Plans-004183A_Group_2.pdf
PDF 13 MB Posted
- Attached to
- Countywide Mast Arms - Group 2
- Solicitation number
- 23-0211-ITB-CP
- Issued by
- Pinellas County, Florida
About this file
The provided file is a comprehensive set of engineering and design plans for a Pinellas County Public Works infrastructure project involving traffic signal mast arm hardening and intersection improvements at four separate locations: Park Boulevard and Belcher Road, 54th Avenue N and 58th Street N, 54th Avenue N and 62nd Street N, and 49th Street N and 70th Avenue N. The project includes installing new signal infrastructure, mast arms, pedestrian signals, video detection systems, fiber optic communications, electrical services, and associated civil work to modernize intersections and improve Americans with Disabilities Act (ADA) compliance. The plans detail precise engineering specifications, including utility relocations, signal phasing, traffic control strategies, and detailed construction drawings for each intersection.
The project documents indicate a comprehensive approach to infrastructure modernization, with detailed soil boring reports, utility coordination requirements, and specific technical specifications for equipment installation. The estimated work includes furnishing and installing steel mast arm assemblies, traffic signals, pedestrian signals, fiber optic cables, electrical services, concrete work, and associated civil engineering tasks. The project will require careful coordination with multiple utility providers, including Charter Communications, Duke Energy, Frontier Communications, and Pinellas County utilities. The design incorporates advanced traffic management technologies, including video detection systems, optical preemption, and ethernet networking, with a focus on creating a modern, adaptable traffic signal infrastructure that meets current engineering standards and local transportation requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lawrence P Moore
2022.09.22 12:20:53-04'00'
Kenneth B Ray Digitally signed by Kenneth B Ray Date: 2022.09.22 15:12:15 -04'00'Jared N Knight
Digitally signed by Jared N Knight DN: CN=Jared N Knight, dnQualifier=A01410D0000017EB6AB99A7000589F9, O=VANASSE HANGEN BRUSTLIN INC., C=US
Date: 2022.09.22 17:16:31-04'00'
GOVERNING SPECIFICATIONS AND STANDARDS:
1. FLORIDA DEPARTMENT OF TRANSPORTATION DIVISION II AND III OF "STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", (JANUARY 2021) AND ALL
SUPPLEMENTAL SPECIFICATIONS THERETO. STANDARD SPECIFICATIONS ARE AVAILABLE
AT THE FOLLOWING WEBSITE:
HTTP://WWW.FDOT.GOV/PROGRAMMANAGEMENT/IMPLEMENTED/SPECBOOKS
2. FLORIDA DEPARTMENT OF TRANSPORTATION FY (2021-2022) STANDARD PLANS FOR
ROAD AND BRIDGE CONSTRUCTION AND APPLICABLE INTERIM REVISIONS (IRs). STANDARD PLANS FOR ROAD CONSTRUCTION AND IRs ARE AVAILABLE AT THE FOLLOWING WEBSITE:
HTTP://WWW.FDOT.GOV/DESIGN/STANDARDPLANS COMPLIANCE WITH ALL APPLICABLE
INDICES IS REQUIRED.
3. STATE OF FLORIDA "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN,
CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS", 2018 (FLORIDA
GREENBOOK)
HTTP://WWW.FDOT.GOV/ROADWAY/FLORIDAGREENBOOK/FGB.SHTM
PINELLAS COUNTY "STANDARD TECHNICAL SPECIFICATIONS FOR UTILITIES &
RELATED CONSTRUCTION" APRIL 2022 AVAILABLE ON-LINE:
HTTP://WWW.PINELLASCOUNTY.ORG/TECHNICAL/
5. PINELLAS COUNTY "STANDARD ENGINEERING DETAILS" FEBRUARY 2022 AVAILABLE
ON-LINE:HTTP://WWW.PINELLASCOUNTY.ORG/TECHNICAL/
6. PINELLAS COUNTY "TRAFFIC OPERATIONS SIGNAL STANDARDS" 2017.1 EDITION
AVAILABLE BY REQUEST
WHEN FDOT AND PINELLAS COUNTY SPECIFICATIONS DIFFER, PINELLAS COUNTY
SPECIFICATIONS SHALL TAKE PRECEDENCE IF PINELLAS COUNTY'S IS MORE STRINGENT
AS DETERMINED BY THE ENGINEER.
NOTIFICATIONS:
1. CONTACT PINELLAS COUNTY TRAFFIC ENGINEERING, (727-464-8922) PRIOR TO THE
BEGINNING OF WORK TO CHECK FOR UPDATES TO STANDARDS OR OTHER INFORMATION.
2. ONE WEEK PRIOR TO THE BEGINNING OF WORK, NOTIFY:
MR. JOHN LEMONIAS, PINELLAS COUNTY
22211 US 19 NORTH CLEARWATER, FL 33765 PHONE: (727) 420-6270 MR. VINCE HARPER,
PINELLAS COUNTY 22211 US HIGHWAY 19 NORTH
CLEARWATER, FL 33765
PHONE: (727) 410-6301
MR. WAYNE DEMPSEY
FDOT DISTRICT SEVEN TRAFFIC OPERATIONS
CONSTRUCTION LIAISON
FLORIDA DEPARTMENT OF TRANSPORTATION
11201 NORTH McKINLEY DRIVE
TAMPA, FLORIDA 33612
PHONE (813) 975-6226
3. GIVE THE ENGINEER A MINIMUM OF TWO FULL BUSINESS DAYS NOTICE PRIOR TO
FOUNDATION EXCAVATION FOR MAST ARMS FOR FINAL LOCATION APPROVAL.
4. OBTAIN LOCAL PERMITS TO WORK OUTSIDE THE FDOT AND COUNTY RIGHT OF WAY ON
LOCAL STREETS.
FIELD VERIFICATION AND ADJUSTMENTS:
1. ADJUST EQUIPMENT OR COMMUNICATION INFRASTRUCTURE FROM LOCATIONS SHOWN ON
THE PLANS WHEN NECESSARY DUE TO FIELD CONDITIONS AFTER APPROVAL FROM THE
ENGINEER. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE RECORDED
ON THE AS-BUILT PLANS AND TABULATION SHEETS.
GENERAL CONSTRUCTION:
1. RETURN ALL DISTURBED AREAS TO PRECONSTRUCTION CONDITIONS WITHIN 72
HOURS OF THE CONSTRUCTION ACTIVITY. THIS INCLUDES RESTORATION OF GRADE AND
SODDING FOR STABILIZATION AND WATERING OF THE SOD UNTIL IT HAS TAKEN ROOT.
2. FURNISH THE INSPECTOR AND PINELLAS COUNTY TRAFFIC SIGNAL SHOP THREE
COMPLETE SETS OF AS-BUILT PLANS, BORE LOGS AND RESISTANCE READINGS OF BOTH
LOOPS AND GROUND RODS PRIOR TO FINAL INSPECTION OF THE PROJECT. PLANS MUST
INCLUDE DEPTH AND OFFSET OF ALL CABLES INSTALLED. IN ADDITION, SUBMIT ONE SET
OF COMPLETE AS-BUILT PLANS TO BOTH FDOT DISTRICT SEVEN TRAFFIC OPERATIONS
AND FDOT PINELLAS MAINTENANCE. SEND A WRITTEN REQUEST TO PINELLAS COUNTY
TRAFFIC ENGINEERING TO TRANSFER MAINTENANCE FROM THE CONTRACTOR TO THE
COUNTY UPON PASSING THE FINAL INSPECTION.
3. IF SIDEWALK IS DAMAGED OR REMOVED DURING THE COURSE OF CONSTRUCTION,
THE CONTRACTOR SHALL REPLACE THE ENTIRE SIDEWALK SLAB FROM EXPANSION JOINT
TO EXPANSION JOINT AT THE CONTRACTOR'S EXPENSE. SIDEWALK DISTURBED DURING
CONSTRUCTION SHALL BE RESTORED WITHIN 72 HOURS.
4. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW FOR ALL EQUIPMENT AND
MATERIALS FURNISHED AND INSTALLED. FURNISH COPIES OF ALL DRAWINGS, SCHEDULES,
AND COMPLETE DESCRIPTIVE AND TECHNICAL DATA ON ALL ITEMS.
5. THE ACCEPTANCE OF ANY SUBMITTED DATA FOR MATERIALS, EQUIPMENT,
APPARATUS, DEVICES, ARRANGEMENTS, AND/OR LAYOUTS SHALL NOT RELIEVE THE
CONTRACTOR FROM THE RESPONSIBILITY OF PLACING PROPER DIMENSIONS, CAPACITIES,
SIZES, QUANTITIES, AND INSTALLATION DETAILS TO EFFICIENTLY PERFORM THE
REQUIREMENT AND INTENT OF THE CONTRACT. SUCH ACCEPTANCE SHALL NOT RELIEVE
THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS OR ANY SORT ON THE SUBMITTAL
FORM.
6. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FACT THAT ALL CONSTRUCTION
ACTIVITIES SHALL CONFORM TO PINELLAS COUNTY CODE CHAPTER 58, ENVIRONMENT,
ARTICLE XII - NOISE, SECTION 58-441 THROUGH 58-454.
7. ANY DAMAGE TO PINELLAS COUNTY OR FDOT INFRASTRUCTURE RESULTING FROM THE
PROPOSED DIRECTIONAL DRILLING MUST BE REPAIRED BY THE CONTRACTOR IMMEDIATELY
FOLLOWING THE DAMAGING EVENT AT THE CONTRACTOR'S EXPENSE.
SURVEY:
1. ALL SURVEY INFORMATION WAS OBTAINED FROM A LICENSED FLORIDA
PROFESSIONAL SURVEYOR AND MAPPER AND UTILIZED AS SUPPORTING DATA
IN THE PRODUCTION OF DESIGN PLANS AND FOR CONSTRUCTION ON SUBJECT
PROJECT. THE PROFESSIONAL SURVEYOR AND MAPPER OF RECORD IS:
PATRICK MCCORMACK, P.S.M.
P.S.M. NO.: 6494
COMPANY NAME: CUMBEY & FAIR INC.
COMPANY ADDRESS: 2463 ENTERPRISE ROAD
CLEARWATER, FLORIDA 33763
LICENSED BUSINESS: 2168
WORK SUPERVISION
1. AN I.M.S.A. CERTIFIED LEVEL II (ELECTRONICS OR ELECTRICAL)
TECHNICIAN ON THE JOB SITE AT ALL TIMES WHEN WORKING WITHIN THE
TRAFFIC SIGNAL CONTROLLER CABINET, SIGNAL POLES OR MAST ARM
ASSEMBLIES.
2. RESPOND TO CALLS TWENTY-FOUR HOURS A DAY, SEVEN DAYS A WEEK.
WITHIN THREE HOURS OF NOTIFICATION OR DOCUMENTED ATTEMPTED
NOTIFICATION, THE CONTRACTOR SHALL BE ON-SITE MAKING NEEDED REPAIRS
OR MODIFICATIONS. FAILURE TO MEET THE TIME REQUIREMENTS GIVES THE
COUNTY, AT THEIR DISCRETION, THE RIGHT TO REQUEST ASSISTANCE FROM
LOCAL LAW ENFORCEMENT TO CONTROL TRAFFIC FOR THE PERIOD OF TIME
UNTIL THE CONTRACTOR RESPONDS AND MAKES NEEDED REPAIRS. THE COST
FOR LAW ENFORCEMENT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
THE COUNTY, AT THEIR DISCRETION, ALSO HAS THE RIGHT TO BRING IN
ASSISTANCE TO MAKE NEEDED REPAIRS AND BE REIMBURSED BY THE
CONTRACTOR, IF THE CONTRACTOR CANNOT MEET THE TIME REQUIREMENTS.
3. A SUPERINTENDENT FOR THE PRIME CONTRACTOR IS REQUIRED TO BE ON
SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. ALL WORKERS ON THE
JOB SITE WILL BE COURTEOUS TO THE PUBLIC AT ALL TIMES AND SHALL
REFER ANY QUESTIONS OR CONCERNS TO THE CONTRACTOR'S SUPERINTENDENT
OR THE COUNTY INSPECTOR. THE SUPERINTENDENT SHALL SPEAK AND
UNDERSTAND ENGLISH AND SHALL BE AVAILABLE AT ALL TIMES FOR TIMELY
RESOLUTION OF PROJECT RELATED ISSUES. PROVIDE A 24 HOUR EMERGENCY
PHONE NUMBER TO THE COUNTY INSPECTOR.
MAST ARM
1. PROVIDE FOUR (4) 2" CONDUITS INTO THE MAST ARM UPRIGHTS.
2. ALL SIGNAL ASSEMBLIES ON THE MAST ARM SHALL HAVE A VERTICAL
CLEARANCE OF 17.5' (MINIMUM) TO 19' (MAXIMUM) FROM THE BOTTOM OF THE
ASSEMBLY TO THE HIGHEST POINT OF THE ROAD BENEATH.
3. THERE ARE MAST ARM LOCATIONS ADJACENT TO RIGHT OF WAY.
CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO NOT ENCROACH OUTSIDE OF
RIGHT OF WAY AT ANY TIME DURING CONSTRUCTION WHERE EASEMENTS ARE
NOT PRESENT.
TRAFFIC CONTROL/EQUIPMENT
1. DURING CONSTRUCTION ALL EXISTING SIGNALIZATION SHALL REMAIN IN
PLACE, INCLUDING VEHICLE ACTUATION AND PEDESTRIAN SIGNAL OPERATION.
ALL ACTUATED PHASES SHALL BE MAINTAINED DURING THE PROJECT,
INCLUDING WHEN LOOPS OR OTHER DETECTION DEVICES ARE DAMAGED. THE
USE OF MICROWAVE DETECTORS OR THE INSTALLATION OF NEW LOOPS WITHIN
48 HOURS OF DAMAGE SHALL BE MADE FOR FULL DETECTOR ACTUATION UNTIL
THE PROPOSED VIDEO DETECTION IS ACTIVATED.
2. UNLESS OTHERWISE NOTED, ALL REMOVED AND SURPLUS EQUIPMENT
SHALL BE DELIVERED TO THE PINELLAS COUNTY TRAFFIC SIGNAL SHOP,
BETWEEN 6:30 AM AND 4:30 PM MONDAY THRU THURSDAY, LOCATED AT 22211
US 19 NORTH, CLEARWATER, FL 33765. PROVIDE A MINIMUM FORTY-EIGHT
HOURS NOTICE PRIOR TO DELIVERY. THE CONTACT PHONE NUMBER IS (727)
464-8922.
3. THROUGHOUT THE ENTIRE PROJECT, MAINTAIN COMMUNICATIONS BETWEEN
THE COMPUTERIZED SIGNAL SYSTEM, THE INTERSECTION AND ADJACENT
INTERSECTIONS (WHERE APPLICABLE) VIA DEDICATED TELEPHONE LINES
AND/OR INTERCONNECT CABLE AND BE RESPONSIBLE FOR ANY ADDITIONAL
COST RELATED TO MAINTAIN THE COMMUNICATIONS. CONTACT PINELLAS COUNTY
TRAFFIC ENGINEERING ONE WEEK PRIOR TO ANY WORK WHICH MAY CAUSE
DISRUPTION OF COMMUNICATIONS.
4. WHEN CONTRACTOR IS WORKING ON A SIGNAL IN AN INTERSECTION
(INSTALLING CONDUIT IN THE STREET, REMOVING EXISTING SIGNAL
EQUIPMENT, INSTALLING NEW SIGNAL EQUIPMENT, LOOPS AND RUNS, OR
TURNING ON A NEW SIGNAL) WHERE A LANE IS CLOSED, THE PROJECT
ENGINEER MAY REQUIRE AN OFF-DUTY LAW ENFORCEMENT OFFICER TO DIRECT
TRAFFIC. THE CONTRACTOR SHALL PROVIDE AN OFF-DUTY LAW ENFORCEMENT
OFFICER WHEN REQUIRED BY THE ENGINEER OR BY PERMIT. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL COSTS FOR THE OFFICER. THE HOURLY RATE
OF PAY FOR AN OFF-DUTY LAW ENFORCEMENT OFFICER CAN BE OBTAINED
FROM THE LOCAL LAW ENFORCEMENT OFFICE.
5. VIDEO VEHICLE DETECTION SYSTEM SHALL BE COMPATIBLE WITH THE
TRAFFIC CONTROLLER SYSTEM SPECIFIED IN PINELLAS COUNTY ROAD AND
BRIDGE SPECIFICATIONS.
LOOPS
1. INDUCTIVE LOOPS SHALL BE 6'X20' AND 2' BEHIND STOP BARS FOR MAIN
STREET THROUGH MOVEMENTS AND 6'X25' AND 2' IN FRONT OF STOP BARS FOR
ALL LEFT TURNS AND SIDE STREET MOVEMENTS.
POWER SERVICE:
1. DISCONNECTS SHALL INCLUDE FDOT APPROVED SURGE ARRESTORS.
UTILITY CONTACT PHONE NUMBER
CHARTER COMMUNICATIONS ARTURAS DUBINAS (727) 290-1509
CITY OF PINELLAS PARK BRUCE CANFIELD (727) 369-5722
CROWN CASTLE NG WALTER GRUGER (215) 622-5927
DUKE ENERGY FL CARTER WILLIAMS (727) 348-8384
FRONTIER COMMUNICATIONS STEPHENS GRANVILLE (813) 486-4650
WOW! DAVE HAMLIN (678) 409-8721
MCI ANDREW COLE (813) 847-4037
PINELLAS COUNTY HWY/ENG JAMES JOHNSON (727) 464-8981
PINELLAS COUNTY UTILITIES-RECLAIM TREVOR SINGH (727) 464-3536
PINELLAS COUNTY UTILITIES-SEWER TREVOR SINGH (727) 464-3536
PINELLAS COUNTY UTILITIES-WATER TREVOR SINGH (727) 464-3536
UNITI FIBER TERRY YOUNG (251) 422-3872
ZAYO TESS BENTAYOU (813) 363-6797
PAY ITEM NOTES:
1. 110-0100: CLEAR AND GRUBBING SHALL INCLUDE REMOVAL OF CONCRETE.
2. 102-1000: SHALL INCLUDE THE COST FOR ALL TRAFFIC CONTROL RELATED
PAY ITEMS INCLUDING THOSE REQUIRED BY THE FDOT STANDARD PLANS
INDEX 102 SERIES. THIS PAY ITEM SHALL ALSO INCLUDE ALL COSTS TO
MAINTAIN ALL TRAFFIC SIGNALIZATION INCLUDING VEHICLE ACTUATION AND
PEDESTRIAN SIGNAL OPERATIONS, UNLESS OTHERWISE SHOWN IN THE PLANS.
3. 102-14: INCLUDES COST FOR OFF DUTY LAW ENFORCEMENT OFFICER
PROVIDED BY THE CONTRACTOR IN ACCORDANCE WITH TRAFFIC CONTROL
EQUIPMENT NOTES THAT ARE NOT SPECIFICALLY CALLED OUT IN THE TRAFFIC
CONTROL PLANS.
4. 630-2-11, 630-2-12: NO TEST BORINGS WERE MADE WHERE CONDUIT
RUNS ARE TO BE INSTALLED. ALL CONDUIT RUNS SHOWN ON THE PLANS ARE
SCHEMATIC AND FIELD ADJUSTMENTS MAY BE NECESSARY. A LOCATE WIRE
SHALL BE INSTALLED FOR LOCATION OF ALL FIBER OPTIC CABLES. ALL LOCATE
WIRE SHALL BE NO. 12 AWG STRANDED AND MEET FDOT SPECIFICATIONS. A
PULL TAPE SHALL BE INSTALLED IN EACH CONDUIT. AT LEAST THREE FEET OF
PULL TAPE SHALL BE ACCESSIBLE AT EACH CONDUIT TERMINATION AND SHALL
BE SECURED WITHIN THE PULL BOX OR PLACE OF TERMINATION. PAYMENT
SHALL BE BASED PER LINEAR FOOT OF CONDUIT AND INCLUDE LOCATE WIRE
AND PULL TAPE.
5. 633-2-31: UNLESS NOTED OTHERWISE, DROP FIBER SPLICE ENCLOSURES
AND TRAYS AS REQUIRED BY THIS CONTRACT SHALL BE SIZED TO
ACCOMMODATE A MINIMUM OF 24 SPLICES.
6. 633-3-35(B): THESE PAY ITEMS SHALL INCLUDE THE COST OF THE FIBER
OPTIC DROP CABLES. THE DROP CABLES SHALL BE 12 COUNT. THE
CONTRACTOR MAY SUBMIT ANOTHER PRODUCT THAT INCLUDES 12 COUNT FIBER
AND PATCH PANEL WITH DUPLEX ST CONNECTORS IN PLACE OF THE
PRE-TERMINATED PATCH PANEL. THE SIZE SHALL NOT EXCEED THAT OF THE
FACTORY PRE-TERMINATED PATCH CABLE/PANEL, AND SHALL INCLUDE A SMALL
FORM MOUNT AND SHALL BE REVIEWED AND APPROVED BY THE ENGINEER.
THE COST FOR EACH PRE-TERMINATED DROP CABLE SHALL INCLUDE TWO
DUPLEX FIBER PATCH CABLES. EACH PATCH CABLE SHALL BE THREE FEET
LONG AND HAVE ST CONNECTORS ON ONE END AND LC CONNECTORS ON THE
OTHER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONFIRM THE
NECESSARY LENGTH OF THE PRE-TERMINATED FIBER OPTIC DROP CABLE AT
EACH LOCATION PRIOR TO ORDERING.
7. 660-4-11, 660-4-12: THE VIDEO DETECTION CAMERA SYSTEM SHALL BE
ECONOLITE AUTOSCOPE VISION. INCLUDE AN AUTOSCOPE COMM MANAGER AS
PART OF THE SYSTEM. COORDINATE WITH THE COUNTY TO ENSURE SOFTWARE
AND FIRMWARE COMPATIBILITY.
8. 663-1-111, 663-1-112: THE OPTICAL PREEMPTION SYSTEM SHALL
CONSIST OF OPTICOM MODEL 711 OVERHEAD DETECTORS AND A MODEL 764
PHASE SELECTOR.
9. 685-1-13: THE UPS SHALL BE A MYERS 2000E INSTALLED IN A SEPARATE
CABINET ON THE CONTROLLER BASE AS PER COUNTY STANDARDS.
8. 680-1-400: PAY ITEM INCLUDES ALL COSTS ASSOCIATED WITH
RELOCATING, INSTALLING, AND TESTING OF EXISTING ADAPTIVE SYSTEM
CONTROL EQUIPMENT TO PROPOSED SIGNAL CABINET. VIDEO DETECTION
SYSTEM SHALL BE REPLACED AS CALLED FOR IN THE PLANS.
9. 670-5-112: PROVIDE CONTROLLER ASSEMBLY FULLY FIBER READY AND
COMPATIBLE WITH ALL PINELLAS COUNTY REQUIREMENTS FOR INTEGRATION INTO THE
COUNTY SYSTEM. THE CONTROLLER SHALL BE AN ECONOLITE COBALT.
UTILITIES:
1. THE LOCATION OF UTILITIES SHOWN IN THE PLANS IS APPROXIMATE. THE
EXACT LOCATION SHALL BE DETERMINED BY THE CONTRACTOR, AT HIS
EXPENSE AND IN COORDINATION WITH UNDERGROUND AND OVERHEAD UTILITY
OWNERS PRIOR TO DIGGING OR ANY DIRECTIONAL BORE EFFORTS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY NOTIFICATIONS AND
COORDINATION WITH UTILITY OWNERS FOR ANY ADJUSTMENTS THAT MAY BE
NECESSARY TO RESOLVE ANY CONFLICTS THAT MAY ARISE BETWEEN THE
CONTRACTOR'S ACTIVITIES AND EXISTING UTILITY LOCATIONS. A CONTRACTOR'S
REPRESENTATIVE SHALL BE PRESENT WHEN THE UTILITY OWNERS LOCATE
THEIR FACILITIES. NOTIFY THE APPROPRIATE UTILITY OWNERS AT LEAST
72-HOURS IN ADVANCE OF FOUNDATION OR POLE SETTING OPERATIONS WHERE
CONFLICT WITH OVERHEAD OR UNDERGROUND UTILITIES IS POSSIBLE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING UTILITIES
DURING CONSTRUCTION. THE COSTS ASSOCIATED WITH UTILITY COORDINATION
AND UTILITY LOCATING SHALL BE INCLUDED IN MOBILIZATION.
2. PERFORM SUBSURFACE UTILITY ENGINEERING (SUE) AT EACH
FOUNDATION. THE SUE EFFORT SHALL BE QUALITY LEVEL A. THE COST TO
PERFORM THIS ACTIVITY SHALL BE INCLUDED IN THE MAST ARM PAY ITEM.
3. FDOT DOES NOT LOCATE THEIR DRAINAGE STRUCTURES AS PART OF
SUNSHINE ONE CALL. VERIFY EXISTING UNDERDRAIN AT STORM STRUCTURES
WITH FDOT MAINTENANCE PERSONNEL. MAINTAIN A MINIMUM OF TWO-FOOT
CLEARANCE FROM THE UNDERDRAIN FILTER MATERIAL, PARALLEL AND
CROSSING.
4. ALL INFRASTRUCTURE INSTALLED WITHIN THE RIGHT-OF-WAY SHALL BE
IN ACCORDANCE WITH PRACTICES REFERENCED IN THE LATEST FDOT UTILITY
ACCOMMODATIONS MANUAL.
5. CONTACT THE POWER UTILITY PROVIDING ELECTRICAL SERVICE TO
DETERMINE IF A SERVICE PROCESSING FEE OR SPECIAL IMPACT CONNECTION
FEES ARE CHARGED BY THE UTILITY FOR ELECTRICAL SERVICE CONNECTION.
6. AS PART OF THE PAYMENT FOR ELECTRICAL POWER SERVICE ASSEMBLY,
OBTAIN A PERMIT AND INSPECTION OF THE ELECTRICAL SERVICE. ALL PERMIT
FEES SHALL BE INCLUDED IN THE POWER SERVICE ASSEMBLY COST. THE
METER BASE SHALL INCLUDE A BYPASS HANDLE TO ALLOW CONTINUOUS
VOLTAGE UNDER METER CHANGE OUT.
V
B
7. ALL UTILITIES IDENTIFIED IN A UTILITY RELOCATION SCHEDULE
INTERFERING WITH CONSTRUCTION WILL BE REMOVED, RELOCATED, OR
ADJUSTED BY THEIR RESPECTIVE OWNER AT THEIR EXPENSE. THE
CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNERS UPON AWARD OF
THE CONTRACT TO ENSURE UTILITY ADJUSTMENTS/RELOCATIONS ARE
SCHEDULED OR COMPLETE. THE CONTRACTOR SHALL COORDINATE WITH THE
UTILITY OWNERS THROUGHOUT THE DURATION OF THE PROJECT AND ENSURE
ALL POTENTIAL CONFLICTS ARE ADDRESSED SO AS NOT TO DELAY THE
PROJECT.
8. CONTACT THE LOCAL POWER COMPANTY FOR THEIR ASSISTANCE IN
PERFORMING ALL NECESSARY WORK IN CLOSE PROXIMITY TO POWER LINES AND
MEET ALL APPLICABLE OSHA AND NESC REQUIREMENTS REGARDING CLEARANCE
FROM POWER LINES AND EQUIPMENT GROUNDING. THE TYPE OF EQUIPMENT
USED WHEN WORKING UNDER OVERHEAD UTILITIES SHALL MEET THE
FOLLOWING REQUIREMENTS:
A. OVERHEAD LINES SHALL STAY IN PLACE BOTH VERTICALLY AND
HORIZONTALLY UNLESS NOT COMPLETED AS PART OF PRIOR AS PART OF
UTILITY COORDINATION.
B. ANY COSTS ASSOCIATED WITH THE TYPE OF EQUIPMENT AND
COORDINATION REQUIRED FOR THIS INSTALLATION IS INCLUDED IN THE
RELATED STRUCTURE OR DEVICE PAY ITEMS
C. WORK WITH POWER UTILITY TO DE-ENERGIZE LINES WHEN NECESSARY.
9. AT LOCATIONS WHERE UNDERGROUND UTILITIES ARE IN CLOSE PROXIMITY
TO THE DEVICE POLE. THE CONTRACTOR SHALL HAND DIG THE FIRST 48
INCHES OF THE HOLE FOR THE POLE FOUNDATIONS, OR THE CONDUIT RUN. NO
SEPARATE PAYMENT SHALL BE MADE FOR THIS WORK. THE COST TO PERFORM
THIS ACTIVITY SHALL BE INCLUDED IN THE ASSOCIATED COST OF THE
INSTALLED INFRASTRUCTURE.
Wesley Stanford \\vhb\gbl\proj\Orlando\63058.02 Park at Belcher Mast Arm\cad\te\eng\004183I\signals\004183I-GEN.dwg9/19/2022 8:36 AM v h b g b l p r o j O r l a n d o
P a r k a t
B e l c h e r
M a s t
A r m c a d t e e n g I s i g n a l s I G E N d w g
S e p a m
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006 Certificate of Authorization # 3932
T H E
O F F I C I A L
R E C O R D
O F
T H I S
S H E E T
I S
T H E
E L E C T R O N I C
F I L E
D I G I T A L L Y
S I G N E D
A N D
S E A L E D
U N D E R
R U L E
G
F A C
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S( D)
V
V
V
V
VDZ 6B 6'x20'
VDZ 6A 6'x20'
VDZ 6C 6'x20'
VDZ 1A 6'x25'
VDZ 5A 6'x25'
VDZ 2C 6'x20'
VDZ 2B 6'x20'
VDZ 2A 6'x20'
V D Z
A
'x
V D Z
B
'x
V D Z
C
'x
V D Z
B
'x
V D Z
A
'x
V D Z
B
'x
V D Z
A
'x
V D Z
C
'x
V D Z
B
'x
V D Z
A
'x
L-6C
L-6B
L-6A
L-2C
L-2B
L-2A
L-1A
L- 7B
L- 7A
L- 4C
L- 4B
L- 4A
L-5A
L-8 A
L-8 B
L-8 C
L-3 A
L-3 B
B
P2 P2 P8
P8 P6
P6 P4
P4
1079 1080 1081 1082 1083 1084 1085
N
1"
0'
\\vhb.com\gbl\proj\Orlando\63058.02 Park at Belcher Mast Arm\cad\te\eng\004183I\signals\004183I-SIG.dwgWesley Stanford 9/19/2022 8:31:36 AM v h b c o m g b l p r o j O r l a n d o
P a r k a t
B e l c h e r
M a s t
A r m c a d t e e n g I s i g n a l s I S I G d w g
S e p a m
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006 Certificate of Authorization # 3932
T H E
O F F I C I A L
R E C O R D
O F
T H I S
S H E E T
I S
T H E
E L E C T R O N I C
F I L E
D I G I T A L L Y
S I G N E D
A N D
S E A L E D
U N D E R
R U L E
G
F A
STANDARD MAST ARM ASSEMBLIES DATA TABLE
STRUCTURE
ID
NUMBERS
DESIGNATION
FIRST ARM SECOND ARM
UF
(deg)
LL
(deg)
POLE SPECIAL DRILLED SHAFT DATA
ARM ID
FAA
(ft.) ARM ID
FAA
(ft.)
POLE
TYPE
UAA
(ft.)
UB
(ft.)
UCA
(in.)
DA
(ft.)
DB
(ft.) RA RB RC
RD
(in.) RE
RF
(in.)
1 A78/S-P6/S A78/S P6/S 20.0 30.0 5.0 11 18 10 6 10 9
2 A70/S/H-P5/S A70/S/H P5/S 20.0 30.0 5.0 11 18 10 6 10 9
3 A60/S-P4/S A60/S P4/S 20.5 29.0 4.5 11 15 10 6 10 9
4 A78/S/H-P6/S A78/S/H P6/S 20.0 25.0 5.0 11 18 10 6 10 9
POLE 1:
SOIL FRICTION ANGLE = 29 DEGREES
SOIL WEIGHT = 43 PCF
N-VALUE (BLOWCOUNTS) = 5
POLE 2:
SOIL FRICTION ANGLE = 28 DEGREES
SOIL WEIGHT = 40 PCF
N-VALUE (BLOWCOUNTS) = 5
POLE 3:
SOIL FRICTION ANGLE = 28 DEGREES
SOIL WEIGHT = 40 PCF
N-VALUE (BLOWCOUNTS) = 5
POLE 4:
SOIL FRICTION ANGLE = 29 DEGREES
SOIL WEIGHT = 43 PCF
N-VALUE (BLOWCOUNTS) = 7
NOTES:
1. IF AN ENTRY APPEARS IN COLUMN FAA, A SHORTER ARM IS REQUIRED. THIS IS OBTAINED BY
REMOVING LENGTH FROM THE ARM TIP AND THE ARM LENGTH SHORTENED FROM FA TO FAA.
SAA SIMILAR.
2. IF AN ENTRY APPEARS IN COLUMN UAA, A SHORTER POLE IS REQUIRED. THIS IS OBTAINED BY
REMOVING LENGTH FROM THE POLE TIP AND THE POLE HEIGHT SHORTENED FROM UA TO UAA.
3. ARM MOUNTING HEIGHT UB MUST BE BETWEEN 18-22 FEET.
4. POLE TYPES P2 AND LARGER REQUIRE A MINIMUM 4.5 FOOT DIAMETER DRILLED SHAFT. POLE
TYPES P5 AND LARGER REQUIRE A MINIMUM 5.0 FOOT DIAMETER DRILLED SHAFT.
5. WORK THIS SHEET WITH THE SIGNAL DESIGNER'S "MAST ARM TABULATION". SEE "MAST ARM TABULATION" FOR SPECIAL INSTRUCTIONS THAT INCLUDE NON-STANDARD HANDHOLE LOCATIONS, PAINT COLOR, TERMINAL COMPARTMENT REQUIREMENT, AND PEDESTRIAN FEATURES.
6. WORK WITH INDEX 649-030 AND 649-031.
FOUNDATION NOTES:
1. DESIGN OF DRILLED SHAFT FOUNDATIONS IS BASED ON BORINGS TAKEN AND SEALED BY TIERRA, INC.
2. CONCRETE VOLUME OVERRUNS MAY OCCUR DURING THE SHAFT INSTALLATION PROCESS DUE TO THE
LOOSE CONDITIONS OF THE SANDY SOILS ENCOUNTERED WITHIN THE BORINGS.
3. TEMPORARY CASING SHALL BE UTILIZED FOR THE FULL DEPTH OF THE DRILLED SHAFT FOUNDATION
DURING SHAFT INSTALLATION AT ALL FOUR (4) POLE LOCATIONS.
4. THE FOLLOWING ASSUMPTIONS AND VALUES WERE USED IN DESIGN:
v h b c o m g b l p r o j O r l a n d o
P a r k a t
B e l c h e r
M a s t
A r m c a d t e e n g I s i g n a l s I P L D T S G d w g
S e p p m
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006 Certificate of Authorization # 3932
T H E
O F F I C I A L
R E C O R D
O F
T H I S
S H E E T
I S
T H E
E L E C T R O N I C
F I L E
D I G I T A L L Y
S I G N E D
A N D
S E A L E D
U N D E R
R U L E
G
F A
STATE OF
FLORIDA
P
A
T
R
I
C
K
M
C C
O
R
M
A
C
K
P r o f e s s i o n a l
S u r ve y o r a n d
M a p p e r
L i c e n s e
N u m b e r
1. Type of Survey: Topographic Survey
2. Field work completed on May 14, 2021 as recorded in Cumbey & Fair field book, CF Misc 156, Pages 28-33.
3. Bearings and coordinate values shown hereon are based on the Florida State Plane Coordinate System, West zone, North American Datum of 1983 (2011 Adjustment) using the FDOT Florida Permanent Reference Network with a MAX Solution.
4. Vertical control is based on control points "SKYVIEW K" and "409 FLHD" having elevations of 14.71' and 8.57' respectively. Said points are referenced to the North American Vertical Datum of 1988 (Adjusted).
5. This is not a boundary survey. Property line shown hereon is approximate and is based on the section tax maps, Plats, and official records of Pinellas County, Florida.
6. There may be additional easements and/or restrictions affecting these properties that may be found in the Public Records of this county.
7. Alignment shown hereon has not been field monumented and is shown graphically only.
8. This survey contains subsurface utilities physically exposed by vacuum excavation in accordance with Quality
Level A SUE investigation techniques. Electronically designated lines as depicted in the map of survey have been obtained by the use of electronic designating equipment and/or ground penetrating radar in accordance with Quality Level B SUE investigation techniques; these lines may deviate from the actual utility location and should be considered approximate.
9. Utility owner’s names used in this report reflect information obtained from field observations, field meetings, and utility research and may not reflect actual ownership.
10. Topographic features are limited to what is shown hereon.
11. Foundation encroachments, if any, were not investigated.
12. The intended display scale of maps shown hereon is 1" = 20' or 1:240. Attention is directed to the fact that these maps may have been altered in size by reproduction. Only use originals to obtain scaled data.
13. Additions or deletions to this report by other than the signing party or parties are prohibited without the written consent of the signing party or parties.
14. This Survey Report or copies thereof are not valid without the signature and the original raised seal of a Florida
Licensed Surveyor and Mapper.
SRL1
BEGIN STA 1079+80.24 N 1274934.756 E 417788.546
COURSE FROM STA 1079+80.24 TO STA 1085+80.24
S 89°43'52" E 600.00'
END STA 1085+80.24 N 1274931.941 E 418388.539
SRL2
BEGIN STA 30+00.00 N 1274633.403 E 418094.267
COURSE FROM STA 30+00.00 TO STA 36+00.00
N 01°05'36" W 600.00'
END STA 36+00.00 N 1275233.294 E 418082.818
Feet
1" = 20'
40200
2022.09.22 12:22:18-04'00'
Kenneth B Ray Digitally signed by Kenneth B Ray Date: 2022.09.22 15:17:01 -04'00'
Jared N Knight Digitally signed by Jared N Knight DN: CN=Jared N Knight, dnQualifier=A01410D0000017EB6AB99A7000589F9, Date: 2022.09.22 17:20:48-04'00'
UTILITY CONTACT PHONE NUMBER
CHARTER COMMUNICATIONS ARTURAS DUBINAS (727) 290-1509
CITY OF ST PETERSBURG-WATER/SEWER DALE ALBERTS (727) 892-5653
DUKE ENERGY FL DAVID MCNAMARA (727) 434-1461
FRONTIER COMMUNICATIONS STEPHENS GRANVILLE (727) 562-1190
MCI ANDREW COLE (813) 847-4037
PINELLAS COUNTY HWY/ENG JAMES JOHNSON (727) 464-8981
PINELLAS COUNTY UTILITIES-RECLAIM TREVOR SINGH (727) 464-3536
PINELLAS COUNTY UTILITIES-SEWER TREVOR SINGH (727) 464-3536
PINELLAS COUNTY UTILITIES-WATER TREVOR SINGH (727) 464-3536
TECO PEOPLES GAS-ST PETERSBURG BOLIVAR FELIX NUNEZ (810) 460 -8701
GOVERNING SPECIFICATIONS AND STANDARDS:
1. FLORIDA DEPARTMENT OF TRANSPORTATION DIVISION II AND III OF "STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", (JANUARY 2021) AND ALL
SUPPLEMENTAL SPECIFICATIONS THERETO. STANDARD SPECIFICATIONS ARE AVAILABLE
AT THE FOLLOWING WEBSITE:
HTTP://WWW.FDOT.GOV/PROGRAMMANAGEMENT/IMPLEMENTED/SPECBOOKS
2. FLORIDA DEPARTMENT OF TRANSPORTATION FY (2021-2022) STANDARD PLANS FOR
ROAD AND BRIDGE CONSTRUCTION AND APPLICABLE INTERIM REVISIONS (IRs). STANDARD PLANS FOR ROAD CONSTRUCTION AND IRs ARE AVAILABLE AT THE FOLLOWING WEBSITE:
HTTP://WWW.FDOT.GOV/DESIGN/STANDARDPLANS COMPLIANCE WITH ALL APPLICABLE
INDICES IS REQUIRED.
3. STATE OF FLORIDA "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN,
CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS", 2018 (FLORIDA
GREENBOOK)
HTTP://WWW.FDOT.GOV/ROADWAY/FLORIDAGREENBOOK/FGB.SHTM
PINELLAS COUNTY "STANDARD TECHNICAL SPECIFICATIONS FOR UTILITIES &
RELATED CONSTRUCTION" APRIL 2022 AVAILABLE ON-LINE:
HTTP://WWW.PINELLASCOUNTY.ORG/TECHNICAL/
5. PINELLAS COUNTY "STANDARD ENGINEERING DETAILS" FEBRUARY 2022 AVAILABLE
ON-LINE:HTTP://WWW.PINELLASCOUNTY.ORG/TECHNICAL/
6. PINELLAS COUNTY "TRAFFIC OPERATIONS SIGNAL STANDARDS" 2017.1 EDITION
AVAILABLE BY REQUEST
WHEN FDOT AND PINELLAS COUNTY SPECIFICATIONS DIFFER, PINELLAS COUNTY
SPECIFICATIONS SHALL TAKE PRECEDENCE IF PINELLAS COUNTY'S IS MORE STRINGENT
AS DETERMINED BY THE ENGINEER.
NOTIFICATIONS:
1. CONTACT PINELLAS COUNTY TRAFFIC ENGINEERING, (727-464-8922) PRIOR TO THE
BEGINNING OF WORK TO CHECK FOR UPDATES TO STANDARDS OR OTHER INFORMATION.
2. ONE WEEK PRIOR TO THE BEGINNING OF WORK, NOTIFY:
MR. JOHN LEMONIAS, PINELLAS COUNTY
22211 US 19 NORTH CLEARWATER, FL 33765 PHONE: (727) 420-6270 MR. VINCE HARPER,
PINELLAS COUNTY 22211 US HIGHWAY 19 NORTH
CLEARWATER, FL 33765
PHONE: (727) 410-6301
MR. WAYNE DEMPSEY
FDOT DISTRICT SEVEN TRAFFIC OPERATIONS
CONSTRUCTION LIAISON
FLORIDA DEPARTMENT OF TRANSPORTATION
11201 NORTH McKINLEY DRIVE
TAMPA, FLORIDA 33612
PHONE (813) 975-6226
3. GIVE THE ENGINEER A MINIMUM OF TWO FULL BUSINESS DAYS NOTICE PRIOR TO
FOUNDATION EXCAVATION FOR MAST ARMS FOR FINAL LOCATION APPROVAL.
4. OBTAIN LOCAL PERMITS TO WORK OUTSIDE THE FDOT AND COUNTY RIGHT OF WAY ON
LOCAL STREETS.
FIELD VERIFICATION AND ADJUSTMENTS:
1. ADJUST EQUIPMENT OR COMMUNICATION INFRASTRUCTURE FROM LOCATIONS SHOWN ON
THE PLANS WHEN NECESSARY DUE TO FIELD CONDITIONS AFTER APPROVAL FROM THE
ENGINEER. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE RECORDED
ON THE AS-BUILT PLANS AND TABULATION SHEETS.
GENERAL CONSTRUCTION:
1. RETURN ALL DISTURBED AREAS TO PRECONSTRUCTION CONDITIONS WITHIN 72
HOURS OF THE CONSTRUCTION ACTIVITY. THIS INCLUDES RESTORATION OF GRADE AND
SODDING FOR STABILIZATION AND WATERING OF THE SOD UNTIL IT HAS TAKEN ROOT.
2. FURNISH THE INSPECTOR AND PINELLAS COUNTY TRAFFIC SIGNAL SHOP THREE
COMPLETE SETS OF AS-BUILT PLANS, BORE LOGS AND RESISTANCE READINGS OF BOTH
LOOPS AND GROUND RODS PRIOR TO FINAL INSPECTION OF THE PROJECT. PLANS MUST
INCLUDE DEPTH AND OFFSET OF ALL CABLES INSTALLED. IN ADDITION, SUBMIT ONE SET
OF COMPLETE AS-BUILT PLANS TO BOTH FDOT DISTRICT SEVEN TRAFFIC OPERATIONS
AND FDOT PINELLAS MAINTENANCE. SEND A WRITTEN REQUEST TO PINELLAS COUNTY
TRAFFIC ENGINEERING TO TRANSFER MAINTENANCE FROM THE CONTRACTOR TO THE
COUNTY UPON PASSING THE FINAL INSPECTION.
3. IF SIDEWALK IS DAMAGED OR REMOVED DURING THE COURSE OF CONSTRUCTION,
THE CONTRACTOR SHALL REPLACE THE ENTIRE SIDEWALK SLAB FROM EXPANSION JOINT
TO EXPANSION JOINT AT THE CONTRACTOR'S EXPENSE. SIDEWALK DISTURBED DURING
CONSTRUCTION SHALL BE RESTORED WITHIN 72 HOURS.
4. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW FOR ALL EQUIPMENT AND
MATERIALS FURNISHED AND INSTALLED. FURNISH COPIES OF ALL DRAWINGS, SCHEDULES,
AND COMPLETE DESCRIPTIVE AND TECHNICAL DATA ON ALL ITEMS.
5. THE ACCEPTANCE OF ANY SUBMITTED DATA FOR MATERIALS, EQUIPMENT,
APPARATUS, DEVICES, ARRANGEMENTS, AND/OR LAYOUTS SHALL NOT RELIEVE THE
CONTRACTOR FROM THE RESPONSIBILITY OF PLACING PROPER DIMENSIONS, CAPACITIES,
SIZES, QUANTITIES, AND INSTALLATION DETAILS TO EFFICIENTLY PERFORM THE
REQUIREMENT AND INTENT OF THE CONTRACT. SUCH ACCEPTANCE SHALL NOT RELIEVE
THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS OR ANY SORT ON THE SUBMITTAL
FORM.
6. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FACT THAT ALL CONSTRUCTION
ACTIVITIES SHALL CONFORM TO PINELLAS COUNTY CODE CHAPTER 58, ENVIRONMENT,
ARTICLE XII - NOISE, SECTION 58-441 THROUGH 58-454.
7. ANY DAMAGE TO PINELLAS COUNTY OR FDOT INFRASTRUCTURE RESULTING FROM THE
PROPOSED DIRECTIONAL DRILLING MUST BE REPAIRED BY THE CONTRACTOR IMMEDIATELY
FOLLOWING THE DAMAGING EVENT AT THE CONTRACTOR'S EXPENSE.
SURVEY:
1. ALL SURVEY INFORMATION WAS OBTAINED FROM A LICENSED FLORIDA
PROFESSIONAL SURVEYOR AND MAPPER AND UTILIZED AS SUPPORTING DATA
IN THE PRODUCTION OF DESIGN PLANS AND FOR CONSTRUCTION ON SUBJECT
PROJECT. THE PROFESSIONAL SURVEYOR AND MAPPER OF RECORD IS:
PATRICK MCCORMACK, P.S.M.
P.S.M. NO.: 6494
COMPANY NAME: CUMBEY & FAIR INC.
COMPANY ADDRESS: 2463 ENTERPRISE ROAD
CLEARWATER, FLORIDA 33763
LICENSED BUSINESS: 2168
WORK SUPERVISION
1. AN I.M.S.A. CERTIFIED LEVEL II (ELECTRONICS OR ELECTRICAL)
TECHNICIAN ON THE JOB SITE AT ALL TIMES WHEN WORKING WITHIN THE
TRAFFIC SIGNAL CONTROLLER CABINET, SIGNAL POLES OR MAST ARM
ASSEMBLIES.
2. RESPOND TO CALLS TWENTY-FOUR HOURS A DAY, SEVEN DAYS A WEEK.
WITHIN THREE HOURS OF NOTIFICATION OR DOCUMENTED ATTEMPTED
NOTIFICATION, THE CONTRACTOR SHALL BE ON-SITE MAKING NEEDED REPAIRS
OR MODIFICATIONS. FAILURE TO MEET THE TIME REQUIREMENTS GIVES THE
COUNTY, AT THEIR DISCRETION, THE RIGHT TO REQUEST ASSISTANCE FROM
LOCAL LAW ENFORCEMENT TO CONTROL TRAFFIC FOR THE PERIOD OF TIME
UNTIL THE CONTRACTOR RESPONDS AND MAKES NEEDED REPAIRS. THE COST
FOR LAW ENFORCEMENT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
THE COUNTY, AT THEIR DISCRETION, ALSO HAS THE RIGHT TO BRING IN
ASSISTANCE TO MAKE NEEDED REPAIRS AND BE REIMBURSED BY THE
CONTRACTOR, IF THE CONTRACTOR CANNOT MEET THE TIME REQUIREMENTS.
3. A SUPERINTENDENT FOR THE PRIME CONTRACTOR IS REQUIRED TO BE ON
SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. ALL WORKERS ON THE
JOB SITE WILL BE COURTEOUS TO THE PUBLIC AT ALL TIMES AND SHALL
REFER ANY QUESTIONS OR CONCERNS TO THE CONTRACTOR'S SUPERINTENDENT
OR THE COUNTY INSPECTOR. THE SUPERINTENDENT SHALL SPEAK AND
UNDERSTAND ENGLISH AND SHALL BE AVAILABLE AT ALL TIMES FOR TIMELY
RESOLUTION OF PROJECT RELATED ISSUES. PROVIDE A 24 HOUR EMERGENCY
PHONE NUMBER TO THE COUNTY INSPECTOR.
MAST ARM
1. PROVIDE FOUR (4) 2" CONDUITS INTO THE MAST ARM UPRIGHTS.
2. ALL SIGNAL ASSEMBLIES ON THE MAST ARM SHALL HAVE A VERTICAL
CLEARANCE OF 17.5' (MINIMUM) TO 19' (MAXIMUM) FROM THE BOTTOM OF THE
ASSEMBLY TO THE HIGHEST POINT OF THE ROAD BENEATH.
3. THERE ARE MAST ARM LOCATIONS ADJACENT TO RIGHT OF WAY.
CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO NOT ENCROACH OUTSIDE OF
RIGHT OF WAY AT ANY TIME DURING CONSTRUCTION WHERE EASEMENTS ARE
NOT PRESENT.
TRAFFIC CONTROL/EQUIPMENT
1. DURING CONSTRUCTION ALL EXISTING SIGNALIZATION SHALL REMAIN IN
PLACE, INCLUDING VEHICLE ACTUATION AND PEDESTRIAN SIGNAL OPERATION.
ALL ACTUATED PHASES SHALL BE MAINTAINED DURING THE PROJECT,
INCLUDING WHEN LOOPS OR OTHER DETECTION DEVICES ARE DAMAGED. THE
USE OF MICROWAVE DETECTORS OR THE INSTALLATION OF NEW LOOPS WITHIN
48 HOURS OF DAMAGE SHALL BE MADE FOR FULL DETECTOR ACTUATION UNTIL
THE PROPOSED VIDEO DETECTION IS ACTIVATED.
2. UNLESS OTHERWISE NOTED, ALL REMOVED AND SURPLUS EQUIPMENT
SHALL BE DELIVERED TO THE PINELLAS COUNTY TRAFFIC SIGNAL SHOP,
BETWEEN 6:30 AM AND 4:30 PM MONDAY THRU THURSDAY, LOCATED AT 22211
US 19 NORTH, CLEARWATER, FL 33765. PROVIDE A MINIMUM FORTY-EIGHT
HOURS NOTICE PRIOR TO DELIVERY. THE CONTACT PHONE NUMBER IS (727)
464-8922.
3. THROUGHOUT THE ENTIRE PROJECT, MAINTAIN COMMUNICATIONS BETWEEN
THE COMPUTERIZED SIGNAL SYSTEM, THE INTERSECTION AND ADJACENT
INTERSECTIONS (WHERE APPLICABLE) VIA DEDICATED TELEPHONE LINES
AND/OR INTERCONNECT CABLE AND BE RESPONSIBLE FOR ANY ADDITIONAL
COST RELATED TO MAINTAIN THE COMMUNICATIONS. CONTACT PINELLAS COUNTY
TRAFFIC ENGINEERING ONE WEEK PRIOR TO ANY WORK WHICH MAY CAUSE
DISRUPTION OF COMMUNICATIONS.
4. WHEN CONTRACTOR IS WORKING ON A SIGNAL IN AN INTERSECTION
(INSTALLING CONDUIT IN THE STREET, REMOVING EXISTING SIGNAL
EQUIPMENT, INSTALLING NEW SIGNAL EQUIPMENT, LOOPS AND RUNS, OR
TURNING ON A NEW SIGNAL) WHERE A LANE IS CLOSED, THE PROJECT
ENGINEER MAY REQUIRE AN OFF-DUTY LAW ENFORCEMENT OFFICER TO DIRECT
TRAFFIC. THE CONTRACTOR SHALL PROVIDE AN OFF-DUTY LAW ENFORCEMENT
OFFICER WHEN REQUIRED BY THE ENGINEER OR BY PERMIT. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL COSTS FOR THE OFFICER. THE HOURLY RATE
OF PAY FOR AN OFF-DUTY LAW ENFORCEMENT OFFICER CAN BE OBTAINED
FROM THE LOCAL LAW ENFORCEMENT OFFICE.
5. VIDEO VEHICLE DETECTION SYSTEM SHALL BE COMPATIBLE WITH THE
TRAFFIC CONTROLLER SYSTEM SPECIFIED IN PINELLAS COUNTY ROAD AND
BRIDGE SPECIFICATIONS.
LOOPS
1. INDUCTIVE LOOPS SHALL BE 6'X20' AND 2' BEHIND STOP BARS FOR MAIN
STREET THROUGH MOVEMENTS AND 6'X25' AND 2' IN FRONT OF STOP BARS FOR
ALL LEFT TURNS AND SIDE STREET MOVEMENTS.
POWER SERVICE:
1. DISCONNECTS SHALL INCLUDE FDOT APPROVED SURGE ARRESTORS.
PAY ITEM NOTES:
1. 110-0100: CLEAR AND GRUBBING SHALL INCLUDE REMOVAL OF CONCRETE.
2. 102-1000: SHALL INCLUDE THE COST FOR ALL TRAFFIC CONTROL RELATED
PAY ITEMS INCLUDING THOSE REQUIRED BY THE FDOT STANDARD PLANS
INDEX 102 SERIES. THIS PAY ITEM SHALL ALSO INCLUDE ALL COSTS TO
MAINTAIN ALL TRAFFIC SIGNALIZATION INCLUDING VEHICLE ACTUATION AND
PEDESTRIAN SIGNAL OPERATIONS, UNLESS OTHERWISE SHOWN IN THE PLANS.
3. 102-14: INCLUDES COST FOR OFF DUTY LAW ENFORCEMENT OFFICER
PROVIDED BY THE CONTRACTOR IN ACCORDANCE WITH TRAFFIC CONTROL
EQUIPMENT NOTES THAT ARE NOT SPECIFICALLY CALLED OUT IN THE TRAFFIC
CONTROL PLANS.
4. 630-2-11, 630-2-12: NO TEST BORINGS WERE MADE WHERE CONDUIT
RUNS ARE TO BE INSTALLED. ALL CONDUIT RUNS SHOWN ON THE PLANS ARE
SCHEMATIC AND FIELD ADJUSTMENTS MAY BE NECESSARY. A LOCATE WIRE
SHALL BE INSTALLED FOR LOCATION OF ALL FIBER OPTIC CABLES. ALL LOCATE
WIRE SHALL BE NO. 12 AWG STRANDED AND MEET FDOT SPECIFICATIONS. A
PULL TAPE SHALL BE INSTALLED IN EACH CONDUIT. AT LEAST THREE FEET OF
PULL TAPE SHALL BE ACCESSIBLE AT EACH CONDUIT TERMINATION AND SHALL
BE SECURED WITHIN THE PULL BOX OR PLACE OF TERMINATION. PAYMENT
SHALL BE BASED PER LINEAR FOOT OF CONDUIT AND INCLUDE LOCATE WIRE
AND PULL TAPE.
5. 660-4-11, 660-4-12: THE VIDEO DETECTION CAMERA SYSTEM SHALL BE
ECONOLITE AUTOSCOPE VISION. INCLUDE AN AUTOSCOPE COMM MANAGER AS
PART OF THE SYSTEM. COORDINATE WITH THE COUNTY TO ENSURE SOFTWARE
AND FIRMWARE COMPATIBILITY.
6. 663-1-111, 663-1-112: THE OPTICAL PREEMPTION SYSTEM SHALL
CONSIST OF OPTICOM MODEL 711 OVERHEAD DETECTORS AND A MODEL 764
PHASE SELECTOR.
7. 685-1-13: THE UPS SHALL BE A MYERS 2000E INSTALLED IN A SEPARATE
CABINET ON THE CONTROLLER BASE AS PER COUNTY STANDARDS.
8. 670-5-112: PROVIDE CONTROLLER ASSEMBLY FULLY FIBER READY AND
COMPATIBLE WITH ALL PINELLAS COUNTY REQUIREMENTS FOR INTEGRATION INTO THE
COUNTY SYSTEM. THE CONTROLLER SHALL BE AN ECONOLITE COBALT.
9. 522-2: INCLUDES ALL NECESSARY GRADING REQUIRED FOR CONCRETE
CONSTRUCTION.
10. 684-6-13: PAY ITEM INCLUDES FURNISH AND INSTALLATION OF PINELLAS
COUNTY APPROVED CELLULAR MODEM. PAY ITEM INCLUDES INTEGRATION AND
TESTING OF CELLULAR MODEM. CELLULAR DEVICES MUST BE COMPATIBLE WITH
CELLULAR CARRIER USED BY PINELLAS COUNTY.
UTILITIES:
1. THE LOCATION OF UTILITIES SHOWN IN THE PLANS IS APPROXIMATE. THE
EXACT LOCATION SHALL BE DETERMINED BY THE CONTRACTOR, AT HIS
EXPENSE AND IN COORDINATION WITH UNDERGROUND AND OVERHEAD UTILITY
OWNERS PRIOR TO DIGGING OR ANY DIRECTIONAL BORE EFFORTS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY NOTIFICATIONS AND
COORDINATION WITH UTILITY OWNERS FOR ANY ADJUSTMENTS THAT MAY BE
NECESSARY TO RESOLVE ANY CONFLICTS THAT MAY ARISE BETWEEN THE
CONTRACTOR'S ACTIVITIES AND EXISTING UTILITY LOCATIONS. A CONTRACTOR'S
REPRESENTATIVE SHALL BE PRESENT WHEN THE UTILITY OWNERS LOCATE
THEIR FACILITIES. NOTIFY THE APPROPRIATE UTILITY OWNERS AT LEAST
72-HOURS IN ADVANCE OF FOUNDATION OR POLE SETTING OPERATIONS WHERE
CONFLICT WITH OVERHEAD OR UNDERGROUND UTILITIES IS POSSIBLE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING UTILITIES
DURING CONSTRUCTION. THE COSTS ASSOCIATED WITH UTILITY COORDINATION
AND UTILITY LOCATING SHALL BE INCLUDED IN MOBILIZATION.
2. PERFORM SUBSURFACE UTILITY ENGINEERING (SUE) AT EACH
FOUNDATION. THE SUE EFFORT SHALL BE QUALITY LEVEL A. THE COST TO
PERFORM THIS ACTIVITY SHALL BE INCLUDED IN THE MAST ARM PAY ITEM.
3. FDOT DOES NOT LOCATE THEIR DRAINAGE STRUCTURES AS PART OF
SUNSHINE ONE CALL. VERIFY EXISTING UNDERDRAIN AT STORM STRUCTURES
WITH FDOT MAINTENANCE PERSONNEL. MAINTAIN A MINIMUM OF TWO-FOOT
CLEARANCE FROM THE UNDERDRAIN FILTER MATERIAL, PARALLEL AND
CROSSING.
4. ALL INFRASTRUCTURE INSTALLED WITHIN THE RIGHT-OF-WAY SHALL BE
IN ACCORDANCE WITH PRACTICES REFERENCED IN THE LATEST FDOT UTILITY
ACCOMMODATIONS MANUAL.
5. CONTACT THE POWER UTILITY PROVIDING ELECTRICAL SERVICE TO
DETERMINE IF A SERVICE PROCESSING FEE OR SPECIAL IMPACT CONNECTION
FEES ARE CHARGED BY THE UTILITY FOR ELECTRICAL SERVICE CONNECTION.
6. AS PART OF THE PAYMENT FOR ELECTRICAL POWER SERVICE ASSEMBLY,
OBTAIN A PERMIT AND INSPECTION OF THE ELECTRICAL SERVICE. ALL PERMIT
FEES SHALL BE INCLUDED IN THE POWER SERVICE ASSEMBLY COST. THE
METER BASE SHALL INCLUDE A BYPASS HANDLE TO ALLOW CONTINUOUS
VOLTAGE UNDER METER CHANGE OUT.
7. ALL UTILITIES IDENTIFIED IN A UTILITY RELOCATION SCHEDULE
INTERFERING WITH CONSTRUCTION WILL BE REMOVED, RELOCATED, OR
ADJUSTED BY THEIR RESPECTIVE OWNER AT THEIR EXPENSE. THE
CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNERS UPON AWARD OF
THE CONTRACT TO ENSURE UTILITY ADJUSTMENTS/RELOCATIONS ARE
SCHEDULED OR COMPLETE. THE CONTRACTOR SHALL COORDINATE WITH THE
UTILITY OWNERS THROUGHOUT THE DURATION OF THE PROJECT AND ENSURE
ALL POTENTIAL CONFLICTS ARE ADDRESSED SO AS NOT TO DELAY THE
PROJECT.
8. CONTACT THE LOCAL POWER COMPANTY FOR THEIR ASSISTANCE IN
PERFORMING ALL NECESSARY WORK IN CLOSE PROXIMITY TO POWER LINES AND
MEET ALL APPLICABLE OSHA AND NESC REQUIREMENTS REGARDING CLEARANCE
FROM POWER LINES AND EQUIPMENT GROUNDING. THE TYPE OF EQUIPMENT
USED WHEN WORKING UNDER OVERHEAD UTILITIES SHALL MEET THE
FOLLOWING REQUIREMENTS:
A. OVERHEAD LINES SHALL STAY IN PLACE BOTH VERTICALLY AND
HORIZONTALLY UNLESS NOT COMPLETED AS PART OF PRIOR AS PART OF
UTILITY COORDINATION.
B. ANY COSTS ASSOCIATED WITH THE TYPE OF EQUIPMENT AND
COORDINATION REQUIRED FOR THIS INSTALLATION IS INCLUDED IN THE
RELATED STRUCTURE OR DEVICE PAY ITEMS
C. WORK WITH POWER UTILITY TO DE-ENERGIZE LINES WHEN NECESSARY.
9. AT LOCATIONS WHERE UNDERGROUND UTILITIES ARE IN CLOSE PROXIMITY
TO THE DEVICE POLE. THE CONTRACTOR SHALL HAND DIG THE FIRST 48
INCHES OF THE HOLE FOR THE POLE FOUNDATIONS, OR THE CONDUIT RUN. NO
SEPARATE PAYMENT SHALL BE MADE FOR THIS WORK. THE COST TO PERFORM
THIS ACTIVITY SHALL BE INCLUDED IN THE ASSOCIATED COST OF THE
INSTALLED INFRASTRUCTURE.
v h b c o m g b l p r o j O r l a n d o t h a t t h
M a s t
A r m c a d t e e n g H s i g n a l s H G E N d w g
S e p a m
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006 Certificate of Authorization # 3932
T H E
O F F I C I A L
R E C O R D
O F
T H I S
S H E E T
I S
T H E
E L E C T R O N I C
F I L E
D I G I T A L L Y
S I G N E D
A N D
S E A L E D
U N D E R
R U L E
G
F A C
Wesley Stanford \\vhb.com\gbl\proj\Orlando\63058.03 54th at 58th Mast Arm\cad\te\eng\004183H\signals\004183H-GEN.dwg9/19/2022 8:45 AM
FLORIDA
P
A
T
R
I
C
K
M
C C
O
R
M
A
C
K
P r o f e s s i o n a l
S u r ve y o r a n d
M a p p e r
L i c e n s e
N u m b
2. Field work completed on May 03, 2021 as recorded in Cumbey & Fair field book, CF Misc, Pages 16-23.
3. Bearings and coordinate values shown hereon are based on the Florida State Plane Coordinate System, West zone, North American Datum of 1983 (2011 Adjustment) using the FDOT Florida Permanent Reference Network with a MAX Solution.
4. Vertical control is based on control points "SEVEN M" and "323 FLHD" having elevations of 16.46' and 11.56' respectively. Said points are referenced to the North American Vertical Datum of 1988 (Adjusted).
5. This is not a boundary survey. Property line shown hereon is approximate and is based on the section tax maps, Plats, and Official Records of Pinellas County, Florida.
6. There may be additional easements and/or restrictions affecting these properties that may be found in the Public Records of this county.
7. Alignment shown hereon has not been field monumented and is shown graphically only.
8. This survey contains subsurface utilities physically exposed by vacuum excavation in accordance with Quality
Level A SUE investigation techniques. Electronically designated lines as depicted in the map of survey have been obtained by the use of electronic designating equipment and/or ground penetrating radar in accordance with Quality Level B SUE investigation techniques; these lines may deviate from the actual utility location and should be considered approximate.
9. Utility owner’s names used in this report reflect information obtained from field observations, field meetings, and utility research and may not reflect actual ownership.
10. Topographic features are limited to what is shown hereon.
11. Foundation encroachments, if any, were not investigated.
12. The intended display scale of maps shown hereon is 1" = 20' or 1:240. Attention is directed to the fact that these maps may have been altered in size by reproduction. Only use originals to obtain scaled data.
13. Additions or deletions to this report by other than the signing party or parties are prohibited without the written consent of the signing party or parties.
14. This Survey Report or copies thereof are not valid without the signature and the original raised seal of a Florida
Licensed Surveyor and Mapper.
SRL1
BEGIN STA 50+00.00 N 1268303.5480 E 425639.1550
COURSE FROM STA 50+00.00 TO STA 53+00.00
S 89°52'23" E 300.00'
STA 53+00.00 N 1268302.8840 E 425939.1540
COURSE FROM STA 53+00.00 TO STA 56+00.00
S 89°43'41" E 300.00'
END STA 56+00.00 N 1268301.4610 E 426239.1510
SRL2
BEGIN STA 30+00.00 N 1268002.8880 E 425937.7740
COURSE FROM STA 30+00.00 TO STA 33+00.00
N 00°15'49" E 300.00'
STA 33+00.00 N 1268302.8840 E 425939.1540
COURSE FROM STA 33+00.00 TO STA 36+00.00
N 00°03'23" W 300.00'
STA 36+00.00 N 1268602.884 E 425938.8580
40200
2022.09.22 12:23:10-04'00'
Kenneth B Ray Digitally signed by Kenneth B Ray Date: 2022.09.22 15:39:07 -04'00'
Jared N Knight Digitally signed by Jared N Knight DN: CN=Jared N Knight, dnQualifier=A01410D0000017EB6AB99A7000589F9, Date: 2022.09.22 17:22:51-04'00'
TABULATION OF QUANTITIES
PAY
ITEM
NO.
DESCRIPTION UNIT
SHEET NUMBERS TOTAL
THIS
SHEET
GRAND
TOTALTC-5 TC-6 TC-8
PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL
005-701 SURVEY, CONSTRUCTION LAYOUT LS 1
101-0100 MOBILIZATION LS 1
102-14 TRAFFIC CONTROL OFFICER HR 16
102-1000 MAINTENANCE OF TRAFFIC LS 1
104-10 PREVENTION, CONTROL AND ABATEMENT OF EROSION & WATER POLLUTION LS 1
104-18 INLET PROTECTION SYSTEMS EA 1 1 1
110-0100 CLEARING & GRUBBING LS 1
120-1100 GRADING LS 1 1 1
520-1-10 CONCRETE CURB & GUTTER, TYPE F LF 14 14 14
522-2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK SY 3 34.0 37.0 37.0
527-2 DETECTABLE WARNINGS SF 33.5 33.5 34
570-1-2 PERFORMANCE TURF, SOD SY 20 15.6 35.6 36
630-2-11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH LF 87 87 87
630-2-12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 413 413 413
632-7-1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 1 1 1
635-2-14 PULL & SPLICE BOX, F&I, 17" X 30" COVER SIZE EA 13 13 13
639-1-122 ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER PURCHASED BY CONTRACTOR AS 1 1 1
639-1-610 ELECTRICAL POWER SERVICE, REMOVE OVERHEAD AS 1 1 1
639-2-1 ELECTRICAL SERVICE WIRE, FURNISH & INSTALL LF 141 141 141
641-2-12 PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE EA 1 1 1
641-2-70 PRESTRESSED CONCRETE POLE, SHALLOW POLE REMOVAL- POLE 30' AND GREATER EA 2 2 2
643-600 STRAIN POLE, WOOD, REMOVE EA 1 1 1
646-1-11 ALUMINUM SIGNALS POLE, PEDESTAL EA 5 5 5
646-1-60 ALUMINUM SIGNALS POLE, REMOVE EA 1 1 1
649-21-13 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 60'-50' EA 1 1 1
649-21-23 STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 78'-40' EA 1 1 1
650-1-14 VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 3 SECTION, 1 WAY AS 8 8 8
650-1-16 VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 4 SECTION, 1 WAY AS 4 4 4
653-1-11 PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 1 WAY AS 2 2 2
653-1-12 PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 2 WAYS AS 3 3 3
660-1-110 LOOP DETECTOR INDUCTIVE, F&I, TYPE 10 EA 5 5 5
660-2-101 LOOP ASSEMBLY- F&I, TYPE A AS 10 10 10
660-4-11 VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL CABINET EQUIPMENT EA 1 1 1
660-4-12 VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL ABOVE GROUND EQUIPMENT EA 4 4 4
663-1-111 SIGNAL PRIORITY AND PREEMPTION SYSTEM, F&I, OPTICAL, CABINET ELECTRONICS EA 1 1 1
663-1-112 SIGNAL PRIORITY AND PREEMPTION SYSTEM, F&I, OPTICAL, DETECTOR EA 4 4 4
665-1-11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD EA 8 8 8
670-5-112 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA, 2 PREEMPTS AS 1 1 1
670-5-600 TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET AS 1 1 1
684-1-1 MANAGED FIELD ETHERNET SWITCH, FURNISH & INSTALL EA 1 1 1
684-6-13 WIRELESS COMMUNICATION DEVICE, FURNISH & INSTALL SERIAL DATA UNIT EA 1 1 1
685-1-13 UNINTERRUPTIBLE POWER SUPPLY, FURNISH AND INSTALL, LINE INTERACTIVE WITH CABINET EA 1 1 1
700-1-50 SINGLE POST SIGN, RELOCATE AS 2 2 2
700-5-22 INTERNALLY ILLUMINATED SIGN, FURNISH & INSTALL, OVERHEAD MOUNT, 12-18 SF EA 4 4 4
711-11-123 THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT LF 131 131 131
711-11-125 THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK LF 136 136 136
711-17-1 THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS - SURFACE TO REMAIN SF 96 96 96 v h b c o m g b l p r o j O r l a n d o t h a t n d
M a s t
A r m c a d t e e n g C s i g n a l s C T A B Q S G d w g
S e p p m
Engineers | Scientists Planners | Designers 225 E. Robinson Street, Suite 300 Orlando, FL 32801 (407)839-4006 Certificate of Authorization # 3932
T H E
O F F I C I A L
R E C O R D
O F
T H I S
S H E E T
I S
T H E
E L E C T R O N I C
F I L E
D I G I T A L L Y
S I G N E D
A N D
S E A L E D
U N D E R
R U L E
G
F A
CHARTER COMMUNICATIONS ARTURAS DUBINAS (727) 290-1509
CITY OF PINELLAS PARK BRUCE CANFIELD (727) 369-5722
CITY OF ST. PETERSBURG-WATER/SEWER DALE ALBERTS (727) 892-5653
DUKE ENERGY FL KELLY BERRY (727) 418-8816
FRONTIER COMMUNICATIONS STEPHENS GRANVILLE (813) 486-4650
WOW! DAVE HAMLIN (678) 409-8721
MCI ANDREW COLE (813) 847-4037
PINELLAS COUNTY HWY/ENG JAMES JOHNSON (727) 464-8981
PINELLAS COUNTY UTILITIES-RECLAIM TREVOR SINGH (727) 464-3536
PINELLAS COUNTY UTILITIES-SEWER TREVOR SINGH (727) 464-3536
PINELLAS COUNTY UTILITIES-WATER TREVOR SINGH (727) 464-3536
TECO PEOPLES GAS-ST. PETERSBURG BOLIVAR FELIX NUNEZ (813) 460-8701
UNITI FIBER TERRY YOUNG (251) 422-3872
ZAYO TESS BENTAYOU (813) 363-6797
GOVERNING SPECIFICATIONS AND STANDARDS:
1. FLORIDA DEPARTMENT OF TRANSPORTATION DIVISION II AND III OF "STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", (JANUARY 2021) AND ALL
SUPPLEMENTAL SPECIFICATIONS THERETO. STANDARD SPECIFICATIONS ARE AVAILABLE
AT THE FOLLOWING WEBSITE:
HTTP://WWW.FDOT.GOV/PROGRAMMANAGEMENT/IMPLEMENTED/SPECBOOKS
2. FLORIDA DEPARTMENT OF TRANSPORTATION FY (2021-2022) STANDARD PLANS FOR
ROAD AND BRIDGE CONSTRUCTION AND APPLICABLE INTERIM REVISIONS (IRs). STANDARD PLANS FOR ROAD CONSTRUCTION AND IRs ARE AVAILABLE AT THE FOLLOWING WEBSITE:
HTTP://WWW.FDOT.GOV/DESIGN/STANDARDPLANS COMPLIANCE WITH ALL APPLICABLE
INDICES IS REQUIRED.
3. STATE OF FLORIDA "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN,
CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS", 2018 (FLORIDA
GREENBOOK)
HTTP://WWW.FDOT.GOV/ROADWAY/FLORIDAGREENBOOK/FGB.SHTM
PINELLAS COUNTY "STANDARD TECHNICAL SPECIFICATIONS FOR UTILITIES &
RELATED CONSTRUCTION" APRIL 2022 AVAILABLE ON-LINE:
HTTP://WWW.PINELLASCOUNTY.ORG/TECHNICAL/
5. PINELLAS COUNTY "STANDARD ENGINEERING DETAILS" FEBRUARY 2022 AVAILABLE
ON-LINE:HTTP://WWW.PINELLASCOUNTY.ORG/TECHNICAL/
6. PINELLAS COUNTY "TRAFFIC OPERATIONS SIGNAL STANDARDS" 2017.1 EDITION
AVAILABLE BY REQUEST
WHEN FDOT AND PINELLAS COUNTY SPECIFICATIONS DIFFER, PINELLAS COUNTY
SPECIFICATIONS SHALL TAKE PRECEDENCE IF PINELLAS COUNTY'S IS MORE STRINGENT
AS DETERMINED BY THE ENGINEER.
NOTIFICATIONS:
1. CONTACT PINELLAS COUNTY TRAFFIC ENGINEERING, (727-464-8922) PRIOR TO THE
BEGINNING OF WORK TO CHECK FOR UPDATES TO STANDARDS OR OTHER INFORMATION.
2. ONE WEEK PRIOR TO THE BEGINNING OF WORK, NOTIFY:
MR. JOHN LEMONIAS, PINELLAS COUNTY
22211 US 19 NORTH CLEARWATER, FL 33765 PHONE: (727) 420-6270 MR. VINCE HARPER,
PINELLAS COUNTY 22211 US HIGHWAY 19 NORTH
CLEARWATER, FL 33765
PHONE: (727) 410-6301
MR. WAYNE DEMPSEY
FDOT DISTRICT SEVEN TRAFFIC OPERATIONS
CONSTRUCTION LIAISON
FLORIDA DEPARTMENT OF TRANSPORTATION
11201 NORTH McKINLEY DRIVE
TAMPA, FLORIDA 33612
PHONE (813) 975-6226
3. GIVE THE ENGINEER A MINIMUM OF TWO FULL BUSINESS DAYS NOTICE PRIOR TO
FOUNDATION EXCAVATION FOR MAST ARMS FOR FINAL LOCATION APPROVAL.
4. OBTAIN LOCAL PERMITS TO WORK OUTSIDE THE FDOT AND COUNTY RIGHT OF WAY ON
LOCAL STREETS.
FIELD VERIFICATION AND ADJUSTMENTS:
1. ADJUST EQUIPMENT OR COMMUNICATION INFRASTRUCTURE FROM LOCATIONS SHOWN ON
THE PLANS WHEN NECESSARY DUE TO FIELD CONDITIONS AFTER APPROVAL FROM THE
ENGINEER. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE RECORDED
ON THE AS-BUILT PLANS AND TABULATION SHEETS.
GENERAL CONSTRUCTION:
1. RETURN ALL DISTURBED AREAS TO PRECONSTRUCTION CONDITIONS WITHIN 72
HOURS OF THE CONSTRUCTION ACTIVITY. THIS INCLUDES RESTORATION OF GRADE AND
SODDING FOR STABILIZATION AND WATERING OF THE SOD UNTIL IT HAS TAKEN ROOT.
2. FURNISH THE INSPECTOR AND PINELLAS COUNTY TRAFFIC SIGNAL SHOP THREE
COMPLETE SETS OF AS-BUILT PLANS, BORE LOGS AND RESISTANCE READINGS OF BOTH
LOOPS AND GROUND RODS PRIOR TO FINAL INSPECTION OF THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .