Appendix_6-004183I-UWS-004183A_Group_2.pdf
PDF 1 MB Posted
- Attached to
- Countywide Mast Arms - Group 2
- Solicitation number
- 23-0211-ITB-CP
- Issued by
- Pinellas County, Florida
About this file
The document is a Utility Work Schedule (UWS) for Pinellas County's Signalization Plans project at Park Boulevard and Belcher Road, involving multiple utility agencies including Duke Energy, Pinellas County Utilities, Spectrum, Knology Broadband (WOW!), MCI Metro Access, and Uniti Fiber/Southern Light. The project involves utility facility relocations, adjustments, and protections related to signalization improvements, with each utility agency detailing their specific work activities such as adjusting overhead conductors, relocating conduits, and coordinating pole and equipment modifications to accommodate new mast arm installations.
The utility work schedule outlines estimated calendar days for non-construction and construction items, with most agencies requiring between 0-30 calendar days for right-of-way permitting and utility work. Each utility agency has specific conditions and constraints, such as maintaining existing facilities, providing advance notice before construction, working during standard business hours, and coordinating with other utility providers. The project is based on Pinellas County's final design phase construction plans dated 10/11/2021, with the understanding that any significant deviations may require reassessment and negotiation of the work schedule. The documents are signed and dated by utility representatives, engineers of record, and Pinellas County representatives between November 2019 and September 2022.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 4 PINELLAS COUNTY 11/19//2019
UTILITY WORK SCHEDULE
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Duke Energy - Distribution
A. Summary of Utility Work and Execution
NON-CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
Total Preliminary 10 Prior to Pinellas County Project Construction 48 Total Material Procurement 10 During Pinellas County Project Construction 16 Total Right-of-Way Permitting 30 Total NON-Construction Time 50 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.
The following data is based on Pinellas County final design phase construction plans dated 10/11/2021. Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.
UAO Project Representative: Carter Williams Telephone Number: 727-348-8384 UAO Field Representative: Carter Williams Telephone Number: 727-348-8384
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:
(Signature) (Signature) (Signature)
Carter Williams Tim Messina (Printed Name) (Printed Name) (Printed Name)
Engineer III Utility Coordinator (Title) (Title) (Title)
3/23/2022 (Date) (Date) (Date)
Authorized Utility Ag
(Signature)
C t Willi Jared Knight
Transportation Engineer
4/15/22 5/9/2022
Page 2 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Duke Energy - Distribution
B. Special Conditions / Constraints
1) Duke Energy line crew availability may be affected or limited due to our required response to emergency conditions. This limitation will be dependent upon the severity of the emergency.
2) All normal relocation activities performed by this UAO will be done during its regular scheduled working hours. No night time relocation activities involving energized conductors or equipment will be performed, with the exception of outage restoration or other such emergency work (UAO’s Safety Manual regulation).
3) All NESC and OSHA required clearances from energized conductors and equipment should be maintained. Covering of conductors will not be provided by this UAO as this does not decrease the required code clearances.
4) Upon completion of any or all of relocations, as described in this approved Utility Work Schedule, any additional relocation of newly installed system that is required due to deviation by the County or its roadway contractor from the plans as provided to this UAO will be done at the expense of the County or its roadway contractor. Upon notification of such change, UAO will proceed with the design and construction of the additional relocation within the standard work schedule of this
UAO
5) De-energization of primary voltage (12.47kV) power lines requires coordination with multiple internal groups. Notify this UAO at least 20 days before any de-energization is required at each location. Due to the existing circuit loadings, distribution conductors can be only be de-energized and grounded during non-peak hours (may require night work by County contractor).
6) Temporary removal of streetlight wire or secondary services requires coordination with multiple internal groups. Notify this UAO at least 20 days before any temporary removal of wire is required at each location.
7) Temporary removed services will result in loss of power. This UAO is not responsible for generators needed during power outage.
Page 3 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Duke Energy - Distribution
SECTION C: UAO’s WORK ACTIVITIES
Consecutive DaysAction
Utility Facility (Type, Size, Material, Status)
From Station/ Offset
To Station/ Offset
Utility Work Description Dependent Activity TCP Phase Prior
To During
1 (NW
Corner)
Existing Pole and 12.47kV overhead conductors and equipment
1081+50, 62 Lt N/A To remain in place, in service and energized Duration of project construction N/A 0 0
2 (NE
Corner)
Existing Pole and 12.47kV overhead conductors and equipment
1082, 62 Lt 1083+5, 30 Lt
1083+60, 62 Lt 1083+5, 100 Lt De-energize overhead conductors Prior to drill shaft installation N/A 6 2
3 (NE
Corner)
Existing Pole and 12.47kV overhead conductors and equipment
1082, 62 Lt 1083+5, 30 Lt
1083+60, 62 Lt 1083+5, 100 Lt Energize overhead conductors After drill shaft installation N/A 6 2
4 (SE
Coner)
Existing Pole and 12.47kV overhead conductors and equipment
1083+45, 48 Rt N/A Remove overhead service conductor Prior to drill shaft installation N/A 6 2
5 (SE
Coner)
Existing Pole and 12.47kV overhead conductors and equipment
1083+45, 48 Rt N/A Install overhead service conductor After drill shaft installation N/A 6 2
6 (SE
Coner)
Existing Pole and 12.47kV overhead conductors and equipment
1083+15, 48 Rt 1083+80, 48 Rt De-energize overhead conductors Prior to drill shaft installation N/A 6 2
7 (SE
Coner)
Existing Pole and 12.47kV overhead conductors and equipment
1083+15, 48 Rt 1083+80, 48 Rt Energize overhead conductors After drill shaft installation N/A 6 2
8 (SW
Coner)
Existing Pole and 12.47kV overhead conductors and equipment
1083+38, 48 Rt N/A Remove overhead service conductor Prior to drill shaft installation N/A 6 2
9 (SW
Coner)
Existing Pole and 12.47kV overhead conductors and equipment
1083+38, 48 Rt N/A Install overhead service conductor After drill shaft installation N/A 6 2
Page 4 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Duke Energy - Distribution
Page 1 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER (UAO): Pinellas County Utilities
A. Summary of Utility Work and Execution
NON-CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
Total Preliminary 0 Prior to Pinellas County Project Construction 0 Total Material Procurement 0 During Pinellas County Project Construction 0 Total Right-of-Way Permitting 0 Total NON-Construction Time 0 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.
The following data is based on Pinellas County final design phase construction plans dated 10/11/2021 . Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.
UAO Project Representative: Trevor Singh Telephone Number: (727) 464-3536 UAO Field Representative: Anderson Mitchell Telephone Number: (727) 453-6701
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:
Trevorr Singh
(Signature) (Signature) (Signature)
Trevor Singh Tim Messina (Printed Name) (Printed Name) (Printed Name)
Engineering Specialist 2 Utility Coordinator (Title) (Title) (Title)
12/03/2021 (Date) (Date) (Date)
Jared Knight
Transportation Engineer
4/15/22 5/9/2022
Page 2 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER (UAO): Pinellas County Utilities
B. Special Conditions / Constraints
1) All Pinellas County Utilities (PCU) facilities shall remain in place and in service throughout construction. Contractor is to protect in place, all PCU facilities.
2) Contractor is requested to provide PCU, at time of the pre-construction meeting, their proposed work schedule
3)The contractor is requested to provide PCU a minimum 48hrs notice prior to excavation work within the vicinity of any PCU facilities and notify PCU immediately if any facilities incur damage due to construction. Number to call is:727- 453-6701.
4) PCU field representative shall be the point of contact during construction and is to be notified when excavating within 2' of any PCU facility.
5) PCU is to have access throughout the duration of the project in order to monitor, maintain and service, if necessary, all PCU facilities.
6) Contractor shall provide a minimum of two (2) weeks notice to PCU when adjustment of water mains, water meters, valve boxes or manhole ring and covers is determined to be required. Contractor is to call 727-453-6701.
7) PCU field representative shall be on-site during any directional bore work performed by the contractor. Contractor to notify field representative 48hrs prior to any bore.
8) PCU working hours are generally 7:00 am till 5:00 pm Monday through Friday. After hours work may be required if the work results in a customer outage.
Page 3 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER (UAO): Pinellas County Utilities
SECTION C: UAO’s WORK ACTIVITIES
Consecutive DaysAction
Utility Facility (Type, Size, Material, Status)
From Station/ Offset
To Station/ Offset
Utility Work Description Dependent Activity TCP Phase Prior
To During
WATER MAIN,
24” RCP,
ACTIVE
SW
CORNER
OF PARK
BELCHER
SW
CORNER
OF PARK
BELCHER
TO REMAIN AND PROTECTED IN PLACE N/A N/A 0 0
Page 4 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER (UAO): Pinellas County Utilities
Page 1 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Spectrum
A. Summary of Utility Work and Execution
NON-CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
Total Preliminary Prior to Pinellas County Project Construction 6 Total Material Procurement During Pinellas County Project Construction 1 Total Right-of-Way Permitting Total NON-Construction Time * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.
The following data is based on Pinellas County final design phase construction plans dated . Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.
UAO Project Representative: Brian Mixer Telephone Number: 727-329-2839 UAO Field Representative: Art Dubinas Telephone Number: 727-215-7578
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:
(Signature) (Signature) (Signature)
Art Dubinas Tim Messina (Printed Name) (Printed Name) (Printed Name)
Construction Coordinator Utility Coordinator (Title) (Title) (Title)
11/12/21 (Date) (Date) (Date)
CHARTER COMMS. /
SPECTRUM
Jared Knight
Page 2 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Spectrum
B. Special Conditions / Constraints
1) Spectrum’s activity is dependent on Duke Energy poles throughout this project. Any design changes to Duke Energy poles where Spectrum is attached as a joint user will need to be reviewed before final RGB and UWS submittal of this project.
2) Spectrum is to have access throughout the duration of the project to monitor and maintain Spectrum facilities for the ability to provide service.
3) Spectrum has a free and clear path to transfer facilities to new/existing Duke Energy poles.
4) Spectrum requests 14 day notice to start ”prior to construction” work.
Page 3 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Spectrum
SECTION C: UAO’s WORK ACTIVITIES
Consecutive DaysAction
Utility Facility (Type, Size, Material, Status)
From Station/ Offset
To Station/ Offset
Utility Work Description Dependent Activity TCP Phase Prior
To During
1 (NW
Corner) Overhead cable and fiber 1081+50, 62 Lt NA Rise facilities up the pole After bottom strand of traffic lights is lifted or tucked under Spectrum strand 1 0
2 (NE
Corner) Overhead cable and fiber 1083+5, 100 Lt 1083+30, 60 Lt Re- route facilities to accommodate mast arm placement. Rise facilities up the pole Rising dependent on Act#1,3,5 4 0
3 (SE
Corner)
Overhead cable and fiber 1083+5, 80 Rt NA Rise facilities up the pole
After Crown Castle rises their fiber.
After bottom strand of traffic lights is lifted or tucked under Spectrum strand
4 (SE
Corner)
Underground coax in conduit 1083+38, 52 Rt NA Monitor during construction NA 0 1
Page 4 of 4 PINELLAS COUNTY 11/19//2019
COUNTY PROJECT #: 004183I PROJECT TITLE: Signalization Plans – Park Blvd and Belcher Rd
UTILITY AGENCY/OWNER (UAO): Spectrum
Page 1 of 3 PINELLAS COUNTY 10/15//2019
COUNTY PROJECT #: 004183I PROJECT TITLE #: PARK BLVD & BELCHER RD (71st St) Signalization
UTILITY AGENCY/OWNER (UAO): Knology Broadband of Florida DBA WOW! (Wide Open West)
A. Summary of Utility Work and Execution
NON-CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
Total Preliminary Prior to Pinellas County Project Construction 4 Total Material Procurement During Pinellas County Project Construction 12 Total Right-of-Way Permitting Total NON-Construction Time 14 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project. The following data is based on Pinellas County final design phase construction plans dated 10/21. Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.
UAO Project Representative: DAVE HAMLIN Telephone Number: 678-409-8721 UAO Field Representative: DAVE HAMLIN Telephone Number: 678-409-8721
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:
(Signature) (Signature) (Signature)
Dave Hamlin Tim Messina (Printed Name) (Printed Name) (Printed Name)
Construction Coordinator Utility Coordinator (Title) (Title) (Title)
12/6/21 (Date) (Date) (Date) horororrorororrororororrorrorororrorororororrorororooorororororrorroooooooooooooooooooooooooooooooo iiiiiiiiziiiii edededededededededededededededededededededeedededeedededeeeeeedeedeeedededeeededededddeedededdedddddedeedddddeedddeeeeededdeedddeeededdeeddeddd Utittttt lityyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAgeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeen
(Signature)
Jared Knight
Page 2 of 3 PINELLAS COUNTY 10/15//2019
COUNTY PROJECT #: 004183I PROJECT TITLE #: PARK BLVD & BELCHER RD (71st St) Signalization
UTILITY AGENCY/OWNER (UAO): Knology Broadband of Florida DBA WOW! (Wide Open West)
B. Special Conditions / Constraints
1: WOW! relocation activities will not commence until a signed copy by the engineer of record and Pinellas County are approved.
2: WOW! field inspector Dave Hamlin will be field point of contact for WOW! during construction duration of the project.
3: WOW! Working Days are during normal business hours, Monday – Friday, 7:30 am – 5:00 pm (excluding Holidays). WOW! will arrange any works after hour with an advance notice through WOW! field representative Dave Hamlin. Please call 48 hours prior to schedule any after hours work if needed. After hours emergency contact Dave Hamlin. Secondary point of contact if Dave Hamlin is unavailbe please call Richard LaGanga (WOW! supervisor) @ 727-422-8040.
4: WOW! facilities that are to remain in place will be protected during construction.
5: WOW! design was based off Duke Energy UWS and not Duke Energy marked plans. Duke design doesn’t match UWS. Based on conflicting information WOW!
design was based on Duke Energy UWS rather then the marked plans.
6: WOW! is depandant to Duke Energy design plans. Any design changes by Duke Energy will require WOW! to review revised plans from Duke Energy.
7: WOW requests two week notice prior to the start of construction to arrange for its contractors to be onsite to adjust facilities.
8: See WOW! RGB plans dated 12/06/21.
Page 3 of 3 PINELLAS COUNTY 10/15//2019
COUNTY PROJECT #: 004183I PROJECT TITLE #: PARK BLVD & BELCHER RD (71st St) Signalization
UTILITY AGENCY/OWNER (UAO): Knology Broadband of Florida DBA WOW! (Wide Open West)
SECTION C: UAO’s WORK ACTIVITIES
Action
Utility Facility (Type, Size, Material, Status)
From Station/ Offset
To Station/ Offset
Utility Work Description Dependent Activity TCP Phase
Consecutive Days
Prior To During
1 WOW 24CT OFOC 1081+52,
60’LT
1083+28, 61’LT ADJUST WOW! OFOC DRILL SHAFT & ARM
INSTALLATION PH. I 0 4
2 WOW 84/74/6 CT
OFOC
1080+56, 48’ RT
1083+49, 50’RT ADJUST WOW! OFOC DRILL SHAFT & ARM
INSTALLATION PH. I 0 4
3 WOW! 24CT OFOC 1083+05,
100’ LT
1083+05, 80’ RT ADJUST WOW! OFOC DRILL SHAFT & ARM
INSTALLATION PH. I 0 4
4 WOW! 24CT OFOC 1083+05,
100’ LT
1083+05, 80’ RT ADJUST WOW! OFOC PRIOR TO CONSTRUCTIN N/A 4 0
TOTAL: TOTAL:
4 12
Page 1 of 3 PINELLAS COUNTY 07/20//2022
COUNTY PROJECT #: 004183I PROJECT TITLE: MAST ARM HARDENING
UTILITY AGENCY/OWNER (UAO): MCI METRO ACCESS TRANSMISSION SERVICES LLC.
A. Summary of Utility Work and Execution
NON-CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
CONSTRUCTION ITEMS ESTIMATED *CALENDAR
DAYS
Total Preliminary 0 Prior to Pinellas County Project Construction 0 Total Material Procurement 0 During Pinellas County Project Construction 7 Total Right-of-Way Permitting 0 Total NON-Construction Time 0 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.
The following data is based on Pinellas County final design phase construction plans dated 10/11/2021 . Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.
UAO Project Representative: ANDREW COLE Telephone Number: 813-847-4037 UAO Field Representative: TONY WHEELER Telephone Number: 727-359-1754
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: Engineer of Record: Acceptance by Pinellas County:
Andrew Cole (Signature) (Signature) (Signature)
ANDREW COLE
(Printed Name) (Printed Name) (Printed Name)
ENG II
(Title) (Title) (Title)
07/28/2022 (Date) (Date) (Date)
Daniel Torres
Utility Coordinator
9/6/2022
Jared Knight
8/15/2022
Page 2 of 3 PINELLAS COUNTY 07/20//2022
COUNTY PROJECT #: 004183I PROJECT TITLE: MAST ARM HARDENING
UTILITY AGENCY/OWNER (UAO): MCI METRO ACCESS TRANSMISSION SERVICES LLC.
B. Special Conditions / Constraints
1. MCI REQUESTS A 72 BUSINESS HOUR PRE-CONSTRUCTION NOTICE WITH THE CONTACT INFORMATION FOR THE BID-AWARDED CONSTRUCTION COMPANY TO ALLOW MCI TO HAVE TIME TO SHARE SAID CONTACT INFORMATION WITH MCI’S CONTRACTING TEAM TO
ESTABLISH COMMUNICATION.
2. PLEASE PROVIDE THE NOTICE TO ANDREW COLE – ANDREW.COLE2@VERIZON.COM
Page 3 of 3 PINELLAS COUNTY 07/20//2022
COUNTY PROJECT #: 004183I PROJECT TITLE: MAST ARM HARDENING
UTILITY AGENCY/OWNER (UAO): MCI METRO ACCESS TRANSMISSION SERVICES LLC.
SECTION C: UAO’s WORK ACTIVITIES
Action
Utility Facility (Type, Size, Material, Status)
From Station/ Offset
To Station/ Offset
Utility Work Description Dependent Activity TCP Phase
Consecutive Days
Prior To During
1 MCI – (1) AERIAL
FOC - EXISTING
1081+80
LT N/A MCI IS TO ADJUST OUR FOC UP OR DOWN THE POLE
AS NEEDED DURING FOUNDATION ARM INSTALLATION
MAST ARM FOUNDATION
PID 004183I 1 0 7
Page 1 of4
COUNTY PROJECT#: PIO: 0041831
PINELLAS COUNTY
UTILITY WORK SCHEDULE
PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER (UAO): Uniti Fiber/Southern Light
A. Summary of Utility Work and Execution
07/20//2022
NON-CONSTRUCTION ITEMS ESTIMATED '"CALENDAR CONSTRUCTION ITEMS
DAYS
ESTIMATED *CALENDAR
DAYS
Total Preliminary Total Material Procurement Total Right-of-Way Permitting Total NON-Construction Time
0 Prior to Pinellas County Project Construction 0 During Pinellas County Project Construction
0 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part "C" of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Pinellas County, the roadway contractor and other right-of-way users, the location, relocation, adjustment, installation and/or protection of their facilities on this Pinellas County project.
The following data is based on Pinellas County final design phase construction plans dated 11/11/21. Any deviation by Pinellas County or its contractor from the plans, as provided, may require assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond their control and that could not be reasonably anticipated and avoided with the exercise of due diligence. The UAO agrees to notify Pinellas County in writing prior to starting, stopping, resuming or completing work.
UAO Project Representative:
UAO Field Representative:
� No changes to forms document.
_D::..a::..v:..:.id:;:_;._W:..:o:..:oc.:::d.::..s ______________ Telephone Number:
_T.:..ce:.:.r:.,iryc.-Y.;._o:;_:u=n=g'--------------- Telephone Number:
D Appendix "Changes to Forms Document" is attached. _ Number of Attachment Pages.
Authorized Utility Agent:
Engineer of Record:
(Signature)
Terry Young (Printed Name) (Printed Name)
OSP Engineer (Title) (Title)
8/3/22 (Date) (Date)
813-539-1180 251-422-3872
Acceptance by Pinellas County:
D a;u:d 7i1/4AU., (Signature)
(Printed Name)
(Title)
(Date)
Daniel Torres
Utility Coordinator
9/6/2022
Jared Knight
8/15/2022
COUNTY PROJECT#: PID: 0041831
PINELLAS COUNTY
UTILITY WORK SCHEDULE
PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER {UAO): Uniti Fiber/Southern Light
B. I Special Conditions/ Constraints
07 /20//2022
Page 3 of4
COUNTY PROJECT#: PIO: 0041831
PINELLAS COUNTY
UTILITY WORK SCHEDULE
PROJECT TITLE: Park Blvd & Belcher Rd
UTILITY AGENCY/OWNER (UAO): Uniti Fiber/Southern Light
SECTION C: UAO's WORK ACTIVITIES
Utility Facility From To
Action (Type, Size, Station/ Station/ Utility Work Description
# Material, Offset Offset
Status) l -2.33" Conduit, 2-l 1.25" Conduits I - 108[+75 1086+60 Directional bore to Relocate Conduit Path to Avoid Mast Arm Footing on
144ct BFOC 2 - 288ct 56' RT 48' RT SE Comer
BFOC
07 /20//2022
Consecutive
Dependent Activity TCP Days Phase Prior
During To
NIA NIA 45 0
File details come from the government source that posted it. Updated .