Amendment 00001_Page 2 of 2.pdf

PDF 280 KB Posted

Attached to
USCGC VIGOROUS FY20 DRY DOCK Federal contract opportunity
Solicitation number
70Z080-20-Q-P45A4100
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains an amendment to a solicitation and statement of work for dry dock services for the USCGC VIGOROUS. The amendment provides answers to questions about work items included in the specification for superstructure work. It also addresses the anticipated condition of the cutter upon arrival in terms of displacement and draft for stability purposes during the initial strain gage measurement and docking. The solicitation seeks dry dock services for the US Coast Guard cutter USCGC VIGOROUS in fiscal year 2020. The combined synopsis, schedule of services, and statement of work provide details on the required work.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC VIGOROUS FY20 DRY DOCK, newest first.
File Type Posted
Amendment 00019.pdf PDF
Amendment 00018_Page 2 of 2.pdf PDF
Amendment 00018_Page 1 of 2.pdf PDF
Amendment 00017_Page 1 of 2.pdf PDF
Amendment 00017_Page 2 of 2.pdf PDF
Amendment 00016.pdf PDF
Amendment 00015_Page 2 of 2.pdf PDF
Amendment 00015_Page 1 of 2.pdf PDF
Amendment 00014_Page 2 of 2.pdf PDF
Amendment 00014_Page 1 of 2.pdf PDF
Amendment 00013.pdf PDF
Amendment 00012.pdf PDF
Amendment 00008.zip ZIP file
Amendment 00011_Page 2 of 2.pdf PDF
Amendment 00007.zip ZIP file
Amendment 00011_Page 1 of 2.pdf PDF
Amendment 00010.zip ZIP file
Amendment 00009.zip ZIP file
Amendment 00006.zip ZIP file
Amendment 00005_627-WMEC_22 - BoM- SeaChests.pdf PDF
Amendment 00005_627-WMEC_521_1 - FM Sprink-n-Washdown Arrgt.pdf PDF
Amendment 00005_627-WMEC_529_3 - Bilge Sys.Machy Space Arrgt.pdf PDF
Amendment 00005_627-WMEC_61 - BoM- Steam.Feed-n-Cond.pdf PDF
Amendment 00005_627-WMEC_521_2 - FM Sprink-n-Washdown Arrgt.MainDeck-n-Above.pdf PDF
Amendment 00005_627-WMEC_163_1 - MainProp.Sea Chests Arrgt.pdf PDF
Amendment 00005_015174281 Parts List for HUB-CMP245.06.pdf PDF
Amendment 00005_627-WMEC_9 - BoM- FM Sprink-n-Washdown 2dck-n-below.pdf PDF
Amendment 00005_Page 1 of 2.pdf PDF
Amendment 00005_627-WMEC_535_1 - Steam.Feed-n-Cond Sys Piping.pdf PDF
Amendment 00005_Page 2 of 2.pdf PDF
Amendment 00005_627-WMEC_521_4 - FM Sys Details.pdf PDF
Amendment 00005_015174281 Parts List for A066NM04109.pdf PDF
Amendment 00004_Page 1 of 2.pdf PDF
Amendment 00003_Page 1 of 2.pdf PDF
Amendment 00003_Page 2 of 2.pdf PDF
Amendment 00004_Page 2 of 2.pdf PDF
Amendment 00002_Page 1 of 2.pdf PDF
Amendment 00001_Page 1 of 2.pdf PDF
Amendment 00002_Page 2 of 2.pdf PDF
Combined Synopsis Solicitation - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Schedule of Services - USCGC VIGOROUS FY20 DD - 70Z08020QP45A4100.xls.xlsx XLSX spreadsheet
Statement of Work - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

Work Item 13, Does superstructure as defined in paragraph 4.1 include the interior side of bow bulwark port and starboard stem to frame 52, main deck side shell interior side from approximately frame 70 to stern, interior side of bridge deck forward walkway, and interior side of aircastle port and starboard?

Answer :

Yes; all of the areas in question are included in this Spec.

Question:

Can the Coast Guard provide the anticipated arrival condition of the Cutter in regards to displacement and drafts?

Answer:

The cutter will arrive prior to the DD at approximately 70% liquid load for ship’s stability and to support the initial strain gage measurement. The actual liquid load for docking of the vessel will be worked out prior to docking between the ship’s Engineering Officer, NavEng, and the dock master.