Schedule of Services - USCGC VIGOROUS FY20 DD - 70Z08020QP45A4100.xls.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USCGC VIGOROUS FY20 DRY DOCK
Solicitation number
70Z080-20-Q-P45A4100
Issued by

About this file

This document contains a schedule of services and statement of work for the USCGC VIGOROUS FY20 dry dock availability. The Coast Guard is seeking a contractor to perform maintenance and repair services on the cutter, including hull preservation and plating repair, shafting and propeller inspection and maintenance, sea valve overhaul, cathodic protection renewal, and other work items. Pricing is provided for definite line items as well as optional items, and a composite labor rate is requested for additional work. Responses are due under Solicitation Number 70Z080-20-Q-P45A4100 issued by the Department of Homeland Security Coast Guard for the dry docking of the cutter at an unspecified shipyard location.

View the file

Other files

File Type Posted
Amendment 00019.pdf PDF
Amendment 00018_Page 2 of 2.pdf PDF
Amendment 00018_Page 1 of 2.pdf PDF
Amendment 00017_Page 2 of 2.pdf PDF
Amendment 00017_Page 1 of 2.pdf PDF
Amendment 00016.pdf PDF
Amendment 00015_Page 1 of 2.pdf PDF
Amendment 00015_Page 2 of 2.pdf PDF
Amendment 00014_Page 1 of 2.pdf PDF
Amendment 00014_Page 2 of 2.pdf PDF
Amendment 00013.pdf PDF
Amendment 00012.pdf PDF
Amendment 00011_Page 1 of 2.pdf PDF
Amendment 00009.zip ZIP file
Amendment 00010.zip ZIP file
Amendment 00008.zip ZIP file
Amendment 00011_Page 2 of 2.pdf PDF
Amendment 00007.zip ZIP file
Amendment 00006.zip ZIP file
Amendment 00005_627-WMEC_9 - BoM- FM Sprink-n-Washdown 2dck-n-below.pdf PDF
Amendment 00005_Page 2 of 2.pdf PDF
Amendment 00005_627-WMEC_61 - BoM- Steam.Feed-n-Cond.pdf PDF
Amendment 00005_627-WMEC_521_1 - FM Sprink-n-Washdown Arrgt.pdf PDF
Amendment 00005_627-WMEC_521_4 - FM Sys Details.pdf PDF
Amendment 00005_627-WMEC_535_1 - Steam.Feed-n-Cond Sys Piping.pdf PDF
Amendment 00005_Page 1 of 2.pdf PDF
Amendment 00005_627-WMEC_529_3 - Bilge Sys.Machy Space Arrgt.pdf PDF
Amendment 00005_627-WMEC_22 - BoM- SeaChests.pdf PDF
Amendment 00005_015174281 Parts List for A066NM04109.pdf PDF
Amendment 00005_627-WMEC_521_2 - FM Sprink-n-Washdown Arrgt.MainDeck-n-Above.pdf PDF
Amendment 00005_015174281 Parts List for HUB-CMP245.06.pdf PDF
Amendment 00005_627-WMEC_163_1 - MainProp.Sea Chests Arrgt.pdf PDF
Amendment 00003_Page 2 of 2.pdf PDF
Amendment 00004_Page 2 of 2.pdf PDF
Amendment 00004_Page 1 of 2.pdf PDF
Amendment 00003_Page 1 of 2.pdf PDF
Amendment 00001_Page 1 of 2.pdf PDF
Amendment 00001_Page 2 of 2.pdf PDF
Amendment 00002_Page 1 of 2.pdf PDF
Amendment 00002_Page 2 of 2.pdf PDF
Statement of Work - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Combined Synopsis Solicitation - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SoS

GOVERNMENT ESTIMATE FOR: Contractor Insert Name Here
USCGC VIGOROUS (WMEC-210B) DRYDOCK AVAILABILITY FY2020
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICETypeAFC
D-001Hull Plating (U/W Body), Ultrasonic TestingJOB1$0.00RWI45
D-002U/W Body, Preserve (100%)JOB1$0.00RWI45
D-003Hull Plating Freeboard, Preserve “100%”JOB1$0.00RWI30
D-004Propulsion Shaft Fairwaters And Rope Guards, InspectJOB1$0.00RWI45
D-005Voids (Non-Accessible), Leak TestJOB1$0.00RWI45
D-006Voids (Non-Accessible), Internal Surfaces, PreserveJOB1$0.00RWI45
D-007Propulsion Shafting, Strain Gage Alignment, InspectJOB1$0.00RWI45
O-008Propulsion Shaft Coating, RenewEACH2$0.00RWI45
D-009Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair Or RenewJOB1$0.00RWI45
D-010Controllable Pitch Propeller (CPP) System, Inspect and ServiceJOB1$0.00RWI45
D-011Sea Valves and Waster Pieces, Overhaul Or RenewJOB1$0.00RWI45
D-012Sea Strainers - Duplex (All Sizes), OverhaulJOB1$0.00RWI45
D-013Superstructure, Preserve “100%”JOB1$0.00RWI30
D-014Cathodic Protection / Zinc Anodes, RenewJOB1$0.00RWI45
D-015DrydockJOB1$0.00RWI45
D-016Temporary Services, Provide - CutterJOB1$0.00RWI45
D-017Engineer Storeroom (32 Stores) Hull Plating, RepairJOB1$0.00CSMP45
D-018Stringers (Paint Locker), RenewJOB1$0.00CSMP45
D-019Hot Water Accumulation Tank and Controller, RenewJOB1$0.00CSMP45
D-020Bulkhead 32, RenewJOB1$0.00CSMP45
D-021Hull Plating (Engine Room), RenewJOB1$0.00CSMP45
D-022Main Mast, Preserve, 100%JOB1$0.00RWI45
D-023Propulsion Shafting; Remove, Inspect, and ReinstallJOB1$0.00RWI45
D-024Fathometer Transducer, General MaintenanceJOB1$0.00RWI42
D-025Bilge Drainage Valves, RenewJOB1$0.00CSMP45
O-026Propeller Shaft Sleeve(s), RenewEACH2$0.00RWI45
D-027Sea Trial Performance, Support, ProvideJOB1$0.00RWI45
D-02835’ Whip Antennas, RenewJOB1$0.00RWI42
D-029Appendages (U/W), Preserve (Internal) and Leak TestJOB1$0.00RWI45
D-030Rudder Assemblies, Inspect And RepairJOB1$0.00RWI45
O-031Propulsion Shaft Bearings (External), Check ClearancesEACH2$0.00RWI45
O-032Stern Tube Interior Surfaces, Preserve 100%EACH2$0.00RWI45
D-033Doppler Speed Log, ReplaceJOB1$0.00TCTO45
D-034Controllable Pitch Propellers, Clean and InspectJOB1$0.00RWI45
D-035Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and ReinstallJOB1$0.00RWI45
O-036Propulsion Shafting, Optical Or Laser Alignment CheckEACH2$0.00RWI45
O-037Propulsion Shaft Bearings (External), RenewEACH2$0.00RWI45
O-038Propulsion Stern Tube Beaerings, RenewEACH2$0.00RWI45
D-039Propulsion Intermediate/Line Shaft, Remove, Inspect and ReinstallJOB1$0.00RWI45
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
COMPOSITE LABOR RATE FOR GROWTH WORK
DAILY RATE FOR LAYDAYS

File details come from the government source that posted it. Updated .