This document is an Appendix 1 Permits Index for the Pinellas County "Countywide Mast Arms - Group 2" infrastructure project, specifically addressing permit requirements for P.I.D. No. 004183A and related project identification numbers. The permits index details four key permit categories to be obtained for the project: Pinellas County Habitat Management Permit, Dewatering Permit, National Pollutant Discharge Elimination System (NPDES) Permit, and Local Building Permits. These permits will be issued to the contractor either following the preconstruction meeting or as directed by the County.
The permit index indicates that three of the four permit types (Habitat Management, Dewatering, and NPDES) will be issued at no permit charge, while Local Building Permits for electrical service connections will have fees dependent on the local jurisdiction. The permits are specifically associated with a project involving signalization infrastructure improvements at four intersections, which include replacing existing signalization with mast arms and making improvements to meet ADA guidelines. The permits appear to be an essential administrative requirement to ensure regulatory compliance and environmental considerations are addressed before and during the construction phase of the project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1
PERMITS
P.I.D. NO. 004183A
PID Nos. 003876A, 004183C, 004183H, 004183I
Countywide Mast Arms – Group 2
PERMIT INDEX
Agency Permit Permit Fee Pinellas County Habitat Management Permit
Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County
No permit charge
Dewatering Permit Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County
No permit charge
National Pollutant Discharge Elimination System (NPDES) Permit
Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County
No permit charge
Local Building Permits Issued to Contractor for electrical service connections by local jurisdiction upon submittal of permit application
Dependent upon local jurisdiction
File details come from the government source that posted it. Updated .