussed herein.
Tierra, Inc. appreciates the opportunity to be of service to VHB on this project. If you have any questions or comments regarding this report, please contact our office at your earliest convenience.
Sincerely, TIERRA, INC.
Kaitlyn C. Waterman, E.I. Lawrence P. Moore, P.E.
Geotechnical Engineering Intern Principal Geotechnical Engineer Florida License No. 47673
Kevin H. Scott, P.E.
Senior Geotechnical Engineer Florida License No. 65514
Attachments:
Report of Core Borings Recommended Soil Parameters for Mast Arm Signal Pole Foundations Recommended Average N-Value for Mathcad Spreadsheet
V
V
V
V
N D
S T
. N
54TH AVE. N.BL
54TH AVE. N
SG-32-50L
SG-33+50R
BORING LOCATION PLAN
PLAN SCALE
0 50'
SOIL PROFILES
CHECKED BY:
DRAWN BY:
DATE:
APPROVED BY:
SCALE: PROJECT NUMBER:
ENGINEER OF RECORD:
LEGEND
KCW
SW
SEP 2021
LPM
NOTED 6511-17-070-002
PINELLAS COUNTY, FLORIDA
REPORT OF CORE BORINGS
SHEET 1TIERRA
7351 Temple Terrace Highway Tampa, Florida 33637 Phone: 813-989-1354 Fax: 813-989-1355
SP
N
HA
APPROXIMATE LOCATION OF SPT BORING
HAND AUGERED TO VERIFY UTILITY CLEARANCES
SPT N-VALUE IN BLOWS/FOOT FOR 12 INCHES
OF PENETRATION (UNLESS OTHERWISE NOTED)
GRAY TO BROWN SAND TO SAND WITH SILT (SP/SP-SM)
UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2488)
GROUP SYMBOL AS DETERMINED BY VISUAL REVIEW
GROUNDWATER LEVEL ENCOUNTERED DURING
INVESTIGATION
NOTES:
THE BORINGS WERE LOCATED IN THE FIELD BY A REPRESENTATIVE OF TIERRA, INC. USING
HAND-HELD, NON-SURVEY GRADE GARMIN ETREX GLOBAL POSITIONING SYSTEM (GPS) EQUIPMENT
WITH A MANUFACTURER'S REPORTED ACCURACY OF ± 10 FEET. STATION AND OFFSET OF THE
BORING LOCATIONS WERE DETERMINED USING THE GPS COORDINATES OBTAINED IN THE FIELD IN CONJUNCTION WITH PROJECT DESIGN FILES PROVIDED BY VHB. THE ELEVATIONS OF THE BORING LOCATIONS WERE DETERMINED USING PROJECT DESIGN FILES PROVIDED BY VHB BASED ON THE
APPROXIMATE BORING LOCATIONS. THE BORING LOCATIONS AND ELEVATIONS SHOULD BE
CONSIDERED APPROXIMATE.
CONCRETE VOLUME OVERRUNS MAY OCCUR DURING THE SHAFT INSTALLATION PROCESS DUE TO
THE LOOSE CONDITIONS OF THE SANDY SOILS ENCOUNTERED WITHIN THE BORINGS.
TEMPORARY CASING METHODS FOR SHAFT INSTALLATION BEYOND WHAT IS REQUIRED IN THE FDOT SPECIFICATIONS MAY BE REQUIRED IN ORDER TO PREVENT THE COLLAPSE OF SANDY SOILS AND/OR
GROUNDWATER INTRUSION DURING SHAFT CONSTRUCTION
1.
2.
3.
NAVD 88 NORTH AMERICAN VERTICAL DATUM OF 1988
BASELINE SURVEY OF 54TH AVE. NORTH54TH AVE. N.
RECOMMENDED ENVIRONMENTAL CLASSIFICATION:
SUBSTRUCTURE CONCRETE: EXTREMELY AGGRESSIVE
SUBSTRUCTURE STEEL: EXTREMELY AGGRESSIVE
BL
INTERSECTION OF
54TH AVE. N AND 62ND ST. N
12 TO 24
6 TO 12
24 TO 40
8 TO 24
3 TO 8
GREATER THAN 24
LESS THAN 3
GREATER THAN 40
LESS THAN 1
VERY LOOSE
HARD
VERY STIFF
STIFF
SILTS AND CLAYS
CONSISTENCY
FIRM
SOFT
VERY SOFT
LOOSE
MEDIUM
DENSE
VERY DENSE
3 TO 6
1 TO 3
RELATIVE DENSITY
GRANULAR MATERIALS- SPT
(BLOWS/FT.)
SPT
(BLOWS/FT.)
AUTOMATIC HAMMER
-5
-10
E L
E V
A T
IO
N
IN
F
E E
T
N A
V D
N
HA
HA
HA
BOR # SG-32+50L
STA. 32+49
REF. BL 54TH AVE N.
OFF. 60' LT.
ELEV. 21.0
DATE 9/9/2021
DRILLER J. ERICKSON
HAMMER AUTOMATIC
RIG D-25
P
N
HA
HA
HA
BOR # SG-33+50R
STA. 33+70
REF. BL 54TH AVE N.
OFF. 31' RT.
ELEV. 20.9
DATE 9/9/2021
DRILLER J. ERICKSON
HAMMER AUTOMATIC
RIG D-25
-5
-10
E L
E V
A T
IO
N
IN
F
E E
T
N A
V D
P ASPHALT AND PAVEMENT BASE MATERIAL
LAWRENCE P. MOORE, P.E.
FLORIDA LICENSE NO.:
47673
-200 PERCENT PASSING #200 SIEVE
-200 = 2
Station
(feet)
Offset
(feet) Reference
1 32+40 39' LT. B/L 54TH AVE N. MAST ARM SG-32+50L SAND 105 43 29 Refer to N-Average Table
2 33+61 39' RT. B/L 54TH AVE N. MAST ARM SG-33+50R SAND 105 43 29 Refer to N-Average Table
Notes:
(1) Recommend analysis based on saturated conditions, i.e. analyze with the groundwater at the surface.
(2) Effective unit weight based on saturated conditions.
Tierra Project No.: 6511-17-070-002
Recommended Soil Parameters for Mast Arm Signal Pole Foundations
Countywide Mast Arm Hardening and Intersection Improvements Project
Pinellas County, Florida
PID: 004183C
Intersection of 54th Ave. N. and 62nd St. N.
Signal
Pole No.
Structure
Type
Friction
Angle
(φ,°)
Recommended
N-Value
Total
Saturated
Unit Weight
(γ, lb/ft (1)
Effective
Unit Weight
(γ, lb/ft (2)
Reference
Boring Soil Type
Signal Pole Location
Reference Boring: SG-32+50L
Boring Station & Offset:
(B/L 54TH AVE N.)
32+49, 60' LT.
21.0 Structure Station & Offset:
(B/L 54TH AVE N.)
32+40, 39' LT.
Approximate
Shaft Depth
(feet)
Approximate
Shaft Elevation
(feet, NAVD 88)
Automatic Hammer SPT
N-Value
Corrected Safety Hammer
N-Value (2)
Average Weighted N-Value for use in MathCAD Torsional
Calculation
1 20.0 HA
(3) 1.2 1
2 19.0 HA
(3) 1.2 1
3 18.0 HA
(3) 1.2 1
4 17.0 HA
(3) 1.2 1
5 16.0 HA
(3) 1.2 1
6 15.0 HA
(3) 1.2 1
7 14.0 1 1.2 1
8 13.0 1 1.2 1
9 12.0 3 3.7 1
10 11.0 3 3.7 2
11 10.0 3 3.7 2
12 9.0 3 3.7 2
13 8.0 3 3.7 2
14 7.0 6 7.4 3
15 6.0 6 7.4 3
16 5.0 6 7.4 4
17 4.0 6 7.4 4
18 3.0 6 7.4 5
19 2.0 17 21.1 6
20 1.0 17 21.1 6
21 0.0 17 21.1 7
22 -1.0 17 21.1 8
23 -2.0 17 21.1 8
24 -3.0 9 11.2 9
25 -4.0 9 11.2 9
26 -5.0 9 11.2 9
27 -6.0 9 11.2 9
28 -7.0 9 11.2 9
29 -8.0 19 23.6 9
30 -9.0 19 23.6 10
(3)
HA: Hand augered. Corrected Safety Hammer N-Value treated as 1.2.
(2) Automatic Hammer SPT N-Value is corrected by a factor of 1.24 to equivalent Safety Hammer N-Value in accordance with
FDOT Specifications.
(1) Approximate ground elevation at structure location not available.
Recommended Average N-Value for MathCAD Spreadsheet
Countywide Mast Arm Hardening and Intersection Improvements Project
Intersection of 54th Ave. N. and 62nd St. N.
Pinellas County, Florida
PID: 004183C
Tierra Project No.: 6511-17-070-002
Approximate Structure Ground Elevation
(feet, NAVD 88):
N/A
(1)
Approximate Boring Ground Elevation
(feet, NAVD 88):
Pole 1
Reference Boring: SG+33+50R
Boring Station & Offset:
(B/L 54TH AVE N.)
33+70, 31' RT.
20.9 Structure Station & Offset:
(B/L 54TH AVE N.)
33+61, 39' RT.
Approximate
Shaft Depth
(feet)
Approximate
Shaft Elevation
(feet, NAVD 88)
Automatic Hammer SPT
N-Value
Corrected Safety Hammer
N-Value (2)
Average Weighted N-Value for use in MathCAD Torsional
Calculation
1 19.9 HA
(3) 3.7 3
2 18.9 HA
(3) 3.7 3
3 17.9 HA
(3) 3.7 3
4 16.9 HA
(3) 3.7 3
5 15.9 HA
(3) 3.7 3
6 14.9 HA
(3) 3.7 3
7 13.9 3 3.7 3
8 12.9 3 3.7 3
9 11.9 4 5.0 3
10 10.9 4 5.0 4
11 9.9 4 5.0 4
12 8.9 4 5.0 4
13 7.9 4 5.0 4
14 6.9 7 8.7 5
15 5.9 7 8.7 5
16 4.9 7 8.7 5
17 3.9 7 8.7 6
18 2.9 7 8.7 6
19 1.9 12 14.9 7
20 0.9 12 14.9 8
21 -0.1 12 14.9 8
22 -1.1 12 14.9 9
23 -2.1 12 14.9 9
24 -3.1 2 2.5 9
25 -4.1 2 2.5 8
26 -5.1 2 2.5 8
27 -6.1 2 2.5 7
28 -7.1 2 2.5 7
29 -8.1 21 26.0 7
30 -9.1 21 26.0 8
Tierra Project No.: 6511-17-070-002
Recommended Average N-Value for MathCAD Spreadsheet
Countywide Mast Arm Hardening and Intersection Improvements Project
Intersection of 54th Ave. N. and 62nd St. N.
Pinellas County, Florida
PID: 004183C
Approximate Structure Ground Elevation
(feet, NAVD 88):
N/A
(1)
Approximate Boring Ground Elevation
(feet, NAVD 88):
Pole 2
(2) Automatic Hammer SPT N-Value is corrected by a factor of 1.24 to equivalent Safety Hammer N-Value in accordance with
FDOT Specifications.
(1) Approximate ground elevation at structure location not available.
(3)
HA: Hand augered. Corrected Safety Hammer N-Value treated as 3.7.
File details come from the government source that posted it. Updated .