Amendment 00015_Page 2 of 2.pdf

PDF 367 KB Posted

Attached to
USCGC VIGOROUS FY20 DRY DOCK Federal contract opportunity
Solicitation number
70Z080-20-Q-P45A4100
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains questions and answers regarding optional work items for drydocking the USCGC VIGOROUS. The work items include replacing propeller shaft sleeves, renewing fiberglass covering on propeller shafts, replacing external propulsion bearings, checking propulsion system alignment using optical or laser instrumentation, and refilling the hydraulic system with MIL-L-46152 Grade 10W-30 oil. The answers indicate work would be performed on one or both propeller shafts as determined necessary by U.S. Coast Guard inspection, and involve replacing port shaft external bearings and potential replacing starboard bearings based on strain gage readings. The solicitation is for drydocking the USCGC VIGOROUS in FY20 for the Department of Homeland Security U.S. Coast Guard.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC VIGOROUS FY20 DRY DOCK, newest first.
File Type Posted
Amendment 00019.pdf PDF
Amendment 00018_Page 2 of 2.pdf PDF
Amendment 00018_Page 1 of 2.pdf PDF
Amendment 00017_Page 1 of 2.pdf PDF
Amendment 00017_Page 2 of 2.pdf PDF
Amendment 00016.pdf PDF
Amendment 00015_Page 1 of 2.pdf PDF
Amendment 00014_Page 2 of 2.pdf PDF
Amendment 00014_Page 1 of 2.pdf PDF
Amendment 00013.pdf PDF
Amendment 00012.pdf PDF
Amendment 00008.zip ZIP file
Amendment 00011_Page 2 of 2.pdf PDF
Amendment 00011_Page 1 of 2.pdf PDF
Amendment 00010.zip ZIP file
Amendment 00009.zip ZIP file
Amendment 00007.zip ZIP file
Amendment 00006.zip ZIP file
Amendment 00005_627-WMEC_22 - BoM- SeaChests.pdf PDF
Amendment 00005_627-WMEC_521_1 - FM Sprink-n-Washdown Arrgt.pdf PDF
Amendment 00005_627-WMEC_529_3 - Bilge Sys.Machy Space Arrgt.pdf PDF
Amendment 00005_Page 1 of 2.pdf PDF
Amendment 00005_627-WMEC_535_1 - Steam.Feed-n-Cond Sys Piping.pdf PDF
Amendment 00005_Page 2 of 2.pdf PDF
Amendment 00005_627-WMEC_521_4 - FM Sys Details.pdf PDF
Amendment 00005_015174281 Parts List for A066NM04109.pdf PDF
Amendment 00005_627-WMEC_61 - BoM- Steam.Feed-n-Cond.pdf PDF
Amendment 00005_627-WMEC_521_2 - FM Sprink-n-Washdown Arrgt.MainDeck-n-Above.pdf PDF
Amendment 00005_627-WMEC_163_1 - MainProp.Sea Chests Arrgt.pdf PDF
Amendment 00005_015174281 Parts List for HUB-CMP245.06.pdf PDF
Amendment 00005_627-WMEC_9 - BoM- FM Sprink-n-Washdown 2dck-n-below.pdf PDF
Amendment 00004_Page 1 of 2.pdf PDF
Amendment 00003_Page 1 of 2.pdf PDF
Amendment 00003_Page 2 of 2.pdf PDF
Amendment 00004_Page 2 of 2.pdf PDF
Amendment 00001_Page 2 of 2.pdf PDF
Amendment 00001_Page 1 of 2.pdf PDF
Amendment 00002_Page 2 of 2.pdf PDF
Amendment 00002_Page 1 of 2.pdf PDF
Statement of Work - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Combined Synopsis Solicitation - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Schedule of Services - USCGC VIGOROUS FY20 DD - 70Z08020QP45A4100.xls.xlsx XLSX spreadsheet
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

Paragraph 1.1 states "This work item describes the requirements for the Contractor to renew the sleeve(s) on a designated propeller shaft."

a. Paragraph 1.2, Government Furnished Material, shows materials for 2 propeller shafts.

b. Is the Contractor required to replace the propeller shaft sleeves on just one shaft or both?

Answer :

WI026 is an OPTIONAL work item. KTR would be required to replace any shaft sleeve the CG Inspector along w/COR approval deem necessary. Could be one or could be both.

GFE that is marked with ** are parts that have been set aside for this availability if needed.

Question:

Paragraph 1.1 states "This work item describes the requirements for the Contractor to renew the fiberglass reinforced plastic (FRP) covering for a designated propeller shaft."

a. Paragraph 3.4 states "New covering installation. The Contractor shall perform the FRP covering renewal for the designated propeller shaft,…"

b. For work item 8, is a designated propeller shaft a tail shaft only, a line shaft only, or both?

Answer:

WI008 is an OPTIONAL work item. If this work item is deemed as necessary by the USCG Inspector, it will be activated.

If called out, should be both.

Question:

Paragraph 1.1 states "This work item describes the requirements for the Contractor to renew the external, water-lubricated, propulsion bearings on a designated propeller shaft."

a. Paragraph 1.2 shows Government Furnished Material to be 2 Each, Intermediate Strut Bearings and 2 Each Aft Strut Bearings. This is a quantity for 2 shafts.

b. Is the Contractor required to replace the Aft and Intermediate Strut Bearings on just one shaft or both?

Answer:

WI037 is an OPTIONAL Item which can be activated per shaft. If this work item is deemed as necessary by the USCG Inspector, it will be activated.

KTR would be required to replace all waterborne Port shaft external bearings and if STBD shaft was selected to be removed

Question:

Paragraph 1.1 states "This work item describes the requirements for the Contractor to renew the propulsion shaft stern tube bearings on a designated propeller shaft."

a. The Government provided material identifies 2 each stern tube bearings.

b. How many stern tube bearings is contractor required to renew?

Answer:

WI038 is an OPTIONAL Item which can be activated per shaft. If this work item is deemed as necessary by the USCG Inspector, it will be activated.

1. We are planning on having the PORT bearings replaced only at this time.

2. Depending upon Strain Gage readings, the STBD may also need to be replaced.

Paragraph 1.1 states "This work item describes the requirements for the Contractor to check propulsion system alignment by using optical or laser instrumentation on a designated propeller shaft."

a. Please confirm the number of propeller shafts that are required to be checked using optical or laser instrumentation.

Answer:

WI036 is an OPTIONAL Item which can be activated per shaft. If this work item is deemed as necessary by the USCG Inspector, it will be activated.

Please confirm that it is the intent of the government to have the Contractor refill the hydraulic system with oil which meets the requirements/specification of Mil-L-46152, Grade 10W-30).

a. Mil-L-46152 is a military specification for Internal Combustion Engine Lubricating Oil.

Combustion engine lubricating oil is typically not used in hydraulic systems.

b. If Mil-L-46152 is not the required fluid specification, please provide the correct oil identification/specification.

Answer:

MILSPEC is correct, at some point 10W 30 was added to the system and SF does not want to change due to unknown issues that might affect the system.

Paragraph 1.1 states "This work item describes the requirements for the Contractor to renew the fiberglass reinforced plastic (FRP) covering for a designated propeller shaft."

a. Paragraph 3.4 states "New covering installation. The Contractor shall perform the FRP covering renewal for the designated propeller shaft,…"

b. For work item 8, is a designated propeller shaft a tail shaft only, a line shaft only, or both?

Answer:

WI008 is an OPTIONAL work item. If this work item is deemed as necessary by the USCG Inspector, it will be activated.

If called out, should be both.