SB1341-14-RP-0017 Site Metering
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
See Attached
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 4-85) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
20b. SIGNATURE 20c. OFFER DATE
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 63 SB1341-14-RP-0017
The total period of performance for the contract will be 18 months from the date of award. The period of performance for each CLIN specifies the time the work for that CLIN must be performed. The period of performances specified for each CLIN does NOT extend the total period of performance for the contract.
BASE BID BUILDINGS
0001 Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for following Base Bid buildings:
Buildings 236, 301, 303 and 312.
Period of performance for base bid will be 180 days from
NTP
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
FOB : Destination
1.00 JB
Health and Safety Plan
0002 Contractor shall provide a project specific Construction Health and Safety Plan within 14 days of contract award.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
1.00 EA
OPTION 1
0003 Option-1 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 101
Period of performance will be 100 days from the start date specified in the Notice to Proceed (NTP) issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 2
PAGE 4 OF 63 SB1341-14-RP-0017
0004 Option-2 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 202
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 3
0005 Option-3 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 203 ( SRM warehouse )
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 4
0006 Option-4 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 215
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 5
0007 Option-5 to be awarded prior to Sept 30, 2014 1.00 JB
PAGE 5 OF 63 SB1341-14-RP-0017
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 220
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 6
0008 Option-6 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 227
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 7
0009 Option-7 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 230
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 8
0010 Option-8 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached
PAGE 6 OF 63 SB1341-14-RP-0017
statement work, specifications and construction drawings for Building 221
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
OPTION 9
0011 Option-9 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 222
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 10
0012 Option-10 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 223
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 11
0013 Option-11 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for
PAGE 7 OF 63 SB1341-14-RP-0017
Building 224
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
OPTION 12
0014 Option-12 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 225
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 13
0015 Option-13 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 226
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 14
0016 Option-14 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 231
PAGE 8 OF 63 SB1341-14-RP-0017
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
OPTION 15
0017 Option-15 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 233
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 16
0018 Option-16 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 235
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 17
0019 Option-17 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 237
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PAGE 9 OF 63 SB1341-14-RP-0017
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
OPTION 18
0020 Option-18 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 245
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 19
0021 Option-19 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 302
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 20
0022 Option-20 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 304
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
PAGE 10 OF 63 SB1341-14-RP-0017
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
OPTION 21
0023 Option-21 to be awarded prior to Sept 30, 2014
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 320
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 22
0024 Option-22 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 221
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 23
0025 Option-23 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 222
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
PAGE 11 OF 63 SB1341-14-RP-0017
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
OPTION 24
0026 Option-24 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 223
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 25
0027 Option-25 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 224
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 26
0028 Option-26 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 225
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
PAGE 12 OF 63 SB1341-14-RP-0017
OPTION 27
0029 Option-27 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 226
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 28
0030 Option-28 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 231
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 29
0031 Option-29 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 233
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
PAGE 13 OF 63 SB1341-14-RP-0017
OPTION 30
0032 Option-30 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 235
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 31
0033 Option-31 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 237
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 32
0034 Option-32 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 245
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 33
PAGE 14 OF 63 SB1341-14-RP-0017
Option-33 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 302
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 34
0036 Option-34 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 304
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
OPTION 35
0037 Option-35 to be awarded prior to Sept 30, 2015
Contractor shall provide all materials, labor and equipment to perform construction services per attached statement work, specifications and construction drawings for Building 320
Period of performance will be 100 days from the start date specified in the NTP issued for this option.
PR NUMBER: NB195000-14-01247
SHIP TO:
NATIONAL INST OF STDS AND TECHNOLOGY
BUILDING 301 SHIPPING AND RECEIVING
100 BUREAU DRIVE
GAITHERSBURG MD 20899-0001
Table of Contents
PAGE 15 OF 63 SB1341-14-RP-0017
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
B. 1 Disclosure of the Magnitude of Construction Projec
SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 1 Section C-Statment of Work
SECTION E INSPECTION AND ACCEPTANCE
E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E. 2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
SECTION F DELIVERIES OR PERFORMANCE
F. 1 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
F. 3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
SECTION G CONTRACT ADMINISTRATION DATA
G. 1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
G. 2 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)
SECTION H SPECIAL CONTRACT REQUIREMENTS
H. 1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)
H. 2 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
H. 3 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)
H. 4 1352.228-70 INSURANCE COVERAGE (APR 2010)
H. 5 1352.237-75 KEY PERSONNEL (APR 2010)
H. 6 General Decision Number MD130057.pdf
SECTION I CONTRACT CLAUSES
I. 1 52.202-1 DEFINITIONS (NOV 2013)
I. 2 52.203-3 GRATUITIES (APR 1984)
I. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)
I. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
I. 5 52.203-7 ANTI-KICKBACK PROCEDURES (OCT 2010)
I. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY
(JAN 1997)
I. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
I. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
I. 9 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
I. 10 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
I. 11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JULY 2013). 35
I. 12 52.209-6 PROTECTING THE GOVERNMENT` INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)
I. 13 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
I. 14 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
I. 15 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JUL 2013)
I. 16 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
I. 17 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (JUL 2013)
I. 18 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
I. 19 52.222-3 CONVICT LABOR (JUN 2003)
I. 20 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME COMPENSATION (JUL 2005).. 36
I. 21 52.222-6 DAVIS-BACON ACT (JUL 2005)
PAGE 16 OF 63 SB1341-14-RP-0017
I. 22 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)
I. 23 52.222-8 PAYROLLS AND BASIC RECORDS (JUN 2010)
I. 24 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
I. 25 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
I. 26 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (JUL 2005)
I. 27 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)
I. 28 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB 1988)
I. 29 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
I. 30 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)
I. 31 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
I. 32 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)
I. 33 52.222-26 EQUAL OPPORTUNITY (MAR 2007)
I. 34 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)
I. 35 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [SEP 2010]
I. 36 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010
I. 37 52.222-37 EMPLOYMENT REPORTS VETERANS (SEP 2010)
I. 38 52.222-38 COMPLIANCE WITH VETERANs` EMPLOYMENT REPORTING REQUIREMENTS (SEP 2010)
I. 39 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
I. 40 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2012)
I. 41 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
I. 42 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I. 43 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011). 37
I. 44 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
I. 45 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I. 46 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)
I. 47 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)
I. 48 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
I. 49 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
I. 50 52.228-11 PLEDGES OF ASSETS (JAN 2012)
I. 51 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (OCT 1995)
I. 52 52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)
I. 53 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)
I. 54 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I. 55 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (SEP 2002)
I. 56 52.232-17 INTEREST (OCT 2010)
I. 57 52.232-18 AVAILABILITY OF FUNDS (APR 1984)
I. 58 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)
I. 59 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JUL 2013)
I. 60 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013)... 39
I. 61 52.233-1 DISPUTES (JUL 2002)
I. 62 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I. 63 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I. 64 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
I. 65 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
I. 66 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
I. 67 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
I. 68 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
I. 69 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
I. 70 52.236-8 OTHER CONTRACTS (APR 1984)
I. 71 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (APR 1984)
PAGE 17 OF 63 SB1341-14-RP-0017
I. 72 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
I. 73 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
I. 74 52.236-12 CLEANING UP (APR 1984)
I. 75 52.236-13 ACCIDENT PREVENTION (NOV 1991)
I. 76 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
I. 77 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
I. 78 52.236-17 LAYOUT OF WORK (APR 1984)
I. 79 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
I. 80 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
I. 81 52.242-13 BANKRUPTCY (JUL 1995)
I. 82 52.242-14 SUSPENSION OF WORK (APR 1984)
I. 83 52.243-4 CHANGES (JUN 2007)
I. 84 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2013)
I. 85 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
I. 86 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2010)
I. 87 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)--
ALTERNATE I (SEP 1996)
I. 88 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
I. 89 52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
I. 90 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
I. 91 52.222-5 DAVIS-BACON ACT -- SECONDARY SITE OF THE WORK (JUL 2005)
I. 92 52.225-9 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (SEP 2010)
I. 93 52.228-1 BID GUARANTEE (SEP 1996)
I. 94 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I. 95 NIST LOCAL-04 BILLING INSTRUCTIONS
SECTION J LIST OF ATTACHMENTS
J. 1 Section J
SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K. 1 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
K. 2 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
K. 3 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2014)
K. 4 52.215-6 PLACE OF PERFORMANCE (OCT 1997)
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L. 1 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
L. 2 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
L. 3 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
L. 4 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
L. 5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
L. 6 1352.242-70 POSTAWARD CONFERENCE (APR 2010)
L. 7 52.216-1 TYPE OF CONTRACT (APR 1984)
L. 8 52.222-5 DAVIS-BACON ACT -- SECONDARY SITE OF THE WORK (JUL 2005)
L. 9 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS (FEB 2009)
L. 10 52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (FEB 2009)
L. 11 52.233-2 SERVICE OF PROTEST (SEP 2006)
L. 12 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L. 13 1352.215-72 INQUIRIES (APR 2010)
PAGE 18 OF 63 SB1341-14-RP-0017
L. 14 1352.233-70 AGENCY PROTESTS (APR 2010)
L. 15 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)
L. 16 1352.270-71 PRE-BID / PRE-PROPOSAL CONFERENCE AND SITE VISIT (APR 2010)
L. 17 1352.215-70 Proposal Preparation
SECTION M EVALUATION FACTORS FOR AWARD
M. 1 1352.215-75 Evaluation criteria
PAGE 19 OF 63 SB1341-14-RP-0017
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B. 1 Disclosure of the Magnitude of Construction Projec
36.204 Disclosure of the Magnitude of Construction Projects
The estimated price for this requirement as described in terms of the following price ranges is:
( ) Less than $25,000.
( ) Between $25,000 and $100,000.
( ) Between $100,000 and $250,000.
( ) Between $250,000 and $500,000.
( ) Between $500,000 and $1,000,000.
(X) Between $1,000,000 and $5,000,000.
( ) Between $5,000,000 and $10,000,000.
( ) More than $10,000,000
PAGE 20 OF 63 SB1341-14-RP-0017
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C. 1 Section C-Statment of Work
Section C:
Below attachments are hereby incorporated by reference.
Specifications.pdf
BUILDING101-PLOTFILE.pdf
BUILDING202-PLOTFILE.pdf
BUILDING203-PLOTFILE.pdf
BUILDING206-PLOTFILE.pdf
BUILDING215-PLOTFILE.pdf
BUILDING220-PLOTFILE.pdf
BUILDING221-PLOTFILE.pdf
BUILDING222-PLOTFILE.pdf
BUILDING223-PLOTFILE.pdf
BUILDING224-PLOTFILE.pdf
BUILDING225-PLOTFILE.pdf
BUILDING226-PLOTFILE.pdf
BUILDING227-PLOTFILE.pdf
BUILDING230-PLOTFILE.pdf
BUILDING231-PLOTFILE.pdf
BUILDING233-PLOTFILE.pdf
BUILDING235-PLOTFILE.pdf
BUILDING236-PLOTFILE.pdf
BUILDING237-PLOTFILE.pdf
BUILDING245-PLOTFILE.pdf
BUILDING301-PLOTFILE.pdf
PAGE 21 OF 63 SB1341-14-RP-0017
BUILDING302-PLOTFILE.pdf
BUILDING303-PLOTFILE.pdf
BUILDING304-PLOTFILE.pdf
BUILDING312-PLOTFILE.pdf
BUILDING320-PLOTFILE.pdf
PAGE 22 OF 63 SB1341-14-RP-0017
SECTION E
INSPECTION AND ACCEPTANCE
E. 1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(Reference 52.246-12)
E. 2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
(Reference 1352.246-70)
PAGE 23 OF 63 SB1341-14-RP-0017
SECTION F
DELIVERIES OR PERFORMANCE
F. 1 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
(Reference 1352.270-70)
F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 180 calendar days after date of Notice to Proceed for CLIN 0001 and within the number of days specified under each option CLIN when/if exercised. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
ADDENDUM TO 52.211-12
The liquidated damages rate is for EACH CLIN based on the NTP if/when issued for that CLIN.
F. 3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of a one time legal fee of $392.81 and $203.35 for EACH CLIN for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor`s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
PAGE 24 OF 63 SB1341-14-RP-0017
SECTION G
CONTRACT ADMINISTRATION DATA
G. 1 1352.201-70 CONTRACTING OFFICER?s AUTHORITY (APR 2010)
(Reference 1352.201-70)
G. 2 1352.201-72 CONTRACTING OFFICER?s REPRESENTATIVE (C0R) (APR 2010)
(a) TBD is hereby designated as the Contracting Officer?s Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:
National Institute of Standards and Technology, 100 Bureau Drive, Gaithersburg, MD 20899-1604 Phone Number: 301-975-XXXX Email: TBD@nist.gov
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer.
The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
(End of clause)
PAGE 25 OF 63 SB1341-14-RP-0017
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H. 1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)
(Reference 1352.208-70)
H. 2 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
(Reference 1352.209-73)
H. 3 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)
(Reference 1352.228-72)
H. 4 1352.228-70 INSURANCE COVERAGE (APR 2010)
(a) Workers Compensation and Employer?s Liability. The contractor is required to comply with applicable federal and state workers'' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer?s liability section of the insurance policy, except when contract operations are so commingled with a contractor?s commercial operations that it would not be practical to require this coverage. Employer?s liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers'' compensation to be written by private carriers.
(b) General liability.
(1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) When special circumstances apply in accordance with FAR 28.307-2(b), Property Damage Liability Insurance shall be required in the amount of $500,000 .
(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.
Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.
H. 5 1352.237-75 KEY PERSONNEL (APR 2010)
(a) The contractor shall assign to this contract the following key personnel:
ASME Certified Welder Number 1 ASME Certified Welder Number 2
(b) The contractor shall obtain the consent of the Contracting Officer prior to making key personnel substitutions. Replacements for key personnel must possess qualifications equal to or exceeding the qualifications of the personnel being replaced, unless an exception is approved by the Contracting Officer.
(c) Requests for changes in key personnel shall be submitted to the Contracting Officer at least 15 working days prior to making any permanent substitutions. The request should contain a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. The
PAGE 26 OF 63 SB1341-14-RP-0017
Contracting Officer will notify the contractor within 10 working days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes.
H. 6 General Decision Number MD130057.pdf
PAGE 27 OF 63 SB1341-14-RP-0017
General Decision Number: MD130057 08/23/2013 MD57
Superseded General Decision Number: MD20120081
State: Maryland
Construction Type: Building
County: Montgomery County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/04/2013
1 01/25/2013
2 02/01/2013
3 02/22/2013
4 03/29/2013
5 04/05/2013
6 05/10/2013
7 06/07/2013
8 06/28/2013
9 07/05/2013
10 07/12/2013
11 08/02/2013
12 08/23/2013
ASBE0024-007 10/01/2012
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 33.13 13.60
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
ASBE0024-010 10/01/2012
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 20.86 5.61
BRMD0001-006 05/01/2011
TILE SETTER......................$ 25.29 9.89
PAGE 28 OF 63 SB1341-14-RP-0017
BRMD0001-009 05/01/2011
TILE FINISHER....................$ 20.48 8.74
BRMD0001-011 05/01/2012
BRICKLAYER (Excluding
Pointing, Caulking and
Cleaning)........................$ 27.89 7.76
BRMD0001-012 05/01/2011
MASON - STONE....................$ 32.88 13.99
CARP0132-017 05/01/2013
CARPENTER (Including
Acoustical Ceiling
Installation, Drywall
Hanging, Metal Stud
Installation and Form Work)......$ 26.81 8.13
CARP1831-002 04/01/2012
MILLWRIGHT.......................$ 27.96 12.20
ELEC0026-021 09/01/2012
ELECTRICIAN (Communication and Sound Equipment).............$ 25.55 3%+7.77
ELEC0026-022 06/03/2013
ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 40.65 14.42+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin
Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after
Thanksgiving Day and Christmas Day.
PAGE 29 OF 63 SB1341-14-RP-0017
ELEV0010-001 01/01/2013
ELEVATOR MECHANIC................$ 39.96 25.185+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for
6 months to 5 years of service as vacation pay credit.
ENGI0077-018 05/01/2013
OPERATOR: Bulldozer.............$ 31.65 8.45+a
OPERATOR: Loader
Front End Loaders 3 1/2 cubic yards and above.......$ 32.40 8.45+a
Front End Loaders Below 3
1/2 cubic yards.............$ 31.65 8.45+a a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration
Day, Independence Day, Labor Day, Martin Luther King's
Birthday, Veterans' Day, Thanksgiving Day, Friday after
Thanksgiving and Christmas Day.
IRON0005-005 06/01/2013
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 30.00 16.04
IRON0201-006 05/01/2012
IRONWORKER, REINFORCING..........$ 26.50 16.68
LABO0657-017 06/01/2012
LABORER: Mason Tender -
Cement/Concrete..................$ 21.26 6.83
LABORER: Pipelayer..............$ 21.26 6.83
PAIN0051-014 06/01/2013
PAGE 30 OF 63 SB1341-14-RP-0017
GLAZIER
Glazing Contracts $2 million and under...........$ 24.30 9.61
Glazing Contracts over $2 million.....................$ 27.64 9.61
PAIN0051-019 06/01/2013
PAINTER
Brush, Roller, Spray and
Drywall Finisher/Taper......$ 24.89 8.91
Industrial..................$ 29.18 8.91
PLAS0891-005 07/01/2012
PLASTERER........................$ 28.33 5.85
PLAS0891-006 05/01/2010
CEMENT MASON/CONCRETE FINISHER...$ 27.15 9.58
PLAS0891-008 08/01/2011
PLASTERER (Fireproofing
Including Sprayer, Mixer, and
Handler)
Handler.....................$ 15.00 3.89
Mixer/Pump..................$ 17.00 3.89
Sprayer.....................$ 21.50 3.89
* PLUM0005-010 08/01/2013
PLUMBER..........................$ 38.17 16.25+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's
Day, Martin Luther King's Birthday, Memorial Day and the
Fourth of July.
PLUM0602-011 08/01/2012
PIPEFITTER (Including HVAC
PAGE 31 OF 63 SB1341-14-RP-0017
Pipe and System Installation)....$ 37.62 18.07+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's
Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after
Thanksgiving and Christmas Day.
ROOF0030-016 09/01/2012
ROOFER...........................$ 26.90 10.18
SFMD0669-001 07/01/2013
SPRINKLER FITTER (Fire
Sprinklers)......................$ 31.14 17.62
SHEE0100-015 07/01/2013
SHEET METAL WORKER (Including
HVAC Duct Installation)..........$ 39.93 15.38
SUMD2010-091 08/04/2010
LABORER
Common or General...........$ 14.15 2.30
Grade Checker...............$ 16.00 2.90
Landscape...................$ 9.23
Mason Tender - Brick........$ 13.00 0.00
Mason Tender - Stone........$ 14.03 0.00
Mason Tender for Pointing, Caulking and Cleaning.......$ 13.21
Mortar Mixer................$ 16.61 9.08
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.19 0.00
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38
Backhoe.....................$ 19.82 5.02
Bobcat/Skid Loader..........$ 18.05 8.78
PAGE 32 OF 63 SB1341-14-RP-0017
Boom........................$ 21.44 8.29
Crane.......................$ 20.95 6.18
Excavator...................$ 20.00 0.00
Forklift....................$ 16.00 5.12
Gradall.....................$ 20.50 8.42
Grader/Blade................$ 14.50 5.18
Paver.......................$ 17.47 6.36
Roller excluding Asphalt....$ 17.60 3.88
TERRAZZO WORKER/SETTER...........$ 19.94 6.54
TRUCK DRIVER
Dump Truck..................$ 15.90 1.12
Tractor Haul Truck..........$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the
PAGE 33 OF 63 SB1341-14-RP-0017
rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request
PAGE 34 OF 63 SB1341-14-RP-0017
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions…