This document contains questions and answers regarding an amendment to a federal contract solicitation for dry dock services for the USCGC VIGOROUS. The solicitation requires renewal of all valves and remote operation hardware, which is defined as the physical hardware needed to operate valves remotely by reach rod or electronic means. Deck boxes would be considered for replacement through a change request since the full extent of needed repairs cannot be known until inspection is completed. The related federal contract opportunity is solicitation number 70Z080-20-Q-P45A4100 for dry dock services on the USCGC VIGOROUS in fiscal year 2020. The Department of Homeland Security US Coast Guard is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC VIGOROUS FY20 DRY DOCK, newest first.
File Type Posted
Amendment 00019.pdf PDF
Amendment 00018_Page 1 of 2.pdf PDF
Amendment 00017_Page 1 of 2.pdf PDF
Amendment 00017_Page 2 of 2.pdf PDF
Amendment 00016.pdf PDF
Amendment 00015_Page 2 of 2.pdf PDF
Amendment 00015_Page 1 of 2.pdf PDF
Amendment 00014_Page 2 of 2.pdf PDF
Amendment 00014_Page 1 of 2.pdf PDF
Amendment 00013.pdf PDF
Amendment 00012.pdf PDF
Amendment 00007.zip ZIP file
Amendment 00008.zip ZIP file
Amendment 00011_Page 2 of 2.pdf PDF
Amendment 00011_Page 1 of 2.pdf PDF
Amendment 00010.zip ZIP file
Amendment 00009.zip ZIP file
Amendment 00006.zip ZIP file
Amendment 00005_627-WMEC_61 - BoM- Steam.Feed-n-Cond.pdf PDF
Amendment 00005_627-WMEC_521_2 - FM Sprink-n-Washdown Arrgt.MainDeck-n-Above.pdf PDF
Amendment 00005_627-WMEC_22 - BoM- SeaChests.pdf PDF
Amendment 00005_627-WMEC_521_1 - FM Sprink-n-Washdown Arrgt.pdf PDF
Amendment 00005_627-WMEC_529_3 - Bilge Sys.Machy Space Arrgt.pdf PDF
Amendment 00005_627-WMEC_163_1 - MainProp.Sea Chests Arrgt.pdf PDF
Amendment 00005_015174281 Parts List for HUB-CMP245.06.pdf PDF
Amendment 00005_627-WMEC_9 - BoM- FM Sprink-n-Washdown 2dck-n-below.pdf PDF
Amendment 00005_Page 1 of 2.pdf PDF
Amendment 00005_627-WMEC_535_1 - Steam.Feed-n-Cond Sys Piping.pdf PDF
Amendment 00005_Page 2 of 2.pdf PDF
Amendment 00005_627-WMEC_521_4 - FM Sys Details.pdf PDF
Amendment 00005_015174281 Parts List for A066NM04109.pdf PDF
Amendment 00004_Page 2 of 2.pdf PDF
Amendment 00004_Page 1 of 2.pdf PDF
Amendment 00003_Page 1 of 2.pdf PDF
Amendment 00003_Page 2 of 2.pdf PDF
Amendment 00002_Page 1 of 2.pdf PDF
Amendment 00001_Page 2 of 2.pdf PDF
Amendment 00001_Page 1 of 2.pdf PDF
Amendment 00002_Page 2 of 2.pdf PDF
Combined Synopsis Solicitation - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Schedule of Services - USCGC VIGOROUS FY20 DD - 70Z08020QP45A4100.xls.xlsx XLSX spreadsheet
Statement of Work - USCGC VIGOROUS FY20 DRY DOCK - 70Z08020QP45A4100.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

Work Item 25: The government did not provide an answer for: Paragraph 3.4 directs the contractor to, "renew all valves and the remote operation hardware".

What specifically is the government considering to be "the remote operation hardware"?

Answer :

Remote Operated Hardware is the physical hardware required to operate the valve(s) remotely, whether by Reach Rod or electronic.

Question:

Work Item 25: In Amendment 017 the government indicated that "If deck boxes were found to be faulty it would include them".

This is not an acceptable requirement. The contractor has no way of knowing without an in-depth inspection, whether or not the deck boxes would need replacement.

Will the government handle the replacement of remote operation hardware, to include the deck boxes on a Change Request after inspection?

Answer:

A CR is adequate method unless it has already been called out in the specification, we understand the full extent cannot be known until after an inspection has been completed.