Amendment 00002_Page 2 of 2.pdf

PDF 488 KB Posted

Attached to
USCGC VIGOROUS FY20 DRY DOCK Federal contract opportunity
Solicitation number
70Z080-20-Q-P45A4100
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains answers to questions regarding work items for the dry docking and repair of the USCGC VIGOROUS under Solicitation Number 70Z080-20-Q-P45A4100 issued by the Department of Homeland Security US Coast Guard. Both propellers and the port intermediate line shaft are required to be cleaned, inspected, and repaired or replaced as specified. Hot circulating water will be provided for repairs to the ship's hot water tank, and steam must be supplied when crew are living onboard. Details on stainless steel strainer basket materials, manufacturer part numbers, and national stock numbers are also included.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC VIGOROUS FY20 DRY DOCK, newest first.
File Type Posted
Amendment 00019.pdf PDF
Amendment 00018_Page 2 of 2.pdf PDF
Amendment 00018_Page 1 of 2.pdf PDF
Amendment 00017_Page 1 of 2.pdf PDF
Amendment 00017_Page 2 of 2.pdf PDF
Amendment 00016.pdf PDF
Amendment 00015_Page 2 of 2.pdf PDF
Amendment 00015_Page 1 of 2.pdf PDF
Amendment 00014_Page 1 of 2.pdf PDF
Amendment 00014_Page 2 of 2.pdf PDF
Amendment 00013.pdf PDF
Amendment 00012.pdf PDF
Amendment 00007.zip ZIP file
Amendment 00008.zip ZIP file
Amendment 00011_Page 2 of 2.pdf PDF
Amendment 00011_Page 1 of 2.pdf PDF
Amendment 00010.zip ZIP file
Amendment 00009.zip ZIP file
Amendment 00006.zip ZIP file
Amendment 00005_627-WMEC_61 - BoM- Steam.Feed-n-Cond.pdf PDF
Amendment 00005_627-WMEC_521_2 - FM Sprink-n-Washdown Arrgt.MainDeck-n-Above.pdf PDF
Amendment 00005_627-WMEC_163_1 - MainProp.Sea Chests Arrgt.pdf PDF
Amendment 00005_015174281 Parts List for HUB-CMP245.06.pdf PDF
Amendment 00005_627-WMEC_9 - BoM- FM Sprink-n-Washdown 2dck-n-below.pdf PDF
Amendment 00005_627-WMEC_22 - BoM- SeaChests.pdf PDF
Amendment 00005_627-WMEC_521_1 - FM Sprink-n-Washdown Arrgt.pdf PDF
Amendment 00005_627-WMEC_529_3 - Bilge Sys.Machy Space Arrgt.pdf PDF
Amendment 00005_Page 1 of 2.pdf PDF
Amendment 00005_627-WMEC_535_1 - Steam.Feed-n-Cond Sys Piping.pdf PDF
Amendment 00005_Page 2 of 2.pdf PDF
Amendment 00005_627-WMEC_521_4 - FM Sys Details.pdf PDF
Amendment 00005_015174281 Parts List for A066NM04109.pdf PDF
Amendment 00004_Page 2 of 2.pdf PDF
Amendment 00004_Page 1 of 2.pdf PDF
Amendment 00003_Page 1 of 2.pdf PDF
Amendment 00003_Page 2 of 2.pdf PDF
Amendment 00002_Page 1 of 2.pdf PDF
Amendment 00001_Page 2 of 2.pdf PDF
Amendment 00001_Page 1 of 2.pdf PDF
Combined Synopsis Solicitation - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Schedule of Services - USCGC VIGOROUS FY20 DD - 70Z08020QP45A4100.xls.xlsx XLSX spreadsheet
Statement of Work - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

Work Item 34, Paraqgraph 1.1 Intent states "This work item describes the requirements for the Contractor to clean and inspect the propeller immediately after drydocking."

This indicates that ONE propeller is to be cleaned and inspected.

Paragraph 3.2 states "3.2 CPP Cleaning. The Contractor shall thoroughly clean the Cutter's controllable pitch propeller or propellers depicted in Coast Guard Drawing 627 WMEC 245-017 to remove all marine growth and fouling."

How many propellers are required to be cleaned and inspected by work item 34?

Answer :

Both propellers shall be cleaned and inspected.

Work Item 39, Paragraph 1.1 Intent. States "This work item describes the requirements for the Contractor to remove, visually inspect and reinstall port propulsion line shafts."

Paragraph 3.3 states "Line shaft removal. The Contractor shall remove port and starboard line shafts using..."

Is the contractor required to remove and install both the port and starboard intermediate line shafts or just the port intermediate line shaft?

Answer:

1.1: The intent of this WI is to remove the PORT shaft for repairs, while having the OPTION to the same to the STBD shaft, depending up strain gage readings.

3.3: This is true if the STBD shaft option is activated, as it stands at this moment, only the PORT shaft is definitely being removed.

At this time, the contractor is required to remove and install the PORT shaft. The STBD shaft is an OPTION item which may be activated pending strain gage readings.

Question:

Work Item 012, Reference Drawings identified on Work Item 12 do not provide procurement information in order to identify the specific sea strainer baskets which are required to be replaced.

Please provide the specific material type and basket mesh (hole size/spacing) for the required new strainer baskets.

Answer:

All Strainer inserts are Stainless Steel, please refer to the table below for manufacturer’s part number and NSN’s, which may be cross reference for details.

Work Item 016, Hot Circulating Water and Steam services are not typically required for availabilities.

Is Hot Circulating Water and Steam required to be provided for this project?

Answer:

a. How circulating water will be required during this availability. WI019 is the repair of the ship’s Hot Water Tank.

b. Steam will need to be provided to the ship for any duration the crew is living onboard.