Amendment 00005_Page 2 of 2.pdf
PDF 293 KB Posted
- Attached to
- USCGC VIGOROUS FY20 DRY DOCK Federal contract opportunity
- Solicitation number
- 70Z080-20-Q-P45A4100
About this file
This document contains responses to questions regarding Amendment 00005 for the solicitation to dry dock the USCGC VIGOROUS. The amendment provides clarification on repair requirements for a fuel tank, stating that additional repairs identified after ultrasonic testing will be subject to a change request. For permanent repairs to areas with over 25% wastage, the contractor must present recommendations in a Condition Found Report. The amendment also attaches missing reference drawings required for work items 10, 11, and 12 relating to government provided equipment and components. The combined synopsis/solicitation describes the opportunity to perform scheduled services and work defined in the statement of work to dry dock the USCGC VIGOROUS in fiscal year 2020 for the Department of Homeland Security's United States Coast Guard.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question:
Paragraph 3.4.2 states "Crop and renew the existing belzona repair along the bottom of the tank and on any area greater than 25% wastage and crop and renew all its associated components."
a. The contractor can identify the Belzona repair but cannot price the unknown areas of wastage above 25% until after the UT measurements are completed. Will the additional repairs be the subject of a Change Request?
b. Does the repair requirement consist of removing existing belzona, where found, and installing new belzona?
Answer :
a. Yes, the repairs will be subject to a CR based upon UT Shots in Para 3.7.
b. Ideally, the contractor will present a permanent repair that will withstand the nature of operation of the tank. The condition of the tank, and the proposed repair recommendations shall be put forward in a Condition Found Report.
Question:
Work Item 12, Reference Drawing 535-002 identifies drawings 627WMEC-535-001, 627WMEC163-001, BM 22, and Bill of Materials 627BM61. These four references are not included in the reference drawings provided.
Please provide references 627WMEC-535-001, 627WMEC163-001, BM 22, and Bill of Materials
627BM61
Answer:
Drawings attached
Question:
Work Item 11, Reference Drawing 521-003 identifies drawings 627-WMEC-521-001, 627WMEC-521-002, 627WMEC-521-004, 627-529-003, and BM 9. These five references are not included in the reference drawings provided.
Please provide references 627-WMEC-521-001, 627WMEC-521-002, 627WMEC-521-004, 627-529-003, and BM 9.
Answer:
Drawings attached
Question:
Work Item 10, Please identify the individual components of each Government Provided Item listed in paragraph 1.2.
Specifically, what components are included in PN: HUB-CMP245/06 and PN: A066SM04109
Answer:
Kit contents for HUB-CMP245/06 enclosed (NIIN 015174281). PN: A066SM04109 components are also associated NIIN 015174281.
File details come from the government source that posted it. Updated .